Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD OF MANUFACTURING COMPOSITE GIRDER FOR BRIDGE
The present invention relates to a method of manufacturing a girder for a bridge, comprising: a steel girder preparation step to prepare a steel girder which has an incision unit formed on an upper side; a steel girder holding step to hold the steel girder by overturning the steel girder by 180 degrees to be supported on both ends with the incision unit placed on a lower side; and an engagement member engaging step to engage an engagement member with the incision unit of the steel girder. The steel girder is installed on the bridge with the engagement member placed on an upper side, and a compression prestress is introduced on a lower surface of the steel girder in the central part of a span central unit, thereby offsetting the tensile stress applied during common use. A tensile prestress is introduced on the upper surface of the steel girder on the span central unit, thereby offsetting the compression stress applied during common use and realizing a higher load carrying capacity.
본 발명은 교량용 거더의 제작 방법에 관한 것으로, 상부에 절개부가 형성된 강재거더를 준비하는 강재거더 준비단계와; 상기 강재 거더를 180도 뒤집혀 상기 절개부가 하측에 위치한 자세로 양단지지되게 상기 강재거더를 거치시키는 강재거더 거치단계와; 상기 강재 거더의 상기 절개부에 결합 부재를 결합하는 결합부재 결합단계를; 포함하고, 상기 결합 부재가 상측에 위치한 자세로 교량에 설치되어, 경간 중앙부의 강재 거더 하연에서는 압축 프리스트레스가 도입되어 공용 중 작용하는 인장 응력을 상쇄시키고, 경간 중앙부의 강재 거더 상연에서는 인장 프리스트레스가 도입되어 공용 중 작용하는 압축 응력을 상쇄시켜, 보다 높은 내하 능력을 구현하는 교량용 거더의 제작 방법을 제공한다.
METHOD OF MANUFACTURING COMPOSITE GIRDER FOR BRIDGE
The present invention relates to a method of manufacturing a girder for a bridge, comprising: a steel girder preparation step to prepare a steel girder which has an incision unit formed on an upper side; a steel girder holding step to hold the steel girder by overturning the steel girder by 180 degrees to be supported on both ends with the incision unit placed on a lower side; and an engagement member engaging step to engage an engagement member with the incision unit of the steel girder. The steel girder is installed on the bridge with the engagement member placed on an upper side, and a compression prestress is introduced on a lower surface of the steel girder in the central part of a span central unit, thereby offsetting the tensile stress applied during common use. A tensile prestress is introduced on the upper surface of the steel girder on the span central unit, thereby offsetting the compression stress applied during common use and realizing a higher load carrying capacity.
본 발명은 교량용 거더의 제작 방법에 관한 것으로, 상부에 절개부가 형성된 강재거더를 준비하는 강재거더 준비단계와; 상기 강재 거더를 180도 뒤집혀 상기 절개부가 하측에 위치한 자세로 양단지지되게 상기 강재거더를 거치시키는 강재거더 거치단계와; 상기 강재 거더의 상기 절개부에 결합 부재를 결합하는 결합부재 결합단계를; 포함하고, 상기 결합 부재가 상측에 위치한 자세로 교량에 설치되어, 경간 중앙부의 강재 거더 하연에서는 압축 프리스트레스가 도입되어 공용 중 작용하는 인장 응력을 상쇄시키고, 경간 중앙부의 강재 거더 상연에서는 인장 프리스트레스가 도입되어 공용 중 작용하는 압축 응력을 상쇄시켜, 보다 높은 내하 능력을 구현하는 교량용 거더의 제작 방법을 제공한다.
METHOD OF MANUFACTURING COMPOSITE GIRDER FOR BRIDGE
교량용 거더의 제작 방법
HWANG JAE GON (Autor:in) / YUN MYEONG HO (Autor:in)
29.12.2020
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
Construction method of girder composite rahmen bridge and Girder composite rahmen bridge
Europäisches Patentamt | 2019
|COMPOSITE GIRDER FOR BRIDGE AND MANUFACTURING METHOD THEREOF
Europäisches Patentamt | 2019
|DESIGN METHOD FOR SPC COMPOSITE GIRDER BRIDGE AND THE GIRDER BRIDGE
Europäisches Patentamt | 2016
|Steel box girder bridge and manufacturing method of steel box girder bridge
Europäisches Patentamt | 2021
|