CONNECTION METHOD AND CONNECTION STRUCTURE
To provide a connection method and a connection structure for precast members that can ensure the quality of filling materials to be cured.SOLUTION: A connection method according to one embodiment includes a step to install a first precast member 10 with an end surface 13 having a first bearing plate 60 mounted thereto, a step to install a second precast member 20 with an end surface 23 having a second bearing plate 70 mounted thereto, at a position where the second bearing plate 70 faces the first bearing plate 60, a step in which the first precast member 10 and the second precast member 20 are tensioned along an arrangement direction D2 via the first bearing plate 60 and the second bearing plate 70, a step to fill the space between the end surface 13 and the end surface 23 with a filling material 30, and a step to apply prestress to the cured filling material 30 along the arrangement direction after the filling material 30 has cured.SELECTED DRAWING: Figure 4
【課題】硬化する間詰材の品質を確保することができるプレキャスト部材の連結方法及び連結構造を提供する。【解決手段】一実施形態に係る連結方法は、端面13に第1支圧板60が取り付けられた第1プレキャスト部材10を設置する工程と、端面23に第2支圧板70が取り付けられた第2プレキャスト部材20を、第2支圧板70が第1支圧板60に対向する位置に設置する工程と、第1支圧板60及び第2支圧板70を介して並設方向D2に沿って第1プレキャスト部材10及び第2プレキャスト部材20を緊張する工程と、端面13と端面23との間に間詰材30を充填する工程と、間詰材30が硬化した後に、硬化した間詰材30に並設方向に沿ってプレストレスを付与する工程と、を備える。【選択図】図4
CONNECTION METHOD AND CONNECTION STRUCTURE
To provide a connection method and a connection structure for precast members that can ensure the quality of filling materials to be cured.SOLUTION: A connection method according to one embodiment includes a step to install a first precast member 10 with an end surface 13 having a first bearing plate 60 mounted thereto, a step to install a second precast member 20 with an end surface 23 having a second bearing plate 70 mounted thereto, at a position where the second bearing plate 70 faces the first bearing plate 60, a step in which the first precast member 10 and the second precast member 20 are tensioned along an arrangement direction D2 via the first bearing plate 60 and the second bearing plate 70, a step to fill the space between the end surface 13 and the end surface 23 with a filling material 30, and a step to apply prestress to the cured filling material 30 along the arrangement direction after the filling material 30 has cured.SELECTED DRAWING: Figure 4
【課題】硬化する間詰材の品質を確保することができるプレキャスト部材の連結方法及び連結構造を提供する。【解決手段】一実施形態に係る連結方法は、端面13に第1支圧板60が取り付けられた第1プレキャスト部材10を設置する工程と、端面23に第2支圧板70が取り付けられた第2プレキャスト部材20を、第2支圧板70が第1支圧板60に対向する位置に設置する工程と、第1支圧板60及び第2支圧板70を介して並設方向D2に沿って第1プレキャスト部材10及び第2プレキャスト部材20を緊張する工程と、端面13と端面23との間に間詰材30を充填する工程と、間詰材30が硬化した後に、硬化した間詰材30に並設方向に沿ってプレストレスを付与する工程と、を備える。【選択図】図4
CONNECTION METHOD AND CONNECTION STRUCTURE
連結方法及び連結構造
SATO TADAHIRO (Autor:in) / KOJIMOTO SHINICHIRO (Autor:in)
30.05.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
CONNECTION STRUCTURE, CONNECTION METHOD AND STRUCTURE