Construction method of vertical cutoff wall foundation
The present invention relates to a vertical cutoff wall foundation construction method capable of enabling a whole vertical cutoff wall foundation to be moved as an integrated structure by easily connecting horizontal rebars between preceding and following panels spaced apart from each other, in regard to the construction of an underground vertical cutoff wall foundation. The present invention comprises the following steps of: (a) excavating preceding trenches of a predetermined width on a position, in which a vertical cutoff wall foundation is expected to be constructed, to be spaced apart from each other in a longitudinal direction of the vertical cutoff wall foundation; (b) inserting a rebar module comprising a first rebar mesh and joint boxes provided at both ends of the first rebar mesh, into the preceding trenches; (c) placing concrete in the preceding trenches; (d) pulling and removing an opening/closing plate of the joint boxes before the curing of the concrete in the preceding trenches; (e) excavating a following trench between adjacent preceding trenches; (f) inserting a second rebar mesh into the following trench to connect a horizontal rebar to a horizontal rebar inserted into a box body of a pre-constructed joint box; and (g) placing concrete in the following trench and the box body of the joint box.
본 발명은 지하 연직차수벽기초를 시공함에 있어, 상호 이격되는 선후행패널 간 수평철근을 쉽게 이음하여 연직차수벽기초 전체가 일체화된 구조체로 거동할 수 있는 연직차수벽기초의 시공 방법에 대한 것이다. 본 발명은 (a) 연직차수벽기초가 시공될 위치에 일정한 폭의 선행트렌치를 연직차수벽기초의 길이 방향으로 상호 이격되게 굴착하는 단계; (b) 상기 선행트렌치의 내부에 제1철근망 및 상기 제1철근망의 양단에 구비되는 조인트박스로 구성되는 철근모듈을 삽입하는 단계; (c) 상기 선행트렌치의 내부에 콘크리트를 타설하는 단계; (d) 상기 선행트렌치 내부의 콘크리트가 양생되기 전에 조인트박스의 개폐판을 인발하여 제거하는 단계; (e) 이웃하는 선행트렌치 사이의 후행트렌치를 굴착하는 단계; (f) 상기 후행트렌치 내부에 제2철근망을 삽입하여 수평철근을 선행 시공된 조인트박스의 박스 본체 내로 인입된 수평철근과 이음하는 단계; 및 (g) 상기 후행트렌치 및 조인트박스의 박스 본체 내부에 콘크리트를 타설하는 단계; 로 구성된다.
Construction method of vertical cutoff wall foundation
The present invention relates to a vertical cutoff wall foundation construction method capable of enabling a whole vertical cutoff wall foundation to be moved as an integrated structure by easily connecting horizontal rebars between preceding and following panels spaced apart from each other, in regard to the construction of an underground vertical cutoff wall foundation. The present invention comprises the following steps of: (a) excavating preceding trenches of a predetermined width on a position, in which a vertical cutoff wall foundation is expected to be constructed, to be spaced apart from each other in a longitudinal direction of the vertical cutoff wall foundation; (b) inserting a rebar module comprising a first rebar mesh and joint boxes provided at both ends of the first rebar mesh, into the preceding trenches; (c) placing concrete in the preceding trenches; (d) pulling and removing an opening/closing plate of the joint boxes before the curing of the concrete in the preceding trenches; (e) excavating a following trench between adjacent preceding trenches; (f) inserting a second rebar mesh into the following trench to connect a horizontal rebar to a horizontal rebar inserted into a box body of a pre-constructed joint box; and (g) placing concrete in the following trench and the box body of the joint box.
본 발명은 지하 연직차수벽기초를 시공함에 있어, 상호 이격되는 선후행패널 간 수평철근을 쉽게 이음하여 연직차수벽기초 전체가 일체화된 구조체로 거동할 수 있는 연직차수벽기초의 시공 방법에 대한 것이다. 본 발명은 (a) 연직차수벽기초가 시공될 위치에 일정한 폭의 선행트렌치를 연직차수벽기초의 길이 방향으로 상호 이격되게 굴착하는 단계; (b) 상기 선행트렌치의 내부에 제1철근망 및 상기 제1철근망의 양단에 구비되는 조인트박스로 구성되는 철근모듈을 삽입하는 단계; (c) 상기 선행트렌치의 내부에 콘크리트를 타설하는 단계; (d) 상기 선행트렌치 내부의 콘크리트가 양생되기 전에 조인트박스의 개폐판을 인발하여 제거하는 단계; (e) 이웃하는 선행트렌치 사이의 후행트렌치를 굴착하는 단계; (f) 상기 후행트렌치 내부에 제2철근망을 삽입하여 수평철근을 선행 시공된 조인트박스의 박스 본체 내로 인입된 수평철근과 이음하는 단계; 및 (g) 상기 후행트렌치 및 조인트박스의 박스 본체 내부에 콘크리트를 타설하는 단계; 로 구성된다.
Construction method of vertical cutoff wall foundation
연직차수벽기초의 시공 방법
HONG TAE HO (Autor:in) / LEE HAE NA (Autor:in)
07.10.2021
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation cutoff wall -- Allegheny reservoir dam
Engineering Index Backfile | 1966
|Composite Cutoff Wall Construction
Online Contents | 2016
|CUTOFF EXTERIOR WALL STRUCTURE AND CONSTRUCTION METHOD OF CUTOFF EXTERIOR WALL STRUCTURE
Europäisches Patentamt | 2024
|VERTICAL WALL TYPE SOUNDPROOF WALL FOUNDATION CONSTRUCTION
Europäisches Patentamt | 2019
|