METHOD FOR REPLACING HORIZONTAL MATERIAL AT BENDING POINT OF STEEL TOWER
To provide a method for replacing a horizontal member at a bending point of a steel tower, which can suitably release the stress of the horizontal member when removing the horizontal member at the bending point by a plat structure.SOLUTION: The method for replacing a horizontal member at a bending point of a steel tower of the present invention is configured so that in a method for replacing a horizontal member at a bending point P of a steel tower 100 in which the stress of a horizontal member 106 is released and the horizontal member 106 is replaced by forming a plat structure Z using an oblique jig 200 and a horizontal jig 300, the plat structure Z is formed above and below the horizontal member 106 arranged horizontally at the bending point P of the tower 100, and at least one horizontal jig 300 of the upper and lower plat structure Z is placed in the vicinity of the horizontal member 106 at the bending point P.SELECTED DRAWING: Figure 1
【課題】プラット結構によって曲げ点の水平材を取り外す際の水平材の応力を好適に開放することが可能な鉄塔の曲げ点の水平材交換方法を提供することを目的とする。【解決手段】本発明の鉄塔の曲げ点の水平材交換方法の構成は、斜め治具200と水平治具300を用いてプラット結構Zを構成することにより水平材106の応力を開放して水平材106を交換する鉄塔100の曲げ点Pの水平材交換方法において、鉄塔100の曲げ点Pに水平に配置される水平材106の上下にプラット結構Zを構成し、上下のプラット結構Zの少なくとも一方の水平治具300を、曲げ点Pの水平材106の近傍に配置したことを特徴とする。【選択図】図1
METHOD FOR REPLACING HORIZONTAL MATERIAL AT BENDING POINT OF STEEL TOWER
To provide a method for replacing a horizontal member at a bending point of a steel tower, which can suitably release the stress of the horizontal member when removing the horizontal member at the bending point by a plat structure.SOLUTION: The method for replacing a horizontal member at a bending point of a steel tower of the present invention is configured so that in a method for replacing a horizontal member at a bending point P of a steel tower 100 in which the stress of a horizontal member 106 is released and the horizontal member 106 is replaced by forming a plat structure Z using an oblique jig 200 and a horizontal jig 300, the plat structure Z is formed above and below the horizontal member 106 arranged horizontally at the bending point P of the tower 100, and at least one horizontal jig 300 of the upper and lower plat structure Z is placed in the vicinity of the horizontal member 106 at the bending point P.SELECTED DRAWING: Figure 1
【課題】プラット結構によって曲げ点の水平材を取り外す際の水平材の応力を好適に開放することが可能な鉄塔の曲げ点の水平材交換方法を提供することを目的とする。【解決手段】本発明の鉄塔の曲げ点の水平材交換方法の構成は、斜め治具200と水平治具300を用いてプラット結構Zを構成することにより水平材106の応力を開放して水平材106を交換する鉄塔100の曲げ点Pの水平材交換方法において、鉄塔100の曲げ点Pに水平に配置される水平材106の上下にプラット結構Zを構成し、上下のプラット結構Zの少なくとも一方の水平治具300を、曲げ点Pの水平材106の近傍に配置したことを特徴とする。【選択図】図1
METHOD FOR REPLACING HORIZONTAL MATERIAL AT BENDING POINT OF STEEL TOWER
鉄塔の曲げ点の水平材交換方法
OSONO TOMOAKI (Autor:in) / MIKAMI YASUAKI (Autor:in) / IMAIZUMI NORIHIKO (Autor:in) / SAITO YOSHIAKI (Autor:in)
01.10.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
E04G
SCAFFOLDING
,
Baugerüste
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
Europäisches Patentamt | 2022
|Angle steel tower material replacing tool and using method thereof
Europäisches Patentamt | 2021
|Device for replacing main material of transmission tower
Europäisches Patentamt | 2015
|Portable device for replacing iron tower main material clad steel for power transmission line
Europäisches Patentamt | 2016
|