PIER STRUCTURE CONSTRUCTION METHOD AND PIER STRUCTURE
To provide a pier structure construction method and pier structure capable of improving workability.SOLUTION: A pier structure 100 construction method is a method of constructing a pier structure 100 including a pier girder 1 supported by a main pile 2. The pier structure 100 construction method includes: a lifting step S10 of lifting a pier girder unit 10 which constitutes a part of the pier girder 1; and a connecting step S20 of connecting the pier girder unit 10 to an end of an existing pier girder 200 in a drawing direction D1. In the lifting step S10, the pier girder unit 10 is lifted while a first temporary pile 6 is provided at a position on the center side in the drawing direction D1 of the pier girder unit 10. In the connecting step S20, the lower end of the first temporary pile 6 is supported on a ground G, and the height of the pier girder unit 10 is adjusted along the first temporary pile 6.SELECTED DRAWING: Figure 7
【課題】施工性を向上できる桟橋構造の構築方法、及び桟橋構造を提供する。【解決手段】桟橋構造100の構築方法は、本杭2で支持された桟橋桁1を備える桟橋構造100を構築する桟橋構造100の構築方法であって、桟橋桁1の一部を構成する桟橋桁ユニット10を揚重する揚重工程S10と、既設桟橋桁200の延伸方向D1における端部に、桟橋桁ユニット10を連結する連結工程S20と、を備え、揚重工程S10では、桟橋桁ユニット10の延伸方向D1における中央側の位置に第1仮杭6が設けられた状態で、桟橋桁ユニット10を揚重し、連結工程S20では、第1仮杭6の下端を地盤Gに支持させ、第1仮杭6に沿って桟橋桁ユニット10の高さ調整を行う。【選択図】図7
PIER STRUCTURE CONSTRUCTION METHOD AND PIER STRUCTURE
To provide a pier structure construction method and pier structure capable of improving workability.SOLUTION: A pier structure 100 construction method is a method of constructing a pier structure 100 including a pier girder 1 supported by a main pile 2. The pier structure 100 construction method includes: a lifting step S10 of lifting a pier girder unit 10 which constitutes a part of the pier girder 1; and a connecting step S20 of connecting the pier girder unit 10 to an end of an existing pier girder 200 in a drawing direction D1. In the lifting step S10, the pier girder unit 10 is lifted while a first temporary pile 6 is provided at a position on the center side in the drawing direction D1 of the pier girder unit 10. In the connecting step S20, the lower end of the first temporary pile 6 is supported on a ground G, and the height of the pier girder unit 10 is adjusted along the first temporary pile 6.SELECTED DRAWING: Figure 7
【課題】施工性を向上できる桟橋構造の構築方法、及び桟橋構造を提供する。【解決手段】桟橋構造100の構築方法は、本杭2で支持された桟橋桁1を備える桟橋構造100を構築する桟橋構造100の構築方法であって、桟橋桁1の一部を構成する桟橋桁ユニット10を揚重する揚重工程S10と、既設桟橋桁200の延伸方向D1における端部に、桟橋桁ユニット10を連結する連結工程S20と、を備え、揚重工程S10では、桟橋桁ユニット10の延伸方向D1における中央側の位置に第1仮杭6が設けられた状態で、桟橋桁ユニット10を揚重し、連結工程S20では、第1仮杭6の下端を地盤Gに支持させ、第1仮杭6に沿って桟橋桁ユニット10の高さ調整を行う。【選択図】図7
PIER STRUCTURE CONSTRUCTION METHOD AND PIER STRUCTURE
桟橋構造の構築方法、及び桟橋構造
AKIYAMA SADAYUKI (Autor:in) / FUJINUMA SATOSHI (Autor:in) / NIIHARA YUJI (Autor:in) / OGURA TSUYOSHI (Autor:in) / NAKAJIMA TOMOHIRO (Autor:in) / OBA TAKUYA (Autor:in) / MIZUKAMI AKIRA (Autor:in) / YONEJIMA MIKIO (Autor:in) / MORI HIROAKI (Autor:in)
19.03.2020
Patent
Elektronische Ressource
Japanisch
Pier cofferdam structure and pier construction method
Europäisches Patentamt | 2023
|Cover beam structure, pier and pier construction method
Europäisches Patentamt | 2021
|Pier beam structure, construction support platform and construction method of pier beam structure
Europäisches Patentamt | 2024
|Fabricated concrete pier bearing platform structure and pier construction method
Europäisches Patentamt | 2024
|Pier construction device and pier construction method
Europäisches Patentamt | 2024
|