Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PRECAST ROCK SHED TUNNEL AND THE CONSTRUCTION METHOD THEREFOR
The present invention relates to a precast rock shed tunnel and a construction method thereof, which enable the effective prefabrication and installation of a bottom plate, a wall, and an upper slab and enable the rapid and cost-efficient construction of a rock shed tunnel by effectively enhancing load bearing capacity. The precast rock shed tunnel comprises: a rear inclined wall; back-filling concrete which sequentially connects the rear inclined walls to each other; an upper plate structure which is formed to be extended upward; an inner compression member which is formed between the rear inclined wall and the upper plate structure; and a filling material which is formed on the inclined surface and the top of the upper plate structure.
저판, 벽체 및 상부슬래브를 보다 효과적으로 조립 설치할 수 있으며, 하중 지지능력을 효과적으로 증진시켜 보다 신속하고 경제적인 피암터널을 시공할 수 있는 프리캐스트부재로 제작된 피암터널 및 그 시공방법에 관한 것으로서, 상기 피암터널은 후방경사벽체; 후방경사벽체를 연속화시키는 뒷채움콘크리트; 상방으로 연장되도록 형성된 상판구조체; 상기 후방경사벽체와 상판구조체 사이의 내측압축재; 및 상기 경사면과 상판구조체 상부에 형성된 성토재;를 포함한다.
PRECAST ROCK SHED TUNNEL AND THE CONSTRUCTION METHOD THEREFOR
The present invention relates to a precast rock shed tunnel and a construction method thereof, which enable the effective prefabrication and installation of a bottom plate, a wall, and an upper slab and enable the rapid and cost-efficient construction of a rock shed tunnel by effectively enhancing load bearing capacity. The precast rock shed tunnel comprises: a rear inclined wall; back-filling concrete which sequentially connects the rear inclined walls to each other; an upper plate structure which is formed to be extended upward; an inner compression member which is formed between the rear inclined wall and the upper plate structure; and a filling material which is formed on the inclined surface and the top of the upper plate structure.
저판, 벽체 및 상부슬래브를 보다 효과적으로 조립 설치할 수 있으며, 하중 지지능력을 효과적으로 증진시켜 보다 신속하고 경제적인 피암터널을 시공할 수 있는 프리캐스트부재로 제작된 피암터널 및 그 시공방법에 관한 것으로서, 상기 피암터널은 후방경사벽체; 후방경사벽체를 연속화시키는 뒷채움콘크리트; 상방으로 연장되도록 형성된 상판구조체; 상기 후방경사벽체와 상판구조체 사이의 내측압축재; 및 상기 경사면과 상판구조체 상부에 형성된 성토재;를 포함한다.
PRECAST ROCK SHED TUNNEL AND THE CONSTRUCTION METHOD THEREFOR
프리캐스트부재로 제작된 피암터널 및 그 시공방법
AN CHANG IL (Autor:in)
11.11.2015
Patent
Elektronische Ressource
Koreanisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
PRECAST ROCK SHED TUNNEL USING E FULLY INTEGRATED CONNECTION AND THE CONSTRUCTION METHOD THEREFOR
Europäisches Patentamt | 2021
|Prototype Model Tests for Precast PC Rock-Shed Roofs+
British Library Conference Proceedings | 1996
|Precast concrete engine shed roofs
Engineering Index Backfile | 1948
Precast concrete engine shed roofs
Engineering Index Backfile | 1948