REINFORCEMENT STRUCTURE FOR UNDERGROUND CONTINUOUS WALL
To provide a reinforcement structure for an underground continuous wall that can streamline the arrangement work of an element, suppress cracks that occur in a RC wall plate portion that is continuous with a joint portion, and improve the shear strength of the joint portion.SOLUTION: A preceding element 2 (first element) has a first unevenness forming portion 28 and a first wall plate portion 29 located on a side away from a second element from the first unevenness forming portion 28. A trailing element 3 (second element) has a second unevenness forming portion 38 and a second wall plate portion 39 located on a side away from the preceding element 2 from the second unevenness forming portion 38. The first wall plate portion 29 is provided with a first bundled reinforcing bar 221 in which a plurality of reinforcing bars extending in the wall height direction are bundled on the side of the first unevenness forming portion 28. The second wall plate portion 39 is provided with a second bundled reinforcing bar 321 in which a plurality of reinforcing bars extending in the wall height direction are bundled on the side of the second unevenness forming portion 38.SELECTED DRAWING: Figure 2
【課題】エレメントの配筋作業を効率化でき、継手部と連続するRC造の壁板部に生じるひび割れを抑止し、継手部のせん断耐力を向上させることができる地中連続壁の補強構造を提供する。【解決手段】先行エレメント2(第1エレメント)は、第1凹凸形成部28と、第1凹凸形成部28よりも第2エレメントと離れる側に位置する第1壁板部29と、を有し、後行エレメント3(第2エレメント)は、第2凹凸形成部38と、第2凹凸形成部38よりも先行エレメント2と離れる側に位置する第2壁板部39と、を有し、第1壁板部29には、第1凹凸形成部28側に壁高さ方向に延びる複数の鉄筋が束ねられた第1束ね鉄筋221が設けられ、第2壁板部39には、第2凹凸形成部38側に壁高さ方向に延びる複数の鉄筋が束ねられた第2束ね鉄筋321が設けられている。【選択図】図2
REINFORCEMENT STRUCTURE FOR UNDERGROUND CONTINUOUS WALL
To provide a reinforcement structure for an underground continuous wall that can streamline the arrangement work of an element, suppress cracks that occur in a RC wall plate portion that is continuous with a joint portion, and improve the shear strength of the joint portion.SOLUTION: A preceding element 2 (first element) has a first unevenness forming portion 28 and a first wall plate portion 29 located on a side away from a second element from the first unevenness forming portion 28. A trailing element 3 (second element) has a second unevenness forming portion 38 and a second wall plate portion 39 located on a side away from the preceding element 2 from the second unevenness forming portion 38. The first wall plate portion 29 is provided with a first bundled reinforcing bar 221 in which a plurality of reinforcing bars extending in the wall height direction are bundled on the side of the first unevenness forming portion 28. The second wall plate portion 39 is provided with a second bundled reinforcing bar 321 in which a plurality of reinforcing bars extending in the wall height direction are bundled on the side of the second unevenness forming portion 38.SELECTED DRAWING: Figure 2
【課題】エレメントの配筋作業を効率化でき、継手部と連続するRC造の壁板部に生じるひび割れを抑止し、継手部のせん断耐力を向上させることができる地中連続壁の補強構造を提供する。【解決手段】先行エレメント2(第1エレメント)は、第1凹凸形成部28と、第1凹凸形成部28よりも第2エレメントと離れる側に位置する第1壁板部29と、を有し、後行エレメント3(第2エレメント)は、第2凹凸形成部38と、第2凹凸形成部38よりも先行エレメント2と離れる側に位置する第2壁板部39と、を有し、第1壁板部29には、第1凹凸形成部28側に壁高さ方向に延びる複数の鉄筋が束ねられた第1束ね鉄筋221が設けられ、第2壁板部39には、第2凹凸形成部38側に壁高さ方向に延びる複数の鉄筋が束ねられた第2束ね鉄筋321が設けられている。【選択図】図2
REINFORCEMENT STRUCTURE FOR UNDERGROUND CONTINUOUS WALL
地中連続壁の補強構造
KANEMOTO KIYOOMI (Autor:in)
03.06.2021
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Reinforcement cage structure for underground continuous wall