WORK BARGE FOR BOUNDARY PORTION BETWEEN WATER AND LAND, AND INSTALLATION METHOD
To provide a work barge for a boundary portion between water and land and an installation method which simply and efficiently constructs a work floor so as to straddle the land area and the water area.SOLUTION: A land barge 10 is assembled on a land portion 3 of a boundary portion 2 between water and land. A water barge 20 is assembled on a water portion 4. On the water barge 20, a first leg 40 and a first ascending/descending device 41 for making the first leg 40 ascend/descend. The water barge 20 is moved to the front of the land barge 10 with the boundary portion 2 between water and land interposed between them. The water barge 20 is made to ascend to a height of the land barge 10 by using the first leg 40 and the first ascending/descending device 41. The land barge 10 is moved toward the water barge 20. The land barge 10 and the water barge 20 are connected.SELECTED DRAWING: Figure 1
【課題】作業床を陸域と水域とに跨って簡便かつ効率的に構築する水陸境界部用作業台船および設置方法を提供する。【解決手段】水陸境界部2の陸上部分3において陸上用台船10を組み立てる。水上部分4において水上用台船20を組み立てる。水上用台船20に、第1レグ40と、第1レグ40を昇降させる第1昇降装置41とを組み立てる。水上用台船20を水陸境界部2を挟んで陸上用台船10の正面に移動させる。第1レグ40と第1昇降装置41とを用いて水上用台船20を陸上用台船10の高さに上昇させる。陸上用台船10を水上用台船20に向けて移動させる。陸上用台船10と水上用台船20とを連結する。【選択図】図1
WORK BARGE FOR BOUNDARY PORTION BETWEEN WATER AND LAND, AND INSTALLATION METHOD
To provide a work barge for a boundary portion between water and land and an installation method which simply and efficiently constructs a work floor so as to straddle the land area and the water area.SOLUTION: A land barge 10 is assembled on a land portion 3 of a boundary portion 2 between water and land. A water barge 20 is assembled on a water portion 4. On the water barge 20, a first leg 40 and a first ascending/descending device 41 for making the first leg 40 ascend/descend. The water barge 20 is moved to the front of the land barge 10 with the boundary portion 2 between water and land interposed between them. The water barge 20 is made to ascend to a height of the land barge 10 by using the first leg 40 and the first ascending/descending device 41. The land barge 10 is moved toward the water barge 20. The land barge 10 and the water barge 20 are connected.SELECTED DRAWING: Figure 1
【課題】作業床を陸域と水域とに跨って簡便かつ効率的に構築する水陸境界部用作業台船および設置方法を提供する。【解決手段】水陸境界部2の陸上部分3において陸上用台船10を組み立てる。水上部分4において水上用台船20を組み立てる。水上用台船20に、第1レグ40と、第1レグ40を昇降させる第1昇降装置41とを組み立てる。水上用台船20を水陸境界部2を挟んで陸上用台船10の正面に移動させる。第1レグ40と第1昇降装置41とを用いて水上用台船20を陸上用台船10の高さに上昇させる。陸上用台船10を水上用台船20に向けて移動させる。陸上用台船10と水上用台船20とを連結する。【選択図】図1
WORK BARGE FOR BOUNDARY PORTION BETWEEN WATER AND LAND, AND INSTALLATION METHOD
水陸境界部用作業台船および設置方法
ARIIZUMI SHINJI (Autor:in)
08.06.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Electricity on Barge canal work
Engineering Index Backfile | 1911
BARGE AND MARINE STRUCTURE INSTALLATION VESSEL INCLUDING THE SAME
Europäisches Patentamt | 2017
BARGE AND MARINE STRUCTURE INSTALLATION VESSEL INCLUDING THE SAME
Europäisches Patentamt | 2017
|