Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
WELDING EQUIPMENT USED FOR WELDING REINFORCEMENT CAGE FOR SUSPENSION BRIDGE
To disclose welding equipment used for a suspension bridge.SOLUTION: A base and a fixed-shaped annular frame installed on a top part end surface of the base are included, and a fixed block fixedly connected to the base top part end surface is installed on a bottom part end surface of the fixed-shaped annular frame, and a first guide shoe having an opening in the upward direction and positioned on the right end of the fixed block is installed on a top part end surface of the base, and a first guide slide block is slidably engaged-connected in the first guide shoe, and a welding annular frame positioned on the right end of the fixed-shaped annular frame is fixedly connected to the top part end surface of the first guide slide block, and a laterally extending first adjustment bolt is engaged-connected by a screw with-to the first guide slide block, and a first electric motor is connected by power to the left terminal end of the first adjustment bolt, and an upper part of the first electric motor is fitted and installed in a left end inner wall of the first guide shoe, and is fixedly connected to it.SELECTED DRAWING: Figure 1
【課題】本発明は架け橋に利用する溶接設備を開示した。【解決手段】ベースおよび前記ベースの頂部端面に設置される定形環状枠を含み、前記定形環状枠の底部端面に前記ベース頂部端面に固定接続される固定ブロックが設置され、前記ベースの頂部端面に開口が上向きで且つ前記固定ブロックの右端に位置する第一ガイドシュートが設置され、前記第一ガイドシュートの中に第一ガイド滑りブロックが滑り係合接続され、前記第一ガイド滑りブロックの頂部端面に前記定形環状枠の右端に位置する溶接環状枠が固定接続され、前記第一ガイド滑りブロックに左右伸びる第一調節ボルトがねじで係合接続され、前記第一調節ボルトの左端末端に第一電動機が動力で接続され、前記第一電動機のうわべが前記第一ガイドシュートの左端内壁に嵌め込み設置され、且つそれに固定接続される。【選択図】図1
WELDING EQUIPMENT USED FOR WELDING REINFORCEMENT CAGE FOR SUSPENSION BRIDGE
To disclose welding equipment used for a suspension bridge.SOLUTION: A base and a fixed-shaped annular frame installed on a top part end surface of the base are included, and a fixed block fixedly connected to the base top part end surface is installed on a bottom part end surface of the fixed-shaped annular frame, and a first guide shoe having an opening in the upward direction and positioned on the right end of the fixed block is installed on a top part end surface of the base, and a first guide slide block is slidably engaged-connected in the first guide shoe, and a welding annular frame positioned on the right end of the fixed-shaped annular frame is fixedly connected to the top part end surface of the first guide slide block, and a laterally extending first adjustment bolt is engaged-connected by a screw with-to the first guide slide block, and a first electric motor is connected by power to the left terminal end of the first adjustment bolt, and an upper part of the first electric motor is fitted and installed in a left end inner wall of the first guide shoe, and is fixedly connected to it.SELECTED DRAWING: Figure 1
【課題】本発明は架け橋に利用する溶接設備を開示した。【解決手段】ベースおよび前記ベースの頂部端面に設置される定形環状枠を含み、前記定形環状枠の底部端面に前記ベース頂部端面に固定接続される固定ブロックが設置され、前記ベースの頂部端面に開口が上向きで且つ前記固定ブロックの右端に位置する第一ガイドシュートが設置され、前記第一ガイドシュートの中に第一ガイド滑りブロックが滑り係合接続され、前記第一ガイド滑りブロックの頂部端面に前記定形環状枠の右端に位置する溶接環状枠が固定接続され、前記第一ガイド滑りブロックに左右伸びる第一調節ボルトがねじで係合接続され、前記第一調節ボルトの左端末端に第一電動機が動力で接続され、前記第一電動機のうわべが前記第一ガイドシュートの左端内壁に嵌め込み設置され、且つそれに固定接続される。【選択図】図1
WELDING EQUIPMENT USED FOR WELDING REINFORCEMENT CAGE FOR SUSPENSION BRIDGE
架け橋用鉄筋ケージの溶接に利用する溶接設備
SHOU JIN XIAO (Autor:in)
21.11.2019
Patent
Elektronische Ressource
Japanisch
WELDING EQUIPMENT USED FOR WELDING REINFORCING-BAR CAGE FOR BRIDGE
Europäisches Patentamt | 2019
|Welding restores corroded suspension bridge eyebars
British Library Online Contents | 1996
Reinforcement cage auxiliary mounting equipment and bridge construction method
Europäisches Patentamt | 2024
|Bridge reinforcement cage stabilizing device and bridge reinforcement mounting method
Europäisches Patentamt | 2024
|