SCOURING PREVENTION STRUCTURE AND SCOURING PREVENTION METHOD
To provide a scouring prevention structure capable of efficiently installing crushed stone units, and a scouring prevention method.SOLUTION: A filter layer 5 is formed on the ground 3 around a monopile 1. Subsequently, multiple crushed stone units 7 are placed in contact with peripheral surface of the monopile 1 in a ring shape. Then, multiple crushed stone units 9 with a horizontal projected area greater than crushed stone units 7 are placed on the outer circumference of crushed stone units 7 arranging them without gaps so that they have a substantially hexagonal shape in a plan view. Since the dimensions of the crushed stone units 7 and that of the crushed stone units 9 are different, gaps are generated among the crushed stone units 7 and the crushed stone units 9. After that, crushed stone units 11 with a horizontal projected area greater than that of the crushed stone units 7 are placed to close the gaps among the crushed stone units 7 and the crushed stone units 9.SELECTED DRAWING: Figure 2
【課題】砕石ユニットを効率的に設置することができる洗掘防止構造および洗掘防止方法を提供する。【解決手段】モノパイル1の周囲の地盤3上にフィルター層5を形成する。そして、複数の砕石ユニット7をモノパイル1の外周面に接するように環状に並べて配置する。次に、水平投影面積が砕石ユニット7より大きい複数の砕石ユニット9を砕石ユニット7の外周に平面視で略六角形状となるように隙間なく並べて配置する。砕石ユニット7と砕石ユニット9とは寸法が異なるため、砕石ユニット7と砕石ユニット9との間には隙間が生じる。その後、水平投影面積が砕石ユニット7より大きい砕石ユニット11を砕石ユニット7と砕石ユニット9との隙間を塞ぐように配置する。【選択図】図2
SCOURING PREVENTION STRUCTURE AND SCOURING PREVENTION METHOD
To provide a scouring prevention structure capable of efficiently installing crushed stone units, and a scouring prevention method.SOLUTION: A filter layer 5 is formed on the ground 3 around a monopile 1. Subsequently, multiple crushed stone units 7 are placed in contact with peripheral surface of the monopile 1 in a ring shape. Then, multiple crushed stone units 9 with a horizontal projected area greater than crushed stone units 7 are placed on the outer circumference of crushed stone units 7 arranging them without gaps so that they have a substantially hexagonal shape in a plan view. Since the dimensions of the crushed stone units 7 and that of the crushed stone units 9 are different, gaps are generated among the crushed stone units 7 and the crushed stone units 9. After that, crushed stone units 11 with a horizontal projected area greater than that of the crushed stone units 7 are placed to close the gaps among the crushed stone units 7 and the crushed stone units 9.SELECTED DRAWING: Figure 2
【課題】砕石ユニットを効率的に設置することができる洗掘防止構造および洗掘防止方法を提供する。【解決手段】モノパイル1の周囲の地盤3上にフィルター層5を形成する。そして、複数の砕石ユニット7をモノパイル1の外周面に接するように環状に並べて配置する。次に、水平投影面積が砕石ユニット7より大きい複数の砕石ユニット9を砕石ユニット7の外周に平面視で略六角形状となるように隙間なく並べて配置する。砕石ユニット7と砕石ユニット9とは寸法が異なるため、砕石ユニット7と砕石ユニット9との間には隙間が生じる。その後、水平投影面積が砕石ユニット7より大きい砕石ユニット11を砕石ユニット7と砕石ユニット9との隙間を塞ぐように配置する。【選択図】図2
SCOURING PREVENTION STRUCTURE AND SCOURING PREVENTION METHOD
洗掘防止構造および洗掘防止方法
INAGAKI SATOSHI (Autor:in) / NIIHARA YUJI (Autor:in) / FUJITA HIDEHIRO (Autor:in) / UMEZU ISSEI (Autor:in)
27.01.2022
Patent
Elektronische Ressource
Japanisch
SCOURING PREVENTION UNIT AND SCOURING PREVENTION STRUCTURE
Europäisches Patentamt | 2022
|SCOURING PREVENTION BODY AND SCOURING PREVENTION METHOD
Europäisches Patentamt | 2023
|SCOURING PREVENTION STRUCTURE, AND CONSTRUCTION METHOD OF SCOURING PREVENTION STRUCTURE
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|SCOURING PREVENTION MEMBER, INSTALLATION METHOD THEREOF, SCOURING PREVENTION METHOD
Europäisches Patentamt | 2024
|