JOINTING METHOD OF PILE AND SUPERSTRUCTURE
To provide a jointing method of a pile and a superstructure reduced in a construction period by simplifying error correction work of the vertical direction of the pile and centering work of the pile and the superstructure.SOLUTION: In a jointing method, piles 1 (concrete piles) erected into ground 2 are jointed to a cap steel pipe 15 provided with a base plate 17 jointed with the lower end of a column 18 (superstructure) at an upper end and arranged by covering around a head part of the pile. An erection tool 10 is fixed to the head part of the pile. Then, the position in the vertical and horizontal directions of the base plate supported by the erection tool is adjusted. Then, the base plate finished in the positional adjustment of the vertical and horizontal directions is fixed to the erection tool. Then, filler 20 is filled inside the cap steel pipe and on the outer periphery of the pile via a filling hole 17b provided in the base plate.SELECTED DRAWING: Figure 1
【課題】杭の鉛直方向の誤差修正作業と、杭及び上部構造物の芯出し作業を簡単に行うことで工期の短縮を図ることができる杭と上部構造物との接合方法を提供する。【解決手段】地盤2に建込んだ杭(コンクリート杭)1と、柱(上部構造物)18の下端が接合されているベースプレート17を上端部に設けて杭の杭頭部の周囲に被せて配置したキャップ鋼管15と、を接合する方法である。杭の杭頭部に、建込み治具10を固定する。次いで、建込み治具に支持されたベースプレートの鉛直方向及び水平方向の位置を調整する。次いで、鉛直方向及び水平方向の位置調整が完了したベースプレートを建込み治具に固定する。次いで、ベースプレートに設けた充填孔17bを介してキャップ鋼管の内部及び杭の外周に充填材20を充填する。【選択図】図1
JOINTING METHOD OF PILE AND SUPERSTRUCTURE
To provide a jointing method of a pile and a superstructure reduced in a construction period by simplifying error correction work of the vertical direction of the pile and centering work of the pile and the superstructure.SOLUTION: In a jointing method, piles 1 (concrete piles) erected into ground 2 are jointed to a cap steel pipe 15 provided with a base plate 17 jointed with the lower end of a column 18 (superstructure) at an upper end and arranged by covering around a head part of the pile. An erection tool 10 is fixed to the head part of the pile. Then, the position in the vertical and horizontal directions of the base plate supported by the erection tool is adjusted. Then, the base plate finished in the positional adjustment of the vertical and horizontal directions is fixed to the erection tool. Then, filler 20 is filled inside the cap steel pipe and on the outer periphery of the pile via a filling hole 17b provided in the base plate.SELECTED DRAWING: Figure 1
【課題】杭の鉛直方向の誤差修正作業と、杭及び上部構造物の芯出し作業を簡単に行うことで工期の短縮を図ることができる杭と上部構造物との接合方法を提供する。【解決手段】地盤2に建込んだ杭(コンクリート杭)1と、柱(上部構造物)18の下端が接合されているベースプレート17を上端部に設けて杭の杭頭部の周囲に被せて配置したキャップ鋼管15と、を接合する方法である。杭の杭頭部に、建込み治具10を固定する。次いで、建込み治具に支持されたベースプレートの鉛直方向及び水平方向の位置を調整する。次いで、鉛直方向及び水平方向の位置調整が完了したベースプレートを建込み治具に固定する。次いで、ベースプレートに設けた充填孔17bを介してキャップ鋼管の内部及び杭の外周に充填材20を充填する。【選択図】図1
JOINTING METHOD OF PILE AND SUPERSTRUCTURE
杭と上部構造物との接合方法
KAMEDA TETSUJIRO (Autor:in) / NORO AKIRA (Autor:in) / IKEDA TATSUYA (Autor:in)
08.04.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
PILE, JOINTING METHOD OF PILES AND REMOVAL METHOD OF UPPER PILE
Europäisches Patentamt | 2019
|