CONNECTION STRUCTURE AND CONNECTION METHOD
To provide a connection structure and a connection method that can sufficiently transmit tensile force or moment of a horizontal member of a reinforced concrete to a steel column and efficiently form the horizontal member.SOLUTION: A connection structure 110 in which a reinforced concrete slab 120 is connected to a square steel pipe column 111 has horizontal steel plates 115, 116, slab reinforcements 121, 122, and anchorage reinforcements 131 to 134. A plurality of cutout parts for fixing parts of the anchorage reinforcements 131 to 134 are formed on the horizontal steel plates 115, 116 fixed to an outer periphery of the square steel pipe column 111. The anchorage reinforcements 131 to 134 are embedded in the slab 120 and transmit tensile force of the slab reinforcements 121, 122. Number of the anchorage reinforcements 131 to 134 is smaller than number of the slab reinforcements 121 (122) disposed in parallel toward the horizontal steel plates 115 (116) corresponding to each stage of the anchorage reinforcements 131 to 134.SELECTED DRAWING: Figure 24
【課題】鉄筋コンクリートの水平材の引張力やモーメントを、鉄骨柱に十分に伝達するとともに、水平材を効率的に形成することができる接続構造及び接続方法を提供する。【解決手段】角形鋼管柱111に鉄筋コンクリートのスラブ120を接続した接続構造110は、水平鋼板115,116とスラブ筋121,122と定着筋131~134とを備える。角形鋼管柱111の外周に固定された水平鋼板115,116には、定着筋131~134の一部を固定する複数の切欠部が形成されている。定着筋131~134は、スラブ120に埋設されてスラブ筋121,122の引張力を伝達する。定着筋131~134の本数は、定着筋131~134の各段に対応する水平鋼板115(116)に向かって平行に配置されたスラブ筋121(122)の本数よりも少ない。【選択図】図24
CONNECTION STRUCTURE AND CONNECTION METHOD
To provide a connection structure and a connection method that can sufficiently transmit tensile force or moment of a horizontal member of a reinforced concrete to a steel column and efficiently form the horizontal member.SOLUTION: A connection structure 110 in which a reinforced concrete slab 120 is connected to a square steel pipe column 111 has horizontal steel plates 115, 116, slab reinforcements 121, 122, and anchorage reinforcements 131 to 134. A plurality of cutout parts for fixing parts of the anchorage reinforcements 131 to 134 are formed on the horizontal steel plates 115, 116 fixed to an outer periphery of the square steel pipe column 111. The anchorage reinforcements 131 to 134 are embedded in the slab 120 and transmit tensile force of the slab reinforcements 121, 122. Number of the anchorage reinforcements 131 to 134 is smaller than number of the slab reinforcements 121 (122) disposed in parallel toward the horizontal steel plates 115 (116) corresponding to each stage of the anchorage reinforcements 131 to 134.SELECTED DRAWING: Figure 24
【課題】鉄筋コンクリートの水平材の引張力やモーメントを、鉄骨柱に十分に伝達するとともに、水平材を効率的に形成することができる接続構造及び接続方法を提供する。【解決手段】角形鋼管柱111に鉄筋コンクリートのスラブ120を接続した接続構造110は、水平鋼板115,116とスラブ筋121,122と定着筋131~134とを備える。角形鋼管柱111の外周に固定された水平鋼板115,116には、定着筋131~134の一部を固定する複数の切欠部が形成されている。定着筋131~134は、スラブ120に埋設されてスラブ筋121,122の引張力を伝達する。定着筋131~134の本数は、定着筋131~134の各段に対応する水平鋼板115(116)に向かって平行に配置されたスラブ筋121(122)の本数よりも少ない。【選択図】図24
CONNECTION STRUCTURE AND CONNECTION METHOD
接続構造及び接続方法
HAGIO HIROYA (Autor:in) / YONEZAWA KENJI (Autor:in) / SHIBUICHI KATSUHIKO (Autor:in) / MIURA KOTA (Autor:in) / KASHIMATA AKIKO (Autor:in) / SATO TOMONARI (Autor:in)
05.04.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CONNECTION STRUCTURE, CONNECTION METHOD AND STRUCTURE