Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION METHOD OF GROUND IMPROVEMENT BODY
To provide a construction method of a ground improvement body allowing decrease of discharge pressure to be prevented or suppressed when constructing a ground improvement body directly under the bottom of an existing building.SOLUTION: A construction method of a ground body 100 is provided with: a prior process for constructing an upper improvement body 110 from a specific depth T1 to a bottom part 34 by injecting in a horizontal direction solidification material K1 including a solidification component while a rod 20 inserted in the ground G from a bottom part 34 of an underground body 32 of an existing building 30 is moved and rotated in a vertical direction; and a post process for constructing a lower improvement body 120 from a designed improvement depth T2 to the upper improvement body 110 by injecting in the horizontal direction solidification material K2 while moving and rotating the rod 20 in the vertical direction after specific hours from the prior process elapse.SELECTED DRAWING: Figure 1
【課題】既存建物の底部の直下に地盤改良体を造成する際の排泥の排出圧力の低下を抑制又は防止する。【解決手段】地盤改良体100の造成工法は、既存建物30の地下躯体32の底部34から地盤Gに貫入したロッド20を上下方向に移動させ且つ回転させながら固化成分を含む固化材K1を横方向に噴射し所定深度T1から底部34まで上部改良体110を造成する先工程と、先工程から所定時間後にロッド20を上下方向に移動させ且つ回転させながら固化材K2を横方向に噴射し設計改良深度T2から上部改良体110まで下部改良体120を造成する後工程と、を備えている。【選択図】図1
CONSTRUCTION METHOD OF GROUND IMPROVEMENT BODY
To provide a construction method of a ground improvement body allowing decrease of discharge pressure to be prevented or suppressed when constructing a ground improvement body directly under the bottom of an existing building.SOLUTION: A construction method of a ground body 100 is provided with: a prior process for constructing an upper improvement body 110 from a specific depth T1 to a bottom part 34 by injecting in a horizontal direction solidification material K1 including a solidification component while a rod 20 inserted in the ground G from a bottom part 34 of an underground body 32 of an existing building 30 is moved and rotated in a vertical direction; and a post process for constructing a lower improvement body 120 from a designed improvement depth T2 to the upper improvement body 110 by injecting in the horizontal direction solidification material K2 while moving and rotating the rod 20 in the vertical direction after specific hours from the prior process elapse.SELECTED DRAWING: Figure 1
【課題】既存建物の底部の直下に地盤改良体を造成する際の排泥の排出圧力の低下を抑制又は防止する。【解決手段】地盤改良体100の造成工法は、既存建物30の地下躯体32の底部34から地盤Gに貫入したロッド20を上下方向に移動させ且つ回転させながら固化成分を含む固化材K1を横方向に噴射し所定深度T1から底部34まで上部改良体110を造成する先工程と、先工程から所定時間後にロッド20を上下方向に移動させ且つ回転させながら固化材K2を横方向に噴射し設計改良深度T2から上部改良体110まで下部改良体120を造成する後工程と、を備えている。【選択図】図1
CONSTRUCTION METHOD OF GROUND IMPROVEMENT BODY
地盤改良体の造成工法
YAMANAKA RYU (Autor:in) / TAYA YUJI (Autor:in) / YAMADA YOSHIHIRO (Autor:in) / YAMAMOTO KEISUKE (Autor:in) / MATSUDA SHIGERU (Autor:in) / HATA SHINJI (Autor:in) / NOGATA KOJI (Autor:in) / NAGANO KOICHI (Autor:in) / NAGAI TAKASHI (Autor:in) / TACHIBANA KAORU (Autor:in)
02.02.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2021
|GROUND IMPROVEMENT BODY CREATING DEVICE, GROUND IMPROVEMENT CONSTRUCTION METHOD
Europäisches Patentamt | 2023
|WEAK GROUND IMPROVEMENT BODY, AND CONSTRUCTION METHOD OF WEAK GROUND IMPROVEMENT BODY
Europäisches Patentamt | 2022
|GROUND IMPROVEMENT BODY AND CONSTRUCTION METHOD THEREFOR
Europäisches Patentamt | 2020
|