STATIC CRUSHER AND PILE HEAD TREATMENT METHOD
To provide a static crusher and a pile head treatment method capable of easily treating a pile head.SOLUTION: A first static crusher 120 is provided with first static crushing members 120a to 120j. The first static crushing members 120a to 120j are aligned between a plurality of main reinforcement bars 11 in a peripheral direction of a reinforcement cage 10 and are placed on outer peripheral attachment bars 13 and inner peripheral attachment bars 14. The first static crushing members 120a to 120j are placed on the reinforcement cage 10 outside of a tremie pipe area α in a way that a longitudinal axis in an elliptical section substantially runs along a radial direction of the reinforcement cage 10. Thereby, concrete can be efficiently crushed by creating crack to run in the radial direction of the reinforcement cage 10 when material expands in the concrete.SELECTED DRAWING: Figure 2
【課題】容易に杭頭処理を行うことができる静的破砕装置及び杭頭処理方法を得る。【解決手段】第1の静的破砕装置120は第1の静的破砕部材120a〜120jを備える。第1の静的破砕部材120a〜120jは、複数の主筋11の間であって、鉄筋籠10の周方向に並べられ、外周取付筋13と内周取付筋14の上に設置される。第1の静的破砕部材120a〜120jは、トレミー管領域αの外側であって、楕円断面の長軸が鉄筋籠10の径方向に実質的に沿うように、鉄筋籠10に設置される。これにより、材料がコンクリート内で膨張したとき、鉄筋籠10の径方向にひび割れを走らせることができ、コンクリートを効率よく割ることができる。【選択図】図2
STATIC CRUSHER AND PILE HEAD TREATMENT METHOD
To provide a static crusher and a pile head treatment method capable of easily treating a pile head.SOLUTION: A first static crusher 120 is provided with first static crushing members 120a to 120j. The first static crushing members 120a to 120j are aligned between a plurality of main reinforcement bars 11 in a peripheral direction of a reinforcement cage 10 and are placed on outer peripheral attachment bars 13 and inner peripheral attachment bars 14. The first static crushing members 120a to 120j are placed on the reinforcement cage 10 outside of a tremie pipe area α in a way that a longitudinal axis in an elliptical section substantially runs along a radial direction of the reinforcement cage 10. Thereby, concrete can be efficiently crushed by creating crack to run in the radial direction of the reinforcement cage 10 when material expands in the concrete.SELECTED DRAWING: Figure 2
【課題】容易に杭頭処理を行うことができる静的破砕装置及び杭頭処理方法を得る。【解決手段】第1の静的破砕装置120は第1の静的破砕部材120a〜120jを備える。第1の静的破砕部材120a〜120jは、複数の主筋11の間であって、鉄筋籠10の周方向に並べられ、外周取付筋13と内周取付筋14の上に設置される。第1の静的破砕部材120a〜120jは、トレミー管領域αの外側であって、楕円断面の長軸が鉄筋籠10の径方向に実質的に沿うように、鉄筋籠10に設置される。これにより、材料がコンクリート内で膨張したとき、鉄筋籠10の径方向にひび割れを走らせることができ、コンクリートを効率よく割ることができる。【選択図】図2
STATIC CRUSHER AND PILE HEAD TREATMENT METHOD
静的破砕装置及び杭頭処理方法
KOBAYASHI KUMIKO (Autor:in) / TAKAHASHI HIROO (Autor:in)
08.10.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
PILE HEAD TREATMENT METHOD AND PILE HEAD BURIAL BAG USED FOR PILE HEAD TREATMENT
Europäisches Patentamt | 2015
|CRUSHER AND REMOVAL METHOD OF COLUMNAR IMPROVEMENT PILE
Europäisches Patentamt | 2024
|