UNDERWATER PILE INSTALLATION MANAGEMENT METHOD
To perform pile installation while preventing contact between guide steel pipes provided in a template for positioning with a steel pipe pile, and thereby eliminate positional deviation of the template for positioning and easily remove the template for positioning after completion of pile installation.SOLUTION: An underwater pile installation management method includes: a first step of submerging a template 1 for positioning that is composed of a steel material assembled in a lattice shape in plan view, where guide steel pipes 13 having circular cross sections are provided at pile installation positions, to a water bottom; a second step of positioning a pile installation device 5 to a predetermined pile installation place, and setting a steel pipe pile 8; a third step of electrically connecting the steel pipe pile 8 and the guide steel pipes 13 of the template 1 for positioning through a power source 26 and contact alarm means 27; and a fourth step of installing the steel pipe pile 8 so as not to contact the guide steel pipes 13 while monitoring alarm by the contact alarm means 27.SELECTED DRAWING: Figure 6
【課題】位置決め用テンプレートに設けたガイド鋼管と鋼管杭とが接触するのを防止しながら杭打設を行うようにすることで、位置決め用テンプレートの位置ずれを無くすとともに、杭打設完了後に容易に撤去可能とする。【解決手段】平面視で井桁状に組み立てられた鋼材によって構成されるとともに、杭打設位置に断面円形のガイド鋼管13が夫々設けられた位置決め用テンプレート1を水底に沈設する第1手順と、前記杭打ち装置5を所定の杭打ち箇所に位置決めするとともに、鋼管杭8をセットする第2手順と、前記鋼管杭8と前記位置決め用テンプレート1のガイド鋼管13とを電源26及び接触警告手段27を中間に介して電気的に接続する第3手順と、前記接触警告手段27による警告を監視しながら、前記鋼管杭8を前記ガイド鋼管13に接触しないように打設を行う第4手順とからなる。【選択図】図6
UNDERWATER PILE INSTALLATION MANAGEMENT METHOD
To perform pile installation while preventing contact between guide steel pipes provided in a template for positioning with a steel pipe pile, and thereby eliminate positional deviation of the template for positioning and easily remove the template for positioning after completion of pile installation.SOLUTION: An underwater pile installation management method includes: a first step of submerging a template 1 for positioning that is composed of a steel material assembled in a lattice shape in plan view, where guide steel pipes 13 having circular cross sections are provided at pile installation positions, to a water bottom; a second step of positioning a pile installation device 5 to a predetermined pile installation place, and setting a steel pipe pile 8; a third step of electrically connecting the steel pipe pile 8 and the guide steel pipes 13 of the template 1 for positioning through a power source 26 and contact alarm means 27; and a fourth step of installing the steel pipe pile 8 so as not to contact the guide steel pipes 13 while monitoring alarm by the contact alarm means 27.SELECTED DRAWING: Figure 6
【課題】位置決め用テンプレートに設けたガイド鋼管と鋼管杭とが接触するのを防止しながら杭打設を行うようにすることで、位置決め用テンプレートの位置ずれを無くすとともに、杭打設完了後に容易に撤去可能とする。【解決手段】平面視で井桁状に組み立てられた鋼材によって構成されるとともに、杭打設位置に断面円形のガイド鋼管13が夫々設けられた位置決め用テンプレート1を水底に沈設する第1手順と、前記杭打ち装置5を所定の杭打ち箇所に位置決めするとともに、鋼管杭8をセットする第2手順と、前記鋼管杭8と前記位置決め用テンプレート1のガイド鋼管13とを電源26及び接触警告手段27を中間に介して電気的に接続する第3手順と、前記接触警告手段27による警告を監視しながら、前記鋼管杭8を前記ガイド鋼管13に接触しないように打設を行う第4手順とからなる。【選択図】図6
UNDERWATER PILE INSTALLATION MANAGEMENT METHOD
水中杭の打設管理方法
SHIGEMATSU AKITERU (Autor:in) / OHARA TAKAYUKI (Autor:in) / UKEKAWA MAKOTO (Autor:in)
19.10.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underwater installation method for large-size anchor pile
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|PILE INSTALLATION POSITION TEACHING DEVICE, AND PILE INSTALLATION METHOD
Europäisches Patentamt | 2020
|