Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
FITTING AND FITTING CONSTRUCTION METHOD
To provide a fitting and a fitting construction method capable of improving workability and reducing materials when constructing the fitting including an upper rail.SOLUTION: A method of constructing a fitting 1 includes the steps of: fixing a pair of vertical frames 20 to the side edges on both sides of an opening 2A; mounting a holding member 50 to the upper end of one of the vertical frames 20 for vertical movement; temporarily holding one end of an upper rail 30 to the holding member 50; mounting another holding member 50 to the upper end of the other vertical frame 20 for vertical movement; temporarily holding the other end of the upper rail 30 to the other holding member 50; fixing each holding member 50 to the vertical frame 20 in a state where the position of each holding member 50 in the vertical direction is adjusted to the position of the upper rail 30 in the vertical direction; fixing the upper rail 30 to the upper edge of the opening 2A; and installing a sash 10 to the upper rail 30 so as to be openable and closable via a hanging wheel 15.SELECTED DRAWING: Figure 13
【課題】上レールを含む建具を施工するにあたり、施工性が向上するとともに資材の削減を図ることができる建具及び建具の施工方法を提供する。【解決手段】建具1の施工方法は、開口部2Aの両側の側縁に一対の縦枠20を固定する工程と、一対の縦枠20のうちの一方の縦枠20の上端部に保持部材50を上下動可能に装着する工程と、この保持部材50に上レール30の一端部を仮保持する工程と、他方の縦枠20の上端部に他の保持部材50を上下動可能に装着する工程と、この他の保持部材50に上レール30の他端部を仮保持する工程と、各保持部材50の上下方向位置を調整して上レール30の上下方向位置に定めた状態で、各保持部材50を縦枠20に固定する工程と、上レール30を開口部2Aの上縁に固定する工程と、上レール30に吊車15を介して障子10を開閉可能に設置する工程と、を備える。【選択図】図13
FITTING AND FITTING CONSTRUCTION METHOD
To provide a fitting and a fitting construction method capable of improving workability and reducing materials when constructing the fitting including an upper rail.SOLUTION: A method of constructing a fitting 1 includes the steps of: fixing a pair of vertical frames 20 to the side edges on both sides of an opening 2A; mounting a holding member 50 to the upper end of one of the vertical frames 20 for vertical movement; temporarily holding one end of an upper rail 30 to the holding member 50; mounting another holding member 50 to the upper end of the other vertical frame 20 for vertical movement; temporarily holding the other end of the upper rail 30 to the other holding member 50; fixing each holding member 50 to the vertical frame 20 in a state where the position of each holding member 50 in the vertical direction is adjusted to the position of the upper rail 30 in the vertical direction; fixing the upper rail 30 to the upper edge of the opening 2A; and installing a sash 10 to the upper rail 30 so as to be openable and closable via a hanging wheel 15.SELECTED DRAWING: Figure 13
【課題】上レールを含む建具を施工するにあたり、施工性が向上するとともに資材の削減を図ることができる建具及び建具の施工方法を提供する。【解決手段】建具1の施工方法は、開口部2Aの両側の側縁に一対の縦枠20を固定する工程と、一対の縦枠20のうちの一方の縦枠20の上端部に保持部材50を上下動可能に装着する工程と、この保持部材50に上レール30の一端部を仮保持する工程と、他方の縦枠20の上端部に他の保持部材50を上下動可能に装着する工程と、この他の保持部材50に上レール30の他端部を仮保持する工程と、各保持部材50の上下方向位置を調整して上レール30の上下方向位置に定めた状態で、各保持部材50を縦枠20に固定する工程と、上レール30を開口部2Aの上縁に固定する工程と、上レール30に吊車15を介して障子10を開閉可能に設置する工程と、を備える。【選択図】図13
FITTING AND FITTING CONSTRUCTION METHOD
建具及び建具の施工方法
KINOSHITA MASAYUKI (Autor:in) / TAKAYANAGI KOHARU (Autor:in)
10.10.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E05D
Scharniere oder andere Aufhängevorrichtungen für Türen, Fenster oder Flügel
,
HINGES OR OTHER SUSPENSION DEVICES FOR DOORS, WINDOWS, OR WINGS