Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
COFFERDAM STRUCTURE USED FOR BRIDGE PIER MAINTENANCE AND REINFORCEMENT WORK
To provide a cofferdam structure used for maintenance and reinforcement work of a bridge pier on a complete water cut-off structure.SOLUTION: A plurality of divided wall members 2 form a cofferdam structure A used for bridge pier maintenance and reinforcement work, which is configured in a cylindrical body surrounding the outer periphery of a bridge pier 1, by being connected in the circumferential direction and the height direction of the bridge pier 1 via a water cut-off member 4. The water cut-off member 4 interposed between the adjacent divided wall members 2 is the cofferdam structure used for bridge pier maintenance and reinforcement work, and is composed of a three-layer structural material with a water-swelling seal 6 attached to the front and back surfaces of a packing 5.SELECTED DRAWING: Figure 2
【課題】完全止水構造の橋脚補修・補強工事に用いる仮締切り構造体を提供すること。【解決手段】複数の分割壁材2が、止水材4を介して橋脚1の周方向および高さ方向に連結されることにより橋脚1の外周を囲む筒状体に構成されている橋脚補修・補強工事に用いる仮締切り構造体Aであって、隣接する前記分割壁材2間に介在される前記止水材4は、パッキン5の表裏面に水膨張性シール6が付設された三層構造材に構成されている橋脚補修・補強工事に用いる仮締切り構造体。【選択図】図2
COFFERDAM STRUCTURE USED FOR BRIDGE PIER MAINTENANCE AND REINFORCEMENT WORK
To provide a cofferdam structure used for maintenance and reinforcement work of a bridge pier on a complete water cut-off structure.SOLUTION: A plurality of divided wall members 2 form a cofferdam structure A used for bridge pier maintenance and reinforcement work, which is configured in a cylindrical body surrounding the outer periphery of a bridge pier 1, by being connected in the circumferential direction and the height direction of the bridge pier 1 via a water cut-off member 4. The water cut-off member 4 interposed between the adjacent divided wall members 2 is the cofferdam structure used for bridge pier maintenance and reinforcement work, and is composed of a three-layer structural material with a water-swelling seal 6 attached to the front and back surfaces of a packing 5.SELECTED DRAWING: Figure 2
【課題】完全止水構造の橋脚補修・補強工事に用いる仮締切り構造体を提供すること。【解決手段】複数の分割壁材2が、止水材4を介して橋脚1の周方向および高さ方向に連結されることにより橋脚1の外周を囲む筒状体に構成されている橋脚補修・補強工事に用いる仮締切り構造体Aであって、隣接する前記分割壁材2間に介在される前記止水材4は、パッキン5の表裏面に水膨張性シール6が付設された三層構造材に構成されている橋脚補修・補強工事に用いる仮締切り構造体。【選択図】図2
COFFERDAM STRUCTURE USED FOR BRIDGE PIER MAINTENANCE AND REINFORCEMENT WORK
橋脚補修・補強工事に用いる仮締切り構造体
KOBAYASHI HISATO (Autor:in) / SASAKI KENICHI (Autor:in) / KASUGA HIDEFUMI (Autor:in)
05.03.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2018
|WATER CUT-OFF METHOD FOR COFFERDAM STRUCTURE USED IN BRIDGE PIER REPAIR/REINFORCEMENT WORK
Europäisches Patentamt | 2018
|WATER CUT-OFF METHOD OF COFFERDAM STRUCTURE USED WITH BRIDGE PIER REPAIR/REINFORCEMENT WORK
Europäisches Patentamt | 2018
|CUT-OFF METHOD OF COFFERDAM STRUCTURE USED FOR BRIDGE PIER MAINTENANCE AND REINFORCING WORK
Europäisches Patentamt | 2018
|Europäisches Patentamt | 2023
|