To provide a drain material placing ship capable of efficiently performing various tasks with scaffolding that meets its purpose.SOLUTION: In a drain material placing ship 10, with a drain material placing apparatus 20 for placing a vertical drain material into the soft ground or dredged soil, and scaffolding 30 for performing various tasks including the task of connecting the upper end of the vertical drain material placed into the soft ground with a horizontal drain material arranged on the ground surface side of the soft ground, provided on a barge type platform 11, the scaffolding 30 comprises a main scaffold 31 that is attached outside the barge type platform 11 across placing space K and a protruding scaffold 32 and a crossing bridge 33 that are provided to protrude outward from the main scaffold 31.SELECTED DRAWING: Figure 6
【課題】各種作業を用途に応じた足場で効率良く行うことができるドレーン材打込作業船を提供する。【解決手段】台船11に、軟弱地盤または浚渫土中に鉛直ドレーン材を打設するドレーン材打設機20と、軟弱地盤中に打設された鉛直ドレーン材の上端と軟弱地盤の地表面側に配置された水平ドレーン材とを接続する作業等の各種作業を行う作業足場30と、を設けたドレーン材打込作業船10であって、作業足場30は、台船11の外側に打設空間Kを介して取り付けられた主足場31と、この主足場31より外側へ突出するように取り付けられた張出足場32及び渡足場33と、を備える。【選択図】図6
DRAIN MATERIAL PLACING SHIP
To provide a drain material placing ship capable of efficiently performing various tasks with scaffolding that meets its purpose.SOLUTION: In a drain material placing ship 10, with a drain material placing apparatus 20 for placing a vertical drain material into the soft ground or dredged soil, and scaffolding 30 for performing various tasks including the task of connecting the upper end of the vertical drain material placed into the soft ground with a horizontal drain material arranged on the ground surface side of the soft ground, provided on a barge type platform 11, the scaffolding 30 comprises a main scaffold 31 that is attached outside the barge type platform 11 across placing space K and a protruding scaffold 32 and a crossing bridge 33 that are provided to protrude outward from the main scaffold 31.SELECTED DRAWING: Figure 6
【課題】各種作業を用途に応じた足場で効率良く行うことができるドレーン材打込作業船を提供する。【解決手段】台船11に、軟弱地盤または浚渫土中に鉛直ドレーン材を打設するドレーン材打設機20と、軟弱地盤中に打設された鉛直ドレーン材の上端と軟弱地盤の地表面側に配置された水平ドレーン材とを接続する作業等の各種作業を行う作業足場30と、を設けたドレーン材打込作業船10であって、作業足場30は、台船11の外側に打設空間Kを介して取り付けられた主足場31と、この主足場31より外側へ突出するように取り付けられた張出足場32及び渡足場33と、を備える。【選択図】図6
DRAIN MATERIAL PLACING SHIP
ドレーン材打込作業船
YAMASHITA YUJI (Autor:in) / SHINKAWA NAOTOSHI (Autor:in) / SUZUKI SHINOBU (Autor:in) / MAEDA TADAYOSHI (Autor:in) / KOUSU MANABU (Autor:in) / YOSHIKAWA MASAFUMI (Autor:in) / YAMAUCHI YOSHIFUMI (Autor:in)
18.06.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
METHOD FOR PLACING DRAIN MATERIAL AND DRAIN MATERIAL PLACING DEVICE THEREFOR