Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SUBSTRATE METAL FITTING, PANEL FOR MOUNTING FINISHING MATERIAL, FINISHING MATERIAL MOUNTING STRUCTURE, AND BUILDING
To provide a substrate metal fitting which does not block (restrict) a locking of a panel or a finishing material in earthquake, a panel for mounting the finishing material, the finishing material mounting structure, and building.SOLUTION: The substrate metal fitting consisting of a plurality of metal fittings to mount a finishing material to a panel has a first substrate metal fitting mounted to a surface of the panel and a second substrate metal fitting with the finishing material mounted directly of indirectly, the first substrate metal fitting is mounted to the panel by a first mount shaft, the second substrate metal fitting is mounted to the first substrate metal fitting by a second mount shaft being coaxial or substantially parallel to the first mount shaft while being rotatable in a plane on the first substrate metal fitting, the first mount shaft and the second mount shaft have separated mount positions in out of plane direction when being coaxial and are deflected for a predetermined interval in a predetermined radial direction around the first mount shaft of the second mount shaft when being substantially parallel.SELECTED DRAWING: Figure 1
【課題】地震時にパネルおよび仕上げ材のロッキングを阻害(拘束)しない下地金具、仕上げ材取付用パネル、仕上げ材取付構造物および建物を提供すること。【解決手段】パネルに仕上げ材を取り付けるための複数の金具からなる下地金具であって、パネルの表面に取り付けられる第1の下地金具と、仕上げ材が直接または間接的に取り付けられる第2の下地金具と、を有し、第1の下地金具は、第1の取付軸で前記パネルに取り付けられ、第2の下地金具は、第1の取付軸と同軸上または略平行な第2の取付軸で第1の下地金具に取り付けられるとともに、第1の下地金具上で面内に回動可能とされており、第1の取付軸と第2の取付軸とは、同軸上にある場合は面外方向に取付け位置が分かれており、略平行の場合は第1または第2の取付軸を中心とした所定の半径方向に所定の間隔でずれていることを特徴とする。【選択図】図1
SUBSTRATE METAL FITTING, PANEL FOR MOUNTING FINISHING MATERIAL, FINISHING MATERIAL MOUNTING STRUCTURE, AND BUILDING
To provide a substrate metal fitting which does not block (restrict) a locking of a panel or a finishing material in earthquake, a panel for mounting the finishing material, the finishing material mounting structure, and building.SOLUTION: The substrate metal fitting consisting of a plurality of metal fittings to mount a finishing material to a panel has a first substrate metal fitting mounted to a surface of the panel and a second substrate metal fitting with the finishing material mounted directly of indirectly, the first substrate metal fitting is mounted to the panel by a first mount shaft, the second substrate metal fitting is mounted to the first substrate metal fitting by a second mount shaft being coaxial or substantially parallel to the first mount shaft while being rotatable in a plane on the first substrate metal fitting, the first mount shaft and the second mount shaft have separated mount positions in out of plane direction when being coaxial and are deflected for a predetermined interval in a predetermined radial direction around the first mount shaft of the second mount shaft when being substantially parallel.SELECTED DRAWING: Figure 1
【課題】地震時にパネルおよび仕上げ材のロッキングを阻害(拘束)しない下地金具、仕上げ材取付用パネル、仕上げ材取付構造物および建物を提供すること。【解決手段】パネルに仕上げ材を取り付けるための複数の金具からなる下地金具であって、パネルの表面に取り付けられる第1の下地金具と、仕上げ材が直接または間接的に取り付けられる第2の下地金具と、を有し、第1の下地金具は、第1の取付軸で前記パネルに取り付けられ、第2の下地金具は、第1の取付軸と同軸上または略平行な第2の取付軸で第1の下地金具に取り付けられるとともに、第1の下地金具上で面内に回動可能とされており、第1の取付軸と第2の取付軸とは、同軸上にある場合は面外方向に取付け位置が分かれており、略平行の場合は第1または第2の取付軸を中心とした所定の半径方向に所定の間隔でずれていることを特徴とする。【選択図】図1
SUBSTRATE METAL FITTING, PANEL FOR MOUNTING FINISHING MATERIAL, FINISHING MATERIAL MOUNTING STRUCTURE, AND BUILDING
下地金具、仕上げ材取付用パネル、仕上げ材取付構造物および建物
YAMAGUCHI KOHEI (Autor:in) / MATSUSHITA KENICHI (Autor:in) / OSADA SHIGEKI (Autor:in)
31.05.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|FINISHING MATERIAL MOUNTING WALL STRUCTURE AND BUILDING
Europäisches Patentamt | 2024
|FINISHING MATERIAL FIXING STRUCTURE AND FINISHING MATERIAL FIXING METAL FITTING
Europäisches Patentamt | 2023
|