PURPOSE: To provide an earth-retaining wall, an earth-retaining wall construction method, and a drilling guide device.CONSTITUTION: An earth-retaining wall comprises: an earth-retaining construction area A comprising straight portions along X and Y directions and a plurality of corners; soldier piles B1 arranged along the X and Y directions and having H-steel 2; cylindrical side walls 4; and intermediate walls 5 partially intersecting the side walls. A flange 21 on one side of the H-steel 2 of each soldier pile B1 arranged along the X and Y directions of the earth-retaining construction area A is disposed to face the inner side of the earth-retaining construction area A such that the respective flanges 21 on the inner side are aligned in a straight line along the X and Y directions. In each soldier pile B1, the H-steel 2 has a concrete support 3 formed from cement milk from the bottom end to the middle of its depth. The depth of the side walls 4 and the depth of the intermediate walls 5 are equal and set to be shallower than the depth of soldier piles B1. A lower part of a side wall 4 and an upper part of the concrete support 3 of a soldier pile B1 intersect, and a part of the side wall 4 is received in a gap S between both flanges 21 of the H-steel 2.SELECTED DRAWING: Figure 1
【目的】土留め壁,土留め壁施工方法及び掘削ガイド装置を提供すること。【構成】X方向及びY方向に沿う直線部分と複数の角部とによって構成される土留め施工領域Aと、X方向及びY方向に沿って配列され且つH型鋼2を有する親杭B1と、円筒状の側壁4と、側壁と一部が交わる中間壁5とを備えること。土留め施工領域AのX方向及びY方向沿って配列される親杭B1のH型鋼2のそれぞれの一方側のフランジ21は、土留め施工領域Aの内方側に対向すると共にX方向及びY方向に沿って内方側の前記フランジ21が直線状に揃うように配置され、前記親杭B1は下端から深さの中間までH型鋼2がセメントミルクによってコンクリート支持部3が形成され、側壁4と中間壁5の深さは同一とし、親杭B1の深さよりも浅く設定され、側壁4の下方と親杭B1のコンクリート支持部3の上方とが交わる共に側壁4の一部はH型鋼2の両フランジ21間の空隙Sに収められる。【選択図】 図1
PURPOSE: To provide an earth-retaining wall, an earth-retaining wall construction method, and a drilling guide device.CONSTITUTION: An earth-retaining wall comprises: an earth-retaining construction area A comprising straight portions along X and Y directions and a plurality of corners; soldier piles B1 arranged along the X and Y directions and having H-steel 2; cylindrical side walls 4; and intermediate walls 5 partially intersecting the side walls. A flange 21 on one side of the H-steel 2 of each soldier pile B1 arranged along the X and Y directions of the earth-retaining construction area A is disposed to face the inner side of the earth-retaining construction area A such that the respective flanges 21 on the inner side are aligned in a straight line along the X and Y directions. In each soldier pile B1, the H-steel 2 has a concrete support 3 formed from cement milk from the bottom end to the middle of its depth. The depth of the side walls 4 and the depth of the intermediate walls 5 are equal and set to be shallower than the depth of soldier piles B1. A lower part of a side wall 4 and an upper part of the concrete support 3 of a soldier pile B1 intersect, and a part of the side wall 4 is received in a gap S between both flanges 21 of the H-steel 2.SELECTED DRAWING: Figure 1
【目的】土留め壁,土留め壁施工方法及び掘削ガイド装置を提供すること。【構成】X方向及びY方向に沿う直線部分と複数の角部とによって構成される土留め施工領域Aと、X方向及びY方向に沿って配列され且つH型鋼2を有する親杭B1と、円筒状の側壁4と、側壁と一部が交わる中間壁5とを備えること。土留め施工領域AのX方向及びY方向沿って配列される親杭B1のH型鋼2のそれぞれの一方側のフランジ21は、土留め施工領域Aの内方側に対向すると共にX方向及びY方向に沿って内方側の前記フランジ21が直線状に揃うように配置され、前記親杭B1は下端から深さの中間までH型鋼2がセメントミルクによってコンクリート支持部3が形成され、側壁4と中間壁5の深さは同一とし、親杭B1の深さよりも浅く設定され、側壁4の下方と親杭B1のコンクリート支持部3の上方とが交わる共に側壁4の一部はH型鋼2の両フランジ21間の空隙Sに収められる。【選択図】 図1
EARTH-RETAINING WALL
土留め壁
KANNO TAKEFUMI (Autor:in)
08.08.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
EARTH RETAINING WALL, CONSTRUCTION METHOD OF EARTH RETAINING WALL