To provide a pile base structure mainly allowing high support effect against static force to be achieved in a short construction period.SOLUTION: The present invention relates to a pile base structure where an upper structure 1 is constructed on a pile 4 installed in the ground surface 2. The pile 4 comprises an aboveground projecting part 11 projected upward from the ground surface 2 at its upper end side. The aboveground projecting part 11 comprises a support part 12 supporting the upper structure 1 on an upper side part or its side part. The supporting part 12 is directly connected near an intersection point 15 of a base 13 of the upper structure 1 and a vertical load support point 14. A brace member 31 may be connected between the aboveground projecting parts 11 of adjacent piles 4. A connection part 41 between the support part 12 and the upper structure 1 may be provided two or more for each of the vertical load support points 14.SELECTED DRAWING: Figure 2
【課題】主に、工期を短くすると共に、静的な外力に対して高い支持効果が得られるようにする。【解決手段】地面2に打設した杭4に対して上部構造体1を設置した杭基礎構造に関する。杭4は、上端側に地面2から上方へ突出する地上突出部11を有する。地上突出部11は、上端部または側部に上部構造体1を支持する支持部12を有する。支持部12は、上部構造体1の土台13と鉛直荷重支持点14との交点15付近に直接接合されている。隣接する杭4の地上突出部11間が、引張力および圧縮力を調整可能なブレース材31で連結されても良い。支持部12と上部構造体1との間の接合部41は、1本の鉛直荷重支持点14につき、二箇所以上設けられていても良い。【選択図】図2
To provide a pile base structure mainly allowing high support effect against static force to be achieved in a short construction period.SOLUTION: The present invention relates to a pile base structure where an upper structure 1 is constructed on a pile 4 installed in the ground surface 2. The pile 4 comprises an aboveground projecting part 11 projected upward from the ground surface 2 at its upper end side. The aboveground projecting part 11 comprises a support part 12 supporting the upper structure 1 on an upper side part or its side part. The supporting part 12 is directly connected near an intersection point 15 of a base 13 of the upper structure 1 and a vertical load support point 14. A brace member 31 may be connected between the aboveground projecting parts 11 of adjacent piles 4. A connection part 41 between the support part 12 and the upper structure 1 may be provided two or more for each of the vertical load support points 14.SELECTED DRAWING: Figure 2
【課題】主に、工期を短くすると共に、静的な外力に対して高い支持効果が得られるようにする。【解決手段】地面2に打設した杭4に対して上部構造体1を設置した杭基礎構造に関する。杭4は、上端側に地面2から上方へ突出する地上突出部11を有する。地上突出部11は、上端部または側部に上部構造体1を支持する支持部12を有する。支持部12は、上部構造体1の土台13と鉛直荷重支持点14との交点15付近に直接接合されている。隣接する杭4の地上突出部11間が、引張力および圧縮力を調整可能なブレース材31で連結されても良い。支持部12と上部構造体1との間の接合部41は、1本の鉛直荷重支持点14につき、二箇所以上設けられていても良い。【選択図】図2
PILE BASE STRUCTURE
杭基礎構造
OKASHITA KAZUHIKO (Autor:in)
11.04.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Uplift pile, pile structure, pile body, base, fixed connection assembly and construction method