Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PRECAST ROCK SHED TUNNEL USING E FULLY INTEGRATED CONNECTION AND THE CONSTRUCTION METHOD THEREFOR
The present invention relates to a precast rock shed tunnel using a fully integrated connection and a construction method therefor, which are able to construct both abutment units, horizontally place a precast arch panel on an upper surface of the abutment units, and fully integrate them, thereby constructing the precast rock shed tunnel rapidly in a stable manner. The precast rock shed tunnel using the fully integrated connection comprises: both abutment units with vertical rod members, whose lower end is settled inside, placed on the upper surface and extended upward; a precast arch panel which includes an arch unit between both connection flanges which are penetrated by the vertical rod members; and a horizontal control jig unit between both the connection flanges and an upper surface of both the abutment units so that the precast arch panel can be horizontally placed on an upper surface of both the abutment units. A head unit of the vertical rod members is fixed on an upper surface of the connection flanges of the precast arch panel after tension, thereby being fully integrated.
양 교대부를 먼저 시공한 후, 교대부 상면에 프리캐스트 아치패널을 수평으로 세팅시킨 후, 강결시켜 피암터널을 신속하고, 안정적으로 시공하는 강결접합을 이용한 피암터널 및 그 시공방법에 관한 것으로서, 상기 강결접합을 이용한 피암터널은 상면에 하단이 내부에 정착된 수직봉부재가 상방으로 연장되도록 형성된 양 교대부: 상기 수직봉부재가 양 연결플랜지를 관통하며, 양 연결플랜지 사이의 아치부를 포함하는 프리캐스트 아치패널; 및 상기 양 연결플랜지와 양 교대부의 상면 사이에 설치되어 프리캐스트 아치패널가 양 교대부 상면에 수평으로 세팅하도록 설치된 수평조절지그대;를 포함하여, 상기 수직봉부재의 두부가 프리캐스트 아치패널의 연결플랜지 상면에 긴장후 고정 정착되도록 하여 강결시키게 된다.
PRECAST ROCK SHED TUNNEL USING E FULLY INTEGRATED CONNECTION AND THE CONSTRUCTION METHOD THEREFOR
The present invention relates to a precast rock shed tunnel using a fully integrated connection and a construction method therefor, which are able to construct both abutment units, horizontally place a precast arch panel on an upper surface of the abutment units, and fully integrate them, thereby constructing the precast rock shed tunnel rapidly in a stable manner. The precast rock shed tunnel using the fully integrated connection comprises: both abutment units with vertical rod members, whose lower end is settled inside, placed on the upper surface and extended upward; a precast arch panel which includes an arch unit between both connection flanges which are penetrated by the vertical rod members; and a horizontal control jig unit between both the connection flanges and an upper surface of both the abutment units so that the precast arch panel can be horizontally placed on an upper surface of both the abutment units. A head unit of the vertical rod members is fixed on an upper surface of the connection flanges of the precast arch panel after tension, thereby being fully integrated.
양 교대부를 먼저 시공한 후, 교대부 상면에 프리캐스트 아치패널을 수평으로 세팅시킨 후, 강결시켜 피암터널을 신속하고, 안정적으로 시공하는 강결접합을 이용한 피암터널 및 그 시공방법에 관한 것으로서, 상기 강결접합을 이용한 피암터널은 상면에 하단이 내부에 정착된 수직봉부재가 상방으로 연장되도록 형성된 양 교대부: 상기 수직봉부재가 양 연결플랜지를 관통하며, 양 연결플랜지 사이의 아치부를 포함하는 프리캐스트 아치패널; 및 상기 양 연결플랜지와 양 교대부의 상면 사이에 설치되어 프리캐스트 아치패널가 양 교대부 상면에 수평으로 세팅하도록 설치된 수평조절지그대;를 포함하여, 상기 수직봉부재의 두부가 프리캐스트 아치패널의 연결플랜지 상면에 긴장후 고정 정착되도록 하여 강결시키게 된다.
PRECAST ROCK SHED TUNNEL USING E FULLY INTEGRATED CONNECTION AND THE CONSTRUCTION METHOD THEREFOR
강결접합을 이용한 피암터널 및 그 시공방법
KIM KI HYUN (Autor:in) / YU CHANG HEE (Autor:in)
21.07.2021
Patent
Elektronische Ressource
Koreanisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02D
FOUNDATIONS
,
Gründungen
/
E21D
SHAFTS
,
Schächte
PRECAST ROCK SHED TUNNEL AND THE CONSTRUCTION METHOD THEREFOR
Europäisches Patentamt | 2015
|Prototype Model Tests for Precast PC Rock-Shed Roofs+
British Library Conference Proceedings | 1996
|PRECAST BOX USING FINGER CONNECTION PLATE AND CONSTRUCTION METHOD THEREFOR
Europäisches Patentamt | 2016
|PRECAST BOX USING BENDED ANGLE CONNECTION PLATE AND CONSTRUCTION METHOD THEREFOR
Europäisches Patentamt | 2015
|PC PRECAST BOX USING FINGER CONNECTION PLATE AND CONSTRUCTION METHOD THEREFOR
Europäisches Patentamt | 2016