Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
QUALITY CONTROL METHOD OF BACKFILLED PART
To provide a quality control method of a backfilled part which can avoid instability of strength.SOLUTION: A method for managing construction quality of a backfilled part which is constructed by using cement milk containing a cement-based solidification material and water includes: a step of, while recovering mud water from a hole that is backfilled to the ground, injecting cement milk into this hole and replacing the inside of the hole with the cement milk; and a step of estimating a cement-based solidification material amount contained in a material in an un-consolidated state at the time of replacement or a mixing ratio of the cement-based solidification material with respect to water, and determining whether or not the estimated cement-based solidification material amount or the mixing ratio is within a predetermined range set based on design reference strength.SELECTED DRAWING: Figure 1
【課題】強度の不安定性を回避することができる埋戻し部の品質管理方法を提供する。【解決手段】セメント系固化材と水とを含有するセメントミルクを用いて施工される埋戻し部の施工品質を管理するための方法であって、埋戻される孔から泥土水を地上に回収する一方で、この孔にセメントミルクを注入して、孔内をセメントミルクに置換するステップと、置換時の未固結状態の材料に含まれるセメント系固化材量または水に対するセメント系固化材の配合比率を推定し、推定したセメント系固化材量または配合比率が、設計基準強度に基づいて設定した所定の範囲内であるか否かを判定するステップを有する。【選択図】図1
QUALITY CONTROL METHOD OF BACKFILLED PART
To provide a quality control method of a backfilled part which can avoid instability of strength.SOLUTION: A method for managing construction quality of a backfilled part which is constructed by using cement milk containing a cement-based solidification material and water includes: a step of, while recovering mud water from a hole that is backfilled to the ground, injecting cement milk into this hole and replacing the inside of the hole with the cement milk; and a step of estimating a cement-based solidification material amount contained in a material in an un-consolidated state at the time of replacement or a mixing ratio of the cement-based solidification material with respect to water, and determining whether or not the estimated cement-based solidification material amount or the mixing ratio is within a predetermined range set based on design reference strength.SELECTED DRAWING: Figure 1
【課題】強度の不安定性を回避することができる埋戻し部の品質管理方法を提供する。【解決手段】セメント系固化材と水とを含有するセメントミルクを用いて施工される埋戻し部の施工品質を管理するための方法であって、埋戻される孔から泥土水を地上に回収する一方で、この孔にセメントミルクを注入して、孔内をセメントミルクに置換するステップと、置換時の未固結状態の材料に含まれるセメント系固化材量または水に対するセメント系固化材の配合比率を推定し、推定したセメント系固化材量または配合比率が、設計基準強度に基づいて設定した所定の範囲内であるか否かを判定するステップを有する。【選択図】図1
QUALITY CONTROL METHOD OF BACKFILLED PART
埋戻し部の品質管理方法
KURIMOTO YUHEI (Autor:in) / ASAKA MIHARU (Autor:in)
22.09.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underground water control method for backfilled sediment layer
Europäisches Patentamt | 2016
|Horizontal pressure on barricades for backfilled stopes. Part I: Fully drained conditions
British Library Online Contents | 2009
|Horizontal pressure on barricades for backfilled stopes. Part II: Submerged conditions
British Library Online Contents | 2009
|Horizontal pressure on barricades for backfilled stopes. Part II: Submerged conditions
Online Contents | 2009
|