Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SUSPENSION BOLT MOUNTING HARDWARE AND SUSPENSION BOLT MOUNTING STRUCTURE
To provide suspension bolt mounting hardware and a suspension bolt mounting structure that can improve workability.SOLUTION: Mounting hardware (200 to 200g) for mounting a suspension bolt 10 to suspension receivers (100, 100a) including a first C-shaped steel with an opening 116 directed to one side comprises: a locking portion 220 lockable to a lower lip 115 that constitutes the opening 116; a suspension bolt mounting portion 240 to which the suspension bolt 10 is mounted; temporary fixing portions (250 to 250d, 230, 250f, 250g) that perform temporary fixing to the suspension receivers (100, 100a); and fixing portions (210, 230) that can be fixed to the suspension receivers (100, 100a) in a state of temporary fixing by the temporary fixing portions.SELECTED DRAWING: Figure 3
【課題】作業性の向上を図ることができる吊りボルト取付金物及び吊りボルト取付構造を提供する。【解決手段】開口部116を一側方へ向けた第一のC形鋼を含む吊受材(100、100a)に、吊りボルト10を取り付けるための取付金物(200~200g)であって、開口部116を構成する下側リップ115に係止可能な係止部220と、吊りボルト10が取り付けられる吊りボルト取付部240と、吊受材(100、100a)に対する仮止めを行う仮止め部(250~250d、230、250f、250g、)と、仮止め部による仮止めを行った状態で吊受材(100、100a)と固定可能な固定部(210、230)と、を具備する。【選択図】図3
SUSPENSION BOLT MOUNTING HARDWARE AND SUSPENSION BOLT MOUNTING STRUCTURE
To provide suspension bolt mounting hardware and a suspension bolt mounting structure that can improve workability.SOLUTION: Mounting hardware (200 to 200g) for mounting a suspension bolt 10 to suspension receivers (100, 100a) including a first C-shaped steel with an opening 116 directed to one side comprises: a locking portion 220 lockable to a lower lip 115 that constitutes the opening 116; a suspension bolt mounting portion 240 to which the suspension bolt 10 is mounted; temporary fixing portions (250 to 250d, 230, 250f, 250g) that perform temporary fixing to the suspension receivers (100, 100a); and fixing portions (210, 230) that can be fixed to the suspension receivers (100, 100a) in a state of temporary fixing by the temporary fixing portions.SELECTED DRAWING: Figure 3
【課題】作業性の向上を図ることができる吊りボルト取付金物及び吊りボルト取付構造を提供する。【解決手段】開口部116を一側方へ向けた第一のC形鋼を含む吊受材(100、100a)に、吊りボルト10を取り付けるための取付金物(200~200g)であって、開口部116を構成する下側リップ115に係止可能な係止部220と、吊りボルト10が取り付けられる吊りボルト取付部240と、吊受材(100、100a)に対する仮止めを行う仮止め部(250~250d、230、250f、250g、)と、仮止め部による仮止めを行った状態で吊受材(100、100a)と固定可能な固定部(210、230)と、を具備する。【選択図】図3
SUSPENSION BOLT MOUNTING HARDWARE AND SUSPENSION BOLT MOUNTING STRUCTURE
吊りボルト取付金物及び吊りボルト取付構造
SALAIDEN MUSA (Autor:in) / NAKAGAWA MANABU (Autor:in) / MORI TAKAHISA (Autor:in) / HOSOKAWA TOSHIHARU (Autor:in) / ARIMA FUYUKI (Autor:in) / FURUKAWA MASASHI (Autor:in) / KITAMURA YUKINORI (Autor:in) / HONDA YOSUKE (Autor:in) / KUSUMOTO YUTAKA (Autor:in)
24.09.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS