EVALUATION SUPPORT DEVICE, EVALUATION SUPPORT METHOD AND EVALUATION SUPPORT PROGRAM
To provide an evaluation support device, an evaluation support method and an evaluation support program which support accurate evaluation of a ground.SOLUTION: An evaluation support device 20 includes: a control part 21 which is connected to a measurement unit 10 for measuring a plurality of boring measurement values acquirable when a hole is bored in a ground; and a prediction means storage part 24 which records first prediction means for predicting soil on the basis of the boring measurement values, and second prediction means for predicting an N value on the basis of the boring measurement values. The control part 21 acquires boring measurement information from the measurement unit 10, predicts the soil using the first prediction means on the basis of the boring measurement information, calculates the N value using the second prediction means according to the predicted soil, and calculates a hardness index value of the ground using the soil and the N value.SELECTED DRAWING: Figure 1
【課題】地盤の的確な評価を支援するための評価支援装置、評価支援方法及び評価支援プログラムを提供する。【解決手段】評価支援装置20は、地盤に孔を掘削するときに取得可能な複数の掘削計測値を計測する計測ユニット10に接続された制御部21と、掘削計測値に基づいて土質を予測するための第1予測手段と、掘削計測値に基づいてN値を予測するための第2予測手段と、を記録した予測手段記憶部24と、を備える。そして、制御部21が、計測ユニット10から掘削計測情報を取得し、掘削計測情報に基づいて、第1予測手段を用いて土質を予測し、予測した土質に応じて、第2予測手段を用いてN値を算出し、土質とN値とを用いて、地盤の固さ指標値を算出する。【選択図】図1
EVALUATION SUPPORT DEVICE, EVALUATION SUPPORT METHOD AND EVALUATION SUPPORT PROGRAM
To provide an evaluation support device, an evaluation support method and an evaluation support program which support accurate evaluation of a ground.SOLUTION: An evaluation support device 20 includes: a control part 21 which is connected to a measurement unit 10 for measuring a plurality of boring measurement values acquirable when a hole is bored in a ground; and a prediction means storage part 24 which records first prediction means for predicting soil on the basis of the boring measurement values, and second prediction means for predicting an N value on the basis of the boring measurement values. The control part 21 acquires boring measurement information from the measurement unit 10, predicts the soil using the first prediction means on the basis of the boring measurement information, calculates the N value using the second prediction means according to the predicted soil, and calculates a hardness index value of the ground using the soil and the N value.SELECTED DRAWING: Figure 1
【課題】地盤の的確な評価を支援するための評価支援装置、評価支援方法及び評価支援プログラムを提供する。【解決手段】評価支援装置20は、地盤に孔を掘削するときに取得可能な複数の掘削計測値を計測する計測ユニット10に接続された制御部21と、掘削計測値に基づいて土質を予測するための第1予測手段と、掘削計測値に基づいてN値を予測するための第2予測手段と、を記録した予測手段記憶部24と、を備える。そして、制御部21が、計測ユニット10から掘削計測情報を取得し、掘削計測情報に基づいて、第1予測手段を用いて土質を予測し、予測した土質に応じて、第2予測手段を用いてN値を算出し、土質とN値とを用いて、地盤の固さ指標値を算出する。【選択図】図1
EVALUATION SUPPORT DEVICE, EVALUATION SUPPORT METHOD AND EVALUATION SUPPORT PROGRAM
評価支援装置、評価支援方法及び評価支援プログラム
HAGIWARA YOSHINORI (Autor:in)
14.12.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
ENVIRONMENT EVALUATION SUPPORT DEVICE AND ENVIRONMENT EVALUATION SUPPORT PROGRAM