BUILDING MATERIAL ERECTION METHOD AND APPARATUS
To efficiently unload and erect a building material by one lifting device to be used.SOLUTION: A transport vehicle 95 loaded with a building material 90 on a deck 96 enters between a pair of leg parts 30 and 30. Subsequently, a tip 52 of a first wire 51 suspended from loading means 50 is connected to one end 91 in a longitudinal direction of the building material 90, and a tip 82 of a second wire 81 suspended from a lifting device 80 is connected to the other end 92 in the longitudinal direction of the building material 90. Subsequently, the building material 90 and the deck 96 are separated from one another. Subsequently, the transport vehicle 95 evacuates from the pair of leg parts 30 and 30. The building material 90 is erected by raising the tip 82 of the second wire 81 by the lifting device 80.SELECTED DRAWING: Figure 1
【課題】揚重装置の使用は1台にして建材の荷下ろしおよび建て起こしを効率的に行う。【解決手段】建材90を荷台96に積載した運搬車両95が一対の脚部30,30の間に進入する。続いて、荷役手段50から垂下した第1のワイヤ51の先端52を建材90の長手方向の一端91に、揚重装置80から垂下した第2のワイヤ81の先端82を建材90の長手方向の他端92にそれぞれ連結する。続いて、建材90と荷台96とを離間させる。続いて、運搬車両95が一対の脚部30,30の間から退避する。そして、揚重装置80によって第2のワイヤ81の先端82を上昇させることで、建材90を建て起こす。【選択図】図1
BUILDING MATERIAL ERECTION METHOD AND APPARATUS
To efficiently unload and erect a building material by one lifting device to be used.SOLUTION: A transport vehicle 95 loaded with a building material 90 on a deck 96 enters between a pair of leg parts 30 and 30. Subsequently, a tip 52 of a first wire 51 suspended from loading means 50 is connected to one end 91 in a longitudinal direction of the building material 90, and a tip 82 of a second wire 81 suspended from a lifting device 80 is connected to the other end 92 in the longitudinal direction of the building material 90. Subsequently, the building material 90 and the deck 96 are separated from one another. Subsequently, the transport vehicle 95 evacuates from the pair of leg parts 30 and 30. The building material 90 is erected by raising the tip 82 of the second wire 81 by the lifting device 80.SELECTED DRAWING: Figure 1
【課題】揚重装置の使用は1台にして建材の荷下ろしおよび建て起こしを効率的に行う。【解決手段】建材90を荷台96に積載した運搬車両95が一対の脚部30,30の間に進入する。続いて、荷役手段50から垂下した第1のワイヤ51の先端52を建材90の長手方向の一端91に、揚重装置80から垂下した第2のワイヤ81の先端82を建材90の長手方向の他端92にそれぞれ連結する。続いて、建材90と荷台96とを離間させる。続いて、運搬車両95が一対の脚部30,30の間から退避する。そして、揚重装置80によって第2のワイヤ81の先端82を上昇させることで、建材90を建て起こす。【選択図】図1
BUILDING MATERIAL ERECTION METHOD AND APPARATUS
建材の建て起こし方法および装置
OTANI HIDEO (Autor:in) / OTAKE AKIO (Autor:in)
05.10.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste