Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
To provide a technique capable of appropriately controlling warm-up completion timing of a work machine in view of the usage schedule of the work machine.SOLUTION: On the basis of a measured value of an external state variable when the operation of a work machine 40 is stopped, a warm-up period from the start of the warm-up operation of the work machine 40 until a measured value of an internal state variables satisfies a specified condition, that is, the warm-up is completed. Then, on the basis of the predicted warm-up period, the warm-up operation of the work machine 40 can be started at a first designated time t1 which is an appropriate timing, such that the measured value of the internal state variable of the work machine 40 satisfies the specified condition by a second designated time t2.SELECTED DRAWING: Figure 6
【課題】作業機械の利用予定に鑑みて、当該作業機械の暖機完了タイミングを適当に制御することができる技術を提供する。【解決手段】作業機械40の運転が停止されている状態における外部状態変数の計測値に基づき、当該作業機械40の暖機運転が開始されてから内部状態変数の計測値が指定条件を満たす、すなわち、暖機が完了するまでの暖機期間が予測される。そして、第2指定時刻t2までに作業機械40の内部状態変数の計測値が指定条件を満たすように、当該予測された暖機期間に基づき、適当なタイミングである第1指定時刻t1に作業機械40の暖機運転が開始されうる。【選択図】図6
OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
To provide a technique capable of appropriately controlling warm-up completion timing of a work machine in view of the usage schedule of the work machine.SOLUTION: On the basis of a measured value of an external state variable when the operation of a work machine 40 is stopped, a warm-up period from the start of the warm-up operation of the work machine 40 until a measured value of an internal state variables satisfies a specified condition, that is, the warm-up is completed. Then, on the basis of the predicted warm-up period, the warm-up operation of the work machine 40 can be started at a first designated time t1 which is an appropriate timing, such that the measured value of the internal state variable of the work machine 40 satisfies the specified condition by a second designated time t2.SELECTED DRAWING: Figure 6
【課題】作業機械の利用予定に鑑みて、当該作業機械の暖機完了タイミングを適当に制御することができる技術を提供する。【解決手段】作業機械40の運転が停止されている状態における外部状態変数の計測値に基づき、当該作業機械40の暖機運転が開始されてから内部状態変数の計測値が指定条件を満たす、すなわち、暖機が完了するまでの暖機期間が予測される。そして、第2指定時刻t2までに作業機械40の内部状態変数の計測値が指定条件を満たすように、当該予測された暖機期間に基づき、適当なタイミングである第1指定時刻t1に作業機械40の暖機運転が開始されうる。【選択図】図6
OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
操作支援サーバ、操作支援システムおよび操作支援方法
OTANI MASAKI (Autor:in) / SAEKI SEIJI (Autor:in) / YAMAZAKI YOICHIRO (Autor:in)
09.09.2021
Patent
Elektronische Ressource
Japanisch
OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
Europäisches Patentamt | 2023
|OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
Europäisches Patentamt | 2023
|OPERATION SUPPORT SERVER, OPERATION SUPPORT SYSTEM, AND OPERATION SUPPORT METHOD
Europäisches Patentamt | 2021
|Operation support server, operation support system, and operation support method
Europäisches Patentamt | 2025
|Operation support server, operation support system, and operation support method
Europäisches Patentamt | 2022
|