Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION METHOD OF IMPERMEABLE TYPE DAM
To provide a dam having an upstream wall surface formed of wall surface material, on the upstream wall of which a capturing body for capturing objects flowed from an upstream side is arranged.SOLUTION: An impermeable type dam 1 comprising: an upstream wall surface 20 arranged so as to face an upstream side of a river, on which a plurality of segments 21 are connected; a downstream wall surface 30 arranged to face a downstream side of the river, on which a plurality of segments 31 are connected; filler 40 arranged between the upstream wall surface 20 and the downstream wall surface 30; a capturing structure 50 having at least one column member 51 for capturing objects flowed down from the upstream; and a waterway part 15. A construction method thereof comprises the steps of: forming the upstream wall 20 and the downstream wall 30 of a specific height using the segments 21, 31; installing the filler 40 between the segments 21, 31; and installing the capturing structure 50 on a side of the upstream wall surface 20, wherein an end of the column member 51 is partially buried in the filler 40 in the step of installing the capturing structure 50.SELECTED DRAWING: Figure 1A
【課題】壁面材により上流壁面が形成された堰堤において、上流側から流れてくる物体を捕捉する捕捉体を上流壁面に設ける。【解決手段】複数のセグメント21が連結され河川の上流側に面するように設けられた上流壁面20と、複数のセグメント31が連結され河川の下流側に面するように設けられた下流壁面30と、上流壁面20及び下流壁面30の間に設けられた中詰材40と、上流から流れてくる物体を捕捉する少なくとも1つの柱部材51を有する捕捉工50と、水通し部15と、を有する不透過型の堰堤1を構築する。セグメント21,31により、所定の高さの上流壁面20及び下流壁面30を形成する工程と、セグメント21,31間に中詰材40を打設する工程と、捕捉工50を上流壁面20の側で設置する工程と、を含み、捕捉工50を設置する工程において、柱部材51の一端を部分的に中詰材40に埋める。【選択図】図1A
CONSTRUCTION METHOD OF IMPERMEABLE TYPE DAM
To provide a dam having an upstream wall surface formed of wall surface material, on the upstream wall of which a capturing body for capturing objects flowed from an upstream side is arranged.SOLUTION: An impermeable type dam 1 comprising: an upstream wall surface 20 arranged so as to face an upstream side of a river, on which a plurality of segments 21 are connected; a downstream wall surface 30 arranged to face a downstream side of the river, on which a plurality of segments 31 are connected; filler 40 arranged between the upstream wall surface 20 and the downstream wall surface 30; a capturing structure 50 having at least one column member 51 for capturing objects flowed down from the upstream; and a waterway part 15. A construction method thereof comprises the steps of: forming the upstream wall 20 and the downstream wall 30 of a specific height using the segments 21, 31; installing the filler 40 between the segments 21, 31; and installing the capturing structure 50 on a side of the upstream wall surface 20, wherein an end of the column member 51 is partially buried in the filler 40 in the step of installing the capturing structure 50.SELECTED DRAWING: Figure 1A
【課題】壁面材により上流壁面が形成された堰堤において、上流側から流れてくる物体を捕捉する捕捉体を上流壁面に設ける。【解決手段】複数のセグメント21が連結され河川の上流側に面するように設けられた上流壁面20と、複数のセグメント31が連結され河川の下流側に面するように設けられた下流壁面30と、上流壁面20及び下流壁面30の間に設けられた中詰材40と、上流から流れてくる物体を捕捉する少なくとも1つの柱部材51を有する捕捉工50と、水通し部15と、を有する不透過型の堰堤1を構築する。セグメント21,31により、所定の高さの上流壁面20及び下流壁面30を形成する工程と、セグメント21,31間に中詰材40を打設する工程と、捕捉工50を上流壁面20の側で設置する工程と、を含み、捕捉工50を設置する工程において、柱部材51の一端を部分的に中詰材40に埋める。【選択図】図1A
CONSTRUCTION METHOD OF IMPERMEABLE TYPE DAM
不透過型の堰堤を構築する方法
NOZAKI YUSUKE (Autor:in)
19.09.2024
Patent
Elektronische Ressource
Japanisch
CONSTRUCTION METHOD FOR UNDERGROUND IMPERMEABLE WALL, AND UNDERGROUND IMPERMEABLE WALL
Europäisches Patentamt | 2016
|Precipitation construction method of impermeable interlayer
Europäisches Patentamt | 2022
|STEEL IMPERMEABLE WALL AND IMPERMEABLE METHOD OF STEEL IMPERMEABLE WALL
Europäisches Patentamt | 2021
|