Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
WATER CUTOFF METHOD AND DRAIN GROOVE
To provide a new technique for cutting off or preventing water leakage in a drain groove.SOLUTION: A water cutoff method for cutting off water leakage in a steel drain groove having a concrete floor slab, a mortar layer laid on the concrete floor slab, and a steel bottom plate laid on the mortar layer, includes: an injection hole drilling step of forming an injection hole for injecting a water cutoff agent for cutting off water leakage, in a steel bottom plate at a predetermined interval; and a filling step of filling the hole formed in the injection hole drilling step with a water cutoff agent which is obtained by mixing resin emulsion (liquid A) in which a petroleum resin and an acrylic resin are emulsified in water by polyvinyl alcohol and an urethane composition (liquid B) containing an urethane prepolymer, in which a mass ratio (liquid A: liquid B) of the resin emulsion to the urethane composition is 100:5 to 100:20.SELECTED DRAWING: Figure 3
【課題】排水溝における漏水を止水又は防止する新たな技術を提供する。【解決手段】コンクリート製床版と、コンクリート製床版の上に敷設されたモルタル層と、モルタル層の上に敷設された鋼製底板とを有する鋼製の排水溝における漏水を止水する止水工法であって、鋼製底板に、所定の間隔をあけて、漏水を止水する止水剤を注入する注入孔を形成する注入孔の削孔工程と、注入孔の削孔工程で形成した孔に、石油樹脂とアクリル樹脂をポリビニルアルコールによって水に乳化させた樹脂エマルジョン(A液)と、ウレタンプレポリマーを含むウレタン組成物(B液)とを混合して成り、 樹脂エマルジョンとウレタン組成物の質量比(A液:B液)が、100:5~100:20である止水剤を充填する充填工程と、を含む。【選択図】図3
WATER CUTOFF METHOD AND DRAIN GROOVE
To provide a new technique for cutting off or preventing water leakage in a drain groove.SOLUTION: A water cutoff method for cutting off water leakage in a steel drain groove having a concrete floor slab, a mortar layer laid on the concrete floor slab, and a steel bottom plate laid on the mortar layer, includes: an injection hole drilling step of forming an injection hole for injecting a water cutoff agent for cutting off water leakage, in a steel bottom plate at a predetermined interval; and a filling step of filling the hole formed in the injection hole drilling step with a water cutoff agent which is obtained by mixing resin emulsion (liquid A) in which a petroleum resin and an acrylic resin are emulsified in water by polyvinyl alcohol and an urethane composition (liquid B) containing an urethane prepolymer, in which a mass ratio (liquid A: liquid B) of the resin emulsion to the urethane composition is 100:5 to 100:20.SELECTED DRAWING: Figure 3
【課題】排水溝における漏水を止水又は防止する新たな技術を提供する。【解決手段】コンクリート製床版と、コンクリート製床版の上に敷設されたモルタル層と、モルタル層の上に敷設された鋼製底板とを有する鋼製の排水溝における漏水を止水する止水工法であって、鋼製底板に、所定の間隔をあけて、漏水を止水する止水剤を注入する注入孔を形成する注入孔の削孔工程と、注入孔の削孔工程で形成した孔に、石油樹脂とアクリル樹脂をポリビニルアルコールによって水に乳化させた樹脂エマルジョン(A液)と、ウレタンプレポリマーを含むウレタン組成物(B液)とを混合して成り、 樹脂エマルジョンとウレタン組成物の質量比(A液:B液)が、100:5~100:20である止水剤を充填する充填工程と、を含む。【選択図】図3
WATER CUTOFF METHOD AND DRAIN GROOVE
止水工法、及び排水溝
SANO MASAKI (Autor:in) / SATO WATARU (Autor:in)
07.02.2024
Patent
Elektronische Ressource
Japanisch
IPC:
C09K
Materialien für Anwendungen, soweit nicht anderweitig vorgesehen
,
MATERIALS FOR APPLICATIONS NOT OTHERWISE PROVIDED FOR
/
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E03F
SEWERS
,
Abwasserkanäle
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS