CONNECTION STRUCTURE AND CONNECTION METHOD
To provide a connection structure and the like for a batter pile and a precast superstructure capable of effectively resisting horizontal force while making a hole of the precast superstructure smaller.SOLUTION: A connection structure 10 is to connect a pipe-like batter pile 4 and a concrete precast superstructure 2. A hole 24 having a slope along the batter pile 4 is provided in the precast superstructure 2, and a temporary pile 12 is provided on an upper end part of the batter pile 4. The precast superstructure 2 is placed on the temporary pipe 12 and a connection pipe 13 having a slope along the batter pile 4 is inserted into the hole 24 of the precast superstructure 2 and inside of the upper end part of the batter pile 4, in which filler F is filled.SELECTED DRAWING: Figure 3
【課題】プレキャスト上部工の孔を細径化しつつ、水平力に対しても効果的に抵抗できる斜杭とプレキャスト上部工の接続構造等を提供する。【解決手段】接続構造10は、管状の斜杭4とコンクリート製のプレキャスト上部工2とを接続するものである。プレキャスト上部工2には、斜杭4に沿った傾斜を有する孔24が設けられ、斜杭4の上端部には仮受管12が設けられる。仮受管12の上にプレキャスト上部工2が載置され、プレキャスト上部工2の孔24および斜杭4の上端部の内側に、斜杭4に沿った傾斜を有する接続管13が挿入され、充填材Fが充填される。【選択図】図3
CONNECTION STRUCTURE AND CONNECTION METHOD
To provide a connection structure and the like for a batter pile and a precast superstructure capable of effectively resisting horizontal force while making a hole of the precast superstructure smaller.SOLUTION: A connection structure 10 is to connect a pipe-like batter pile 4 and a concrete precast superstructure 2. A hole 24 having a slope along the batter pile 4 is provided in the precast superstructure 2, and a temporary pile 12 is provided on an upper end part of the batter pile 4. The precast superstructure 2 is placed on the temporary pipe 12 and a connection pipe 13 having a slope along the batter pile 4 is inserted into the hole 24 of the precast superstructure 2 and inside of the upper end part of the batter pile 4, in which filler F is filled.SELECTED DRAWING: Figure 3
【課題】プレキャスト上部工の孔を細径化しつつ、水平力に対しても効果的に抵抗できる斜杭とプレキャスト上部工の接続構造等を提供する。【解決手段】接続構造10は、管状の斜杭4とコンクリート製のプレキャスト上部工2とを接続するものである。プレキャスト上部工2には、斜杭4に沿った傾斜を有する孔24が設けられ、斜杭4の上端部には仮受管12が設けられる。仮受管12の上にプレキャスト上部工2が載置され、プレキャスト上部工2の孔24および斜杭4の上端部の内側に、斜杭4に沿った傾斜を有する接続管13が挿入され、充填材Fが充填される。【選択図】図3
CONNECTION STRUCTURE AND CONNECTION METHOD
接続構造および接続方法
OURA SHIRO (Autor:in) / TANAKA HIDEO (Autor:in) / AKIYAMA SADAYUKI (Autor:in) / HIEI YUKIO (Autor:in) / OGURA TSUYOSHI (Autor:in) / YOSHIHARA TOMOYOSHI (Autor:in)
14.05.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONNECTION STRUCTURE, CONNECTION METHOD AND STRUCTURE