Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION METHOD FOR STRUCTURE USING PRECAST MEMBER AND MANUFACTURING METHOD FOR PRECAST MEMBER
To provide a construction method for structure using precast member and manufacturing method for precast member with which a structure can be constructed with a designed shape satisfied while both existence of deviation and construction accuracy are achieved.SOLUTION: A construction method for a precast segment bridge includes: a step of obtaining a first virtual segment unit R1a showing a predicted shape of a first segment unit in which segments are virtually combined and obtaining a second virtual segment unit R1b showing a predicted shape of a second segment unit in which segments are virtually combined; and a step of setting a posture for the virtual segment units R1a, R1b so that the difference between the virtual segment units R1a, R1b with respect to target linear models T1a, T1b satisfies a prescribed condition.SELECTED DRAWING: Figure 4
【課題】ずれの存在と施工精度とを両立させることにより、設計された形状を満たす構造物を構築することが可能なプレキャスト部材を用いた構造物の施工方法及び部材の製作方法を提供する。【解決手段】プレキャストセグメント橋を施工する方法は、セグメントを仮想的に組み合わせた第1のセグメントユニットの予測形状を示す第1の仮想セグメントユニットR1aを得ると共に、セグメントを仮想的に組み合わせた第2のセグメントユニットの予測形状を示す第2の仮想セグメントユニットR1bを得る工程と、目標線形T1a、T1bに対する仮想セグメントユニットR1a、R1bの差分が所定の条件を満たすように仮想セグメントユニットR1a、R1bの姿勢を設定する工程と、を有する。【選択図】図4
CONSTRUCTION METHOD FOR STRUCTURE USING PRECAST MEMBER AND MANUFACTURING METHOD FOR PRECAST MEMBER
To provide a construction method for structure using precast member and manufacturing method for precast member with which a structure can be constructed with a designed shape satisfied while both existence of deviation and construction accuracy are achieved.SOLUTION: A construction method for a precast segment bridge includes: a step of obtaining a first virtual segment unit R1a showing a predicted shape of a first segment unit in which segments are virtually combined and obtaining a second virtual segment unit R1b showing a predicted shape of a second segment unit in which segments are virtually combined; and a step of setting a posture for the virtual segment units R1a, R1b so that the difference between the virtual segment units R1a, R1b with respect to target linear models T1a, T1b satisfies a prescribed condition.SELECTED DRAWING: Figure 4
【課題】ずれの存在と施工精度とを両立させることにより、設計された形状を満たす構造物を構築することが可能なプレキャスト部材を用いた構造物の施工方法及び部材の製作方法を提供する。【解決手段】プレキャストセグメント橋を施工する方法は、セグメントを仮想的に組み合わせた第1のセグメントユニットの予測形状を示す第1の仮想セグメントユニットR1aを得ると共に、セグメントを仮想的に組み合わせた第2のセグメントユニットの予測形状を示す第2の仮想セグメントユニットR1bを得る工程と、目標線形T1a、T1bに対する仮想セグメントユニットR1a、R1bの差分が所定の条件を満たすように仮想セグメントユニットR1a、R1bの姿勢を設定する工程と、を有する。【選択図】図4
CONSTRUCTION METHOD FOR STRUCTURE USING PRECAST MEMBER AND MANUFACTURING METHOD FOR PRECAST MEMBER
プレキャスト部材を用いた構造物を施工する方法及びプレキャスト部材を製作する方法
SAITO KIMIO (Autor:in) / SHIRAHAMA HIROSHI (Autor:in) / SASAKI YUSUKE (Autor:in) / ARAI TAKAHIRO (Autor:in) / SEKIGUCHI GOKEN (Autor:in)
20.05.2021
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2018
|PRECAST MEMBER MANUFACTURING METHOD AND PRECAST MEMBER
Europäisches Patentamt | 2018
|METHOD OF MANUFACTURING PRECAST MEMBER, AND PRECAST MEMBER
Europäisches Patentamt | 2016
|PRECAST CONCRETE MEMBER AND SKELETON CONSTRUCTION METHOD USING PRECAST CONCRETE MEMBER
Europäisches Patentamt | 2023
|HALF PRECAST MEMBER, AND MANUFACTURING METHOD OF HALF PRECAST MEMBER
Europäisches Patentamt | 2023
|