SAND PILE CONSTRUCTION METHOD
To provide a sand pile construction method capable of reducing overall construction costs and environmental load by reducing heaving soil and residual soil that are generated during construction and by reducing the use of sand as a filling material.SOLUTION: The sand pile construction method includes: using a casing 10 having an excavation/compaction unit 20 and a spiral screw 30, a step of penetrating the casing 10 up to a specified depth in ground D; a step of discharging the filling material sand S when pulling out the casing 10 while rotating it in the opposite direction; introducing soil Dd as outer filling material discharged onto the ground surface Dh input from the casing surrounding and soil Dd surrounding the casing into the ground D with a spiral screw 30; and at the same time of feeding back, a step of compacting the filling material sand S and the soil Dd fed into the ground D using the compaction surface of the excavation/compaction unit 20 and the spiral screw 30 to thereby build sand pile K.SELECTED DRAWING: Figure 15
【課題】施工時に発生する盛上がり土や残土を減らし、かつ中詰めの材料砂の使用を削減することで、施工全体の低コスト化及び環境負荷の低減を図ることができる砂杭造成方法を提供する。【解決手段】砂杭造成方法は、掘削・締固め部20とスパイラルスクリュー30を備えたケーシング10を用い、ケーシング10を地盤D中に所定の深度まで貫入させた後で、ケーシング10を逆回転させながら引き抜く時に、中詰め材料砂Sを排出すると共に、ケーシング周りから投入した地表Dhに排出した外詰め材料としての土壌Dd及びケーシング周りの土壌Ddをスパイラルスクリュー30にて地盤D中に引き込み、かつ打ち戻し時に、中詰め材料砂Sと地盤D中に引き込まれた土壌Ddを掘削・締固め部20の締固め面及びスパイラルスクリュー30にて締固めて砂杭Kを造成する。【選択図】図15
SAND PILE CONSTRUCTION METHOD
To provide a sand pile construction method capable of reducing overall construction costs and environmental load by reducing heaving soil and residual soil that are generated during construction and by reducing the use of sand as a filling material.SOLUTION: The sand pile construction method includes: using a casing 10 having an excavation/compaction unit 20 and a spiral screw 30, a step of penetrating the casing 10 up to a specified depth in ground D; a step of discharging the filling material sand S when pulling out the casing 10 while rotating it in the opposite direction; introducing soil Dd as outer filling material discharged onto the ground surface Dh input from the casing surrounding and soil Dd surrounding the casing into the ground D with a spiral screw 30; and at the same time of feeding back, a step of compacting the filling material sand S and the soil Dd fed into the ground D using the compaction surface of the excavation/compaction unit 20 and the spiral screw 30 to thereby build sand pile K.SELECTED DRAWING: Figure 15
【課題】施工時に発生する盛上がり土や残土を減らし、かつ中詰めの材料砂の使用を削減することで、施工全体の低コスト化及び環境負荷の低減を図ることができる砂杭造成方法を提供する。【解決手段】砂杭造成方法は、掘削・締固め部20とスパイラルスクリュー30を備えたケーシング10を用い、ケーシング10を地盤D中に所定の深度まで貫入させた後で、ケーシング10を逆回転させながら引き抜く時に、中詰め材料砂Sを排出すると共に、ケーシング周りから投入した地表Dhに排出した外詰め材料としての土壌Dd及びケーシング周りの土壌Ddをスパイラルスクリュー30にて地盤D中に引き込み、かつ打ち戻し時に、中詰め材料砂Sと地盤D中に引き込まれた土壌Ddを掘削・締固め部20の締固め面及びスパイラルスクリュー30にて締固めて砂杭Kを造成する。【選択図】図15
SAND PILE CONSTRUCTION METHOD
砂杭造成方法
NAGAISHI MASAHIRO (Autor:in) / OGATA FUTOSHI (Autor:in) / YABE HIROSHI (Autor:in)
21.12.2023
Patent
Elektronische Ressource
Japanisch