ASSEMBLING METHOD OF UNDERGROUND STRUCTURE AND UNDERGROUND STRUCTURE THEREBY
An embodiment of the present invention relates to a method for constructing an underground structure. The technical purpose is to provide the method for constructing the underground structure capable of easily press-fitting steel pipes and reducing a construction period and construction costs by installing small-diameter steel pipes underground first and installing large-diameter steel pipes and the underground structure constructed by the same. To achieve the same, the present invention includes: a first steel pipe press-fitting step of press-fitting multiple upper first steel pipes in a transverse direction in an upper part and press-fitting multiple lateral first steel pipes in both sides of the upper first steel pipes; a second steel pipe press-fitting step of press-fitting upper second steel pipes in an outer side of the upper first steel pipes and press-fitting lateral second steel pipes in an outer side of the lateral first steel pipes while allowing the lateral first steel pipes are positioned therein; a first steel pipe removing step of removing the upper first steel pipes inside the upper second steel pipes and removing the lateral second steel pipes inside the lateral second steel pipes; a reinforcing material installing step of installing a reinforcing material inside the upper second steel pipes and the lateral steel pipes; and a step of excavating soil in a region limited by the upper second steel pipes and the lateral second lateral pipes, installing aggregates and reinforcement in the upper second steel pipes and the lateral second steel pipes, and placing concrete.
본 발명의 일 실시예는 지하 구조물 축조 방법에 관한 것으로, 해결하고자 하는 기술적 과제는 지중에 소구경 강관을 선시공한 이후에 대구경 강관을 시공함으로써, 강관의 압입이 용이하고 시공 시간 및 비용을 절약할 수 있는 지하 구조물 축조 방법 및 이에 따른 지하 구조물을 제공하는데 있다. 이를 위해 본 발명은 상측에 횡 방향으로 다수의 상측 제1강관을 압입하고, 상기 상측 제1강관의 좌우 양측에 다수의 측벽 제1강관을 압입하는 제1강관 압입 단계; 상기 상측 제1강관이 내부에 위치하도록 하면서 상기 상측 제1강관의 외측에 상측 제2강관을 압입하고, 상기 측벽 제1강관이 내부에 위치하도록 하면서 상기 측벽 제1강관의 외측에 측벽 제2강관을 압입하는 제2강관 압입 단계; 상기 상측 제2강관 내부의 상기 상측 제1강관을 제거하고, 상기 측벽 제2강관 내부의 상기 측벽 제2강관을 제거하는 제1강관 제거 단계; 상기 상측 제2강관 및 측벽 제2강관의 내측에 보강재를 설치하는 보강재 설치 단계; 및, 상기 상측 제2강관 및 측벽 제2강관에 의해 정의되는 영역의 토사를 굴착하고, 상기 상측 제2강관 및 측벽 제2강관에 철골 및 철근을 설치하며, 콘크리트를 타설하는 단계로 이루어진 지하 구조물 축조 방법 및 이에 따른 지하 구조물을 개시한다.
ASSEMBLING METHOD OF UNDERGROUND STRUCTURE AND UNDERGROUND STRUCTURE THEREBY
An embodiment of the present invention relates to a method for constructing an underground structure. The technical purpose is to provide the method for constructing the underground structure capable of easily press-fitting steel pipes and reducing a construction period and construction costs by installing small-diameter steel pipes underground first and installing large-diameter steel pipes and the underground structure constructed by the same. To achieve the same, the present invention includes: a first steel pipe press-fitting step of press-fitting multiple upper first steel pipes in a transverse direction in an upper part and press-fitting multiple lateral first steel pipes in both sides of the upper first steel pipes; a second steel pipe press-fitting step of press-fitting upper second steel pipes in an outer side of the upper first steel pipes and press-fitting lateral second steel pipes in an outer side of the lateral first steel pipes while allowing the lateral first steel pipes are positioned therein; a first steel pipe removing step of removing the upper first steel pipes inside the upper second steel pipes and removing the lateral second steel pipes inside the lateral second steel pipes; a reinforcing material installing step of installing a reinforcing material inside the upper second steel pipes and the lateral steel pipes; and a step of excavating soil in a region limited by the upper second steel pipes and the lateral second lateral pipes, installing aggregates and reinforcement in the upper second steel pipes and the lateral second steel pipes, and placing concrete.
본 발명의 일 실시예는 지하 구조물 축조 방법에 관한 것으로, 해결하고자 하는 기술적 과제는 지중에 소구경 강관을 선시공한 이후에 대구경 강관을 시공함으로써, 강관의 압입이 용이하고 시공 시간 및 비용을 절약할 수 있는 지하 구조물 축조 방법 및 이에 따른 지하 구조물을 제공하는데 있다. 이를 위해 본 발명은 상측에 횡 방향으로 다수의 상측 제1강관을 압입하고, 상기 상측 제1강관의 좌우 양측에 다수의 측벽 제1강관을 압입하는 제1강관 압입 단계; 상기 상측 제1강관이 내부에 위치하도록 하면서 상기 상측 제1강관의 외측에 상측 제2강관을 압입하고, 상기 측벽 제1강관이 내부에 위치하도록 하면서 상기 측벽 제1강관의 외측에 측벽 제2강관을 압입하는 제2강관 압입 단계; 상기 상측 제2강관 내부의 상기 상측 제1강관을 제거하고, 상기 측벽 제2강관 내부의 상기 측벽 제2강관을 제거하는 제1강관 제거 단계; 상기 상측 제2강관 및 측벽 제2강관의 내측에 보강재를 설치하는 보강재 설치 단계; 및, 상기 상측 제2강관 및 측벽 제2강관에 의해 정의되는 영역의 토사를 굴착하고, 상기 상측 제2강관 및 측벽 제2강관에 철골 및 철근을 설치하며, 콘크리트를 타설하는 단계로 이루어진 지하 구조물 축조 방법 및 이에 따른 지하 구조물을 개시한다.
ASSEMBLING METHOD OF UNDERGROUND STRUCTURE AND UNDERGROUND STRUCTURE THEREBY
지하 구조물 축조 방법 및 이에 따른 지하 구조물
SONG KWAN KWON (Autor:in)
19.09.2016
Patent
Elektronische Ressource
Koreanisch
PC UNDERGROUND STRUCTURE ASSEMBLED BY PRECAST CONCRETE STRUCTURE AND CONSTRUCTION METHOD THEREBY
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|