Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CUTOFF WALL CONSTRUCTION METHOD
To provide a cutoff wall construction method capable of using a compact single axis boring machine with excellent workability even in narrow situations such as in an urban area.SOLUTION: A cutoff wall A construction method comprises; a step to erect in a preceding pile bore 16 a core member 18 with a guide function preventing its deviation; a step to form a following pile hole 17 placed over between both of adjacent previous piles 25, 25 by rotating a bit 3 with a ring between the core members 18, 18 with a guide function preventing its deviation after forming the previous piles 25 in intervals through filling low strength solidification material 24 in the preceding pile bores 16; and a step to form a following pile 27 through filling solidification material 26 in the following pile bore 17, which can cut off water between both of the following piles 25, 25.SELECTED DRAWING: Figure 4
【課題】小型の単軸ボーリング機を用いることができ、都市部等の狭隘部においても施工性に優れた遮水壁の構築方法の提供。【解決手段】遮水壁Aの構築方法は、先行杭孔16に逸脱防止ガイド兼用芯材18を建て込み、先行杭孔16に低強度固化材24を充填して間隔を置いて先行杭25を形成した後、両逸脱防止ガイド兼用芯材18,18間でリング付きビット3を回転させ、隣り合う両先行杭25,25間に跨る後行杭孔17を形成し、後行杭孔17に固化材26を充填して後行杭27を形成し、両先行杭25,25間を遮水することができる。【選択図】図4
CUTOFF WALL CONSTRUCTION METHOD
To provide a cutoff wall construction method capable of using a compact single axis boring machine with excellent workability even in narrow situations such as in an urban area.SOLUTION: A cutoff wall A construction method comprises; a step to erect in a preceding pile bore 16 a core member 18 with a guide function preventing its deviation; a step to form a following pile hole 17 placed over between both of adjacent previous piles 25, 25 by rotating a bit 3 with a ring between the core members 18, 18 with a guide function preventing its deviation after forming the previous piles 25 in intervals through filling low strength solidification material 24 in the preceding pile bores 16; and a step to form a following pile 27 through filling solidification material 26 in the following pile bore 17, which can cut off water between both of the following piles 25, 25.SELECTED DRAWING: Figure 4
【課題】小型の単軸ボーリング機を用いることができ、都市部等の狭隘部においても施工性に優れた遮水壁の構築方法の提供。【解決手段】遮水壁Aの構築方法は、先行杭孔16に逸脱防止ガイド兼用芯材18を建て込み、先行杭孔16に低強度固化材24を充填して間隔を置いて先行杭25を形成した後、両逸脱防止ガイド兼用芯材18,18間でリング付きビット3を回転させ、隣り合う両先行杭25,25間に跨る後行杭孔17を形成し、後行杭孔17に固化材26を充填して後行杭27を形成し、両先行杭25,25間を遮水することができる。【選択図】図4
CUTOFF WALL CONSTRUCTION METHOD
遮水壁の構築方法
MIUCHI TAKASHI (Autor:in) / TAEK SI MIN (Autor:in) / ENDO YUKIO (Autor:in) / UOMI HARUFUMI (Autor:in) / OBA NOBUYUKI (Autor:in) / KIYONO OSAMU (Autor:in)
10.10.2019
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Composite Cutoff Wall Construction
Online Contents | 2016
|CUTOFF EXTERIOR WALL STRUCTURE AND CONSTRUCTION METHOD OF CUTOFF EXTERIOR WALL STRUCTURE
Europäisches Patentamt | 2024
|CUTOFF STEEL MEMBER AND CONSTRUCTION METHOD OF CUTOFF WALL USING THEREOF
Europäisches Patentamt | 2019
|Construction method of vertical cutoff wall foundation
Europäisches Patentamt | 2021
|Construction method of underwater concrete cutoff wall
Europäisches Patentamt | 2021
|