PC TANK CONSTRUCTION METHOD AND PC TANK DURING CONSTRUCTION
To provide a PC tank construction method that eliminates the need for high-precision alignment of a lower PC steel bar and an upper PC steel bar when placing the vertical PC steel bar in a construction opening and blocking it with concrete to introduce prestress to the PC steel bar, and a PC tank during construction.SOLUTION: A PC tank construction method includes a step A in which a lower PC steel bar 41 is arranged below a construction opening 50 in a part of a side wall 20, the lower end of the lower PC steel bar 41 is fixed, and the upper end protrudes upward from a lower edge 52 of the construction opening 50, and then a sheath pipe 30 is arranged above the construction opening 50, and the side wall 20 other than the construction opening 50 is constructed, a step B in which an upper PC steel bar 43 is inserted from an upper end 31 of the sheath pipe 30 and it is directly or indirectly connected to the lower PC steel bar 41, and a step C in which the construction opening 50 is blocked by placing concrete and a grout 60 is injected into the sheath pipe 30 and the upper end of the upper PC steel bar 43 is tightened to introduce prestress.SELECTED DRAWING: Figure 3
【課題】工事用開口に鉛直方向のPC鋼棒を配設してコンクリートにて閉塞し、PC鋼棒にプレストレスを導入するに当たり、下部PC鋼棒と上部PC鋼棒の高精度な位置合わせを不要にする、PCタンクの施工方法と施工時のPCタンクを提供する。【解決手段】PCタンクの施工方法は、側壁20の一部にある工事用開口50の下方に下部PC鋼棒41を配設し、下部PC鋼棒41の下端を定着し、上端を工事用開口50の下縁52から上方に突設させ、工事用開口50の上方においてシース管30を配設し、工事用開口50以外の側壁20を施工するA工程と、シース管30の上端31から上部PC鋼棒43を挿入して下部PC鋼棒41と直接的もしくは間接的に接続するB工程と、工事用開口50をコンクリートを打設することにより閉塞し、シース管30にグラウト60を注入するとともに上部PC鋼棒43の上端を緊張してプレストレスを導入するC工程とを有する。【選択図】図3
PC TANK CONSTRUCTION METHOD AND PC TANK DURING CONSTRUCTION
To provide a PC tank construction method that eliminates the need for high-precision alignment of a lower PC steel bar and an upper PC steel bar when placing the vertical PC steel bar in a construction opening and blocking it with concrete to introduce prestress to the PC steel bar, and a PC tank during construction.SOLUTION: A PC tank construction method includes a step A in which a lower PC steel bar 41 is arranged below a construction opening 50 in a part of a side wall 20, the lower end of the lower PC steel bar 41 is fixed, and the upper end protrudes upward from a lower edge 52 of the construction opening 50, and then a sheath pipe 30 is arranged above the construction opening 50, and the side wall 20 other than the construction opening 50 is constructed, a step B in which an upper PC steel bar 43 is inserted from an upper end 31 of the sheath pipe 30 and it is directly or indirectly connected to the lower PC steel bar 41, and a step C in which the construction opening 50 is blocked by placing concrete and a grout 60 is injected into the sheath pipe 30 and the upper end of the upper PC steel bar 43 is tightened to introduce prestress.SELECTED DRAWING: Figure 3
【課題】工事用開口に鉛直方向のPC鋼棒を配設してコンクリートにて閉塞し、PC鋼棒にプレストレスを導入するに当たり、下部PC鋼棒と上部PC鋼棒の高精度な位置合わせを不要にする、PCタンクの施工方法と施工時のPCタンクを提供する。【解決手段】PCタンクの施工方法は、側壁20の一部にある工事用開口50の下方に下部PC鋼棒41を配設し、下部PC鋼棒41の下端を定着し、上端を工事用開口50の下縁52から上方に突設させ、工事用開口50の上方においてシース管30を配設し、工事用開口50以外の側壁20を施工するA工程と、シース管30の上端31から上部PC鋼棒43を挿入して下部PC鋼棒41と直接的もしくは間接的に接続するB工程と、工事用開口50をコンクリートを打設することにより閉塞し、シース管30にグラウト60を注入するとともに上部PC鋼棒43の上端を緊張してプレストレスを導入するC工程とを有する。【選択図】図3
PC TANK CONSTRUCTION METHOD AND PC TANK DURING CONSTRUCTION
PCタンクの施工方法と施工時のPCタンク
HONTANI YUKIYASU (Autor:in) / NISHIMIYA AKIRA (Autor:in) / NIIDA MASATO (Autor:in) / KOJIMA KEITA (Autor:in)
06.10.2022
Patent
Elektronische Ressource
Japanisch