Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
FOUNDATION PENETRATION STRUCTURE OF PIPING AND CONSTRUCTION METHOD OF FOUNDATION PENETRATION PIPING
To improve workability mainly to a retainer on an indoor side of a water stop material.SOLUTION: A water stop material 13 is installed in a circumferential direction in a clearance 12 between a penetration hole portion 11 formed on a foundation 4 and piping 2 inserted and disposed in the penetration hole portion 11. At a position closer to an indoor side 15 than the water stop material 13 in the clearance 12, a foamed material 16 is installed. At a position closer to an outdoor side 17 than the water stop material 13 in the clearance 12, mortar 18 is placed. The foamed material 16 may be installed in the penetration hole portion 11 together with the piping 2 while being attached on an outer peripheral surface of the piping 2. The foamed material 16 may be pasted to the outer peripheral surface of the piping 2 by an adhesive tape 25.SELECTED DRAWING: Figure 1
【課題】主に、止水材の屋内側の押さえに対する作業性を向上し得るようにする。【解決手段】基礎4に形成された貫通穴部11と、貫通穴部11に挿通配置された配管2との間の隙間12に止水材13が周方向に設置され、隙間12内の止水材13よりも屋内側15の位置には、発泡材16が設置され、隙間12内の止水材13よりも屋外側17の位置には、モルタル18が打設される。発泡材16は、配管2の外周面に取付けられた状態で、配管2と共に貫通穴部11に設置されても良い。発泡材16は、粘着テープ25で配管2の外周面に貼付けられても良い。【選択図】図1
FOUNDATION PENETRATION STRUCTURE OF PIPING AND CONSTRUCTION METHOD OF FOUNDATION PENETRATION PIPING
To improve workability mainly to a retainer on an indoor side of a water stop material.SOLUTION: A water stop material 13 is installed in a circumferential direction in a clearance 12 between a penetration hole portion 11 formed on a foundation 4 and piping 2 inserted and disposed in the penetration hole portion 11. At a position closer to an indoor side 15 than the water stop material 13 in the clearance 12, a foamed material 16 is installed. At a position closer to an outdoor side 17 than the water stop material 13 in the clearance 12, mortar 18 is placed. The foamed material 16 may be installed in the penetration hole portion 11 together with the piping 2 while being attached on an outer peripheral surface of the piping 2. The foamed material 16 may be pasted to the outer peripheral surface of the piping 2 by an adhesive tape 25.SELECTED DRAWING: Figure 1
【課題】主に、止水材の屋内側の押さえに対する作業性を向上し得るようにする。【解決手段】基礎4に形成された貫通穴部11と、貫通穴部11に挿通配置された配管2との間の隙間12に止水材13が周方向に設置され、隙間12内の止水材13よりも屋内側15の位置には、発泡材16が設置され、隙間12内の止水材13よりも屋外側17の位置には、モルタル18が打設される。発泡材16は、配管2の外周面に取付けられた状態で、配管2と共に貫通穴部11に設置されても良い。発泡材16は、粘着テープ25で配管2の外周面に貼付けられても良い。【選択図】図1
FOUNDATION PENETRATION STRUCTURE OF PIPING AND CONSTRUCTION METHOD OF FOUNDATION PENETRATION PIPING
配管の基礎貫通構造および基礎貫通配管の施工方法
YAMAMOTO NAOKI (Autor:in)
26.05.2022
Patent
Elektronische Ressource
Japanisch
PIPING STRUCTURE AND PIPING METHOD OF FOUNDATION PART
Europäisches Patentamt | 2015
|BUCKET FOUNDATION PENETRATION DEVICE AND BUCKET FOUNDATION PENETRATION METHOD
Europäisches Patentamt | 2024
|ARRANGEMENT STRUCTURE FOR PIPING PENETRATION PART, AND BUILDING
Europäisches Patentamt | 2016
|