Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD OF MANUFACTURING COMPOSITE GIRDER FOR BRIDGE
The present invention relates to a method of manufacturing a steel composite girder for a bridge. More specifically, the method of manufacturing a steel composite girder for the bridge, comprises: a step of holding a steel girder wherein both end parts of the steel girder are supported by two parts of a first position in a cantilever beam form, and positioned on a central part of the girder to protrude upwards; a step of installing a sheath tube wherein the sheath tube to install a tendon is installed in a lower edge of a neutral shaft of the steel girder; a step of installing a mold wherein the mold to deposit concrete in a form of covering the lower edge of a neutral shaft of the steel girder is installed; a step of compounding concrete wherein casing concrete is compounded to the lower edge of the neutral shaft of the steel girder to form a steel composite girder; a step of piling steel composite girders wherein the steel composite girders are piled up to being held by a bridge; and a step of introducing prestress wherein a fixed amount of compression prestress is introduced to the casing concrete by settling a tendon installed in the sheath tube when reaching a holding point of the bridge. Accordingly, the present invention provides the method of economically and efficiently manufacturing a steel composite girder by preventing creep loss of compression prestress introduced during a piling period, and reducing an amount of steel used by minimizing a load withstood by a steel composite girder.
본 발명은 교량용 강합성 거더의 제작 방법에 관한 것으로, 보다 구체적으로는, 강재 거더의 양단부가 내민보 형태로 제1위치의 2군데에서 지지되어 거더 중앙부가 상방으로 볼록하게 위치시키는 강재거더 거치단계와; 상기 강재 거더의 중립축 하연에 긴장재 설치를 위한 쉬스관을 설치하는 쉬스관 설치단계와; 상기 강재 거더의 중립축 하연을 감싸는 형태로 콘크리트를 타설하기 위한 거푸집을 설치하는 거푸집 설치단계와; 상기 강재 거더의 중립축 하연에 케이싱 콘크리트를 합성하여 강합성 거더를 형성하는 콘크리트 합성단계와; 교량에 거치시키는 시점까지 상기 강합성 거더를 적치시키는 강합성거더 적치단계와; 상기 교량의 거치 시점에 도달하면, 상기 쉬스관에 설치된 긴장재를 긴장 정착하여 상기 케이싱 콘크리트에 정해진 양의 압축 프리스트레스를 도입하는 프리스트레스 도입단계를; 포함하여 구성되어, 적치 기간 중에 도입된 압축 프리스트레스가 크리프 손실되는 것을 방지하면서, 강재 거더가 부담하는 하중을 최소화하여 강재 사용량을 줄여 경제성있고 효율적인 강합성 거더를 제작하는 방법을 제공한다.
METHOD OF MANUFACTURING COMPOSITE GIRDER FOR BRIDGE
The present invention relates to a method of manufacturing a steel composite girder for a bridge. More specifically, the method of manufacturing a steel composite girder for the bridge, comprises: a step of holding a steel girder wherein both end parts of the steel girder are supported by two parts of a first position in a cantilever beam form, and positioned on a central part of the girder to protrude upwards; a step of installing a sheath tube wherein the sheath tube to install a tendon is installed in a lower edge of a neutral shaft of the steel girder; a step of installing a mold wherein the mold to deposit concrete in a form of covering the lower edge of a neutral shaft of the steel girder is installed; a step of compounding concrete wherein casing concrete is compounded to the lower edge of the neutral shaft of the steel girder to form a steel composite girder; a step of piling steel composite girders wherein the steel composite girders are piled up to being held by a bridge; and a step of introducing prestress wherein a fixed amount of compression prestress is introduced to the casing concrete by settling a tendon installed in the sheath tube when reaching a holding point of the bridge. Accordingly, the present invention provides the method of economically and efficiently manufacturing a steel composite girder by preventing creep loss of compression prestress introduced during a piling period, and reducing an amount of steel used by minimizing a load withstood by a steel composite girder.
본 발명은 교량용 강합성 거더의 제작 방법에 관한 것으로, 보다 구체적으로는, 강재 거더의 양단부가 내민보 형태로 제1위치의 2군데에서 지지되어 거더 중앙부가 상방으로 볼록하게 위치시키는 강재거더 거치단계와; 상기 강재 거더의 중립축 하연에 긴장재 설치를 위한 쉬스관을 설치하는 쉬스관 설치단계와; 상기 강재 거더의 중립축 하연을 감싸는 형태로 콘크리트를 타설하기 위한 거푸집을 설치하는 거푸집 설치단계와; 상기 강재 거더의 중립축 하연에 케이싱 콘크리트를 합성하여 강합성 거더를 형성하는 콘크리트 합성단계와; 교량에 거치시키는 시점까지 상기 강합성 거더를 적치시키는 강합성거더 적치단계와; 상기 교량의 거치 시점에 도달하면, 상기 쉬스관에 설치된 긴장재를 긴장 정착하여 상기 케이싱 콘크리트에 정해진 양의 압축 프리스트레스를 도입하는 프리스트레스 도입단계를; 포함하여 구성되어, 적치 기간 중에 도입된 압축 프리스트레스가 크리프 손실되는 것을 방지하면서, 강재 거더가 부담하는 하중을 최소화하여 강재 사용량을 줄여 경제성있고 효율적인 강합성 거더를 제작하는 방법을 제공한다.
METHOD OF MANUFACTURING COMPOSITE GIRDER FOR BRIDGE
교량용 강합성 거더의 제작 방법
JANG JEONG HWAN (Autor:in)
12.10.2016
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
Construction method of girder composite rahmen bridge and Girder composite rahmen bridge
Europäisches Patentamt | 2019
|COMPOSITE GIRDER FOR BRIDGE AND MANUFACTURING METHOD THEREOF
Europäisches Patentamt | 2019
|DESIGN METHOD FOR SPC COMPOSITE GIRDER BRIDGE AND THE GIRDER BRIDGE
Europäisches Patentamt | 2016
|Steel box girder bridge and manufacturing method of steel box girder bridge
Europäisches Patentamt | 2021
|