Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
UNDERFLOOR INSPECTION PORT AND STRUCTURE OF ENTRANCE DIRT FLOOR SURROUNDING PART
To facilitate preparation work when underfloor inspection is performed, and to allow an operator performing underfloor inspection to enter an underfloor space from an entrance dirt floor surrounding part.SOLUTION: An underfloor inspection port 1 is provided in an entrance dirt floor surrounding part 100 composed of an entrance dirt floor part 20, an entrance floor part 30 provided in a step-up shape from the entrance dirt floor part 20, a doorway foot 35, and a wall part 40 provided between the doorway foot 35 and the entrance dirt floor part 20. Further, the underfloor inspection port 1 includes an outer frame 2 fitted and fixed in an opening 70 provided in the entrance dirt floor part 20 and the wall part 40, and a lid body 3 fitted in the outer frame 2.SELECTED DRAWING: Figure 2
【課題】床下点検を行う際の準備作業が容易になるとともに、床下点検を行う作業者を玄関土間廻り部から床下空間に侵入させることを可能にする。【解決手段】床下点検口1は、玄関土間部20と、玄関土間部20から段上がり状に設けられた玄関床部30と、上がり框35と、上がり框35と玄関土間部20との間に設けられた壁部40とで構成された玄関土間廻り部100に設けられている。また、床下点検口1は、玄関土間部20及び壁部40に設けられた開口部70に嵌め込んで固定する外枠2と、外枠2の内部に嵌め込まれる蓋体3とを含んでいる。【選択図】図2
UNDERFLOOR INSPECTION PORT AND STRUCTURE OF ENTRANCE DIRT FLOOR SURROUNDING PART
To facilitate preparation work when underfloor inspection is performed, and to allow an operator performing underfloor inspection to enter an underfloor space from an entrance dirt floor surrounding part.SOLUTION: An underfloor inspection port 1 is provided in an entrance dirt floor surrounding part 100 composed of an entrance dirt floor part 20, an entrance floor part 30 provided in a step-up shape from the entrance dirt floor part 20, a doorway foot 35, and a wall part 40 provided between the doorway foot 35 and the entrance dirt floor part 20. Further, the underfloor inspection port 1 includes an outer frame 2 fitted and fixed in an opening 70 provided in the entrance dirt floor part 20 and the wall part 40, and a lid body 3 fitted in the outer frame 2.SELECTED DRAWING: Figure 2
【課題】床下点検を行う際の準備作業が容易になるとともに、床下点検を行う作業者を玄関土間廻り部から床下空間に侵入させることを可能にする。【解決手段】床下点検口1は、玄関土間部20と、玄関土間部20から段上がり状に設けられた玄関床部30と、上がり框35と、上がり框35と玄関土間部20との間に設けられた壁部40とで構成された玄関土間廻り部100に設けられている。また、床下点検口1は、玄関土間部20及び壁部40に設けられた開口部70に嵌め込んで固定する外枠2と、外枠2の内部に嵌め込まれる蓋体3とを含んでいる。【選択図】図2
UNDERFLOOR INSPECTION PORT AND STRUCTURE OF ENTRANCE DIRT FLOOR SURROUNDING PART
床下点検口及び玄関土間廻り部の構造
NAKATANI TETSUYA (Autor:in) / OMITO SEISUKE (Autor:in)
09.01.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
COVER OPENING-CLOSING MECHANISM FOR UNDERFLOOR INSPECTION PORT OR UNDERFLOOR STORAGE SHED
Europäisches Patentamt | 2017
|UNDERFLOOR STORAGE SHED AND COVER BODY FOR INSPECTION PORT
Europäisches Patentamt | 2015
|