PHC Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
The present invention provides a method of constructing an earth retaining and permanent wall using a pre-stressed high-strength concrete (PHC) pile and a steel pile together such that a concrete placing works for stable performance when constructing a wall. According to a preferred embodiment of the present invention, the method of constructing the earth retaining and permanent wall using the PHC pile and the steel pile together comprises: (a) a step of repeatedly embedding at least two PHC piles and one steel pile into each perforated hole in a perforated arrangement direction after perforating the hole in the ground and cutting and arranging each head part of the piles; (b) a step of performing grouting with a waterproof material (18) to install the waterproof material on a retaining wall; (c) a step of placing front end connection materials, which are also used as a furring strip supporter having each furring strip installed in a corresponding position per predetermined height, and connecting a strut to a corresponding furring strip; (d) a step of constructing a bottom slab by placing concrete on a bottom surface of an excavated part to have a predetermined thickness; (e) a step of holding a flat tie holder by each of an upper and lower front end connection materials as a furring strip supporter to horizontally be installed to vertically be arranged; (f) a step of installing a mold for a wall; (g) a step of installing a wall; (h) a step of repeating steps (e), (f), and (g) sequentially in an upper direction to construct a permanent wall of an underground structure.
본 발명은 경제적인 영구 벽체의 시공이 가능하고, 강관 파일과 콘크리트 벽체와의 합성력을 높이고, 별도의 띠장브라켓의 설치가 불필요하며, 벽체의 시공시 안정된 콘크리트의 타설 시공이 가능하도록 한 PHC 파일과 강관 파일을 혼용한 흙막이 겸 영구벽체의 시공 방법을 제공한다. 본 발명의 적절한 실시 형태에 따르면, (a) 흙막이 벽체가 형성될 위치에 일정 깊이로 지반에 천공을 실시한 후 각 천공홀에 2개 이상의 PHC 파일과 1개의 강관 파일을 천공 배열 방향을 따라 반복하여가면서 근입시켜 놓고 각 두부를 절단 정리하는 단계와; (b) PHC 파일과 강관 파일이 연접되어 있는 배면에서부터 전면까지 차수재(18)로 그라우팅을 실시하여 흙막이 벽체에 차수를 시공하는 단계와; (c) 터파기의 목표 깊이 도달까지 PHC 파일과 강관 파일의 전면에서 단계 굴착을 하방으로 반복 실시하면서 각 굴착 단계마다 강관 파일에 일정 간격을 두고 띠장받침겸용 전단연결재를 설치하면서, 설정된 높이의 위치마다 띠장을 해당 위치에 설치된 띠장받침겸용 전단연결재에 거치시켜 놓고 스트러트를 해당 띠장에 연결시켜 놓는 단계와; (d) 터파기의 바닥면에 일정한 두께로 콘크리트를 타설하여 바닥 슬래브를 시공하는 단계와; (e) 플랫타이 거치대를 상,하측의 띠장받침겸용 전단연결재에 각기 거치하여 상하로 나란하게 수평적으로 설치하는 단계와; (f) 흙막이 벽체로부터 일정 간격을 두고 벽체 거푸집을 바닥 슬래브에서 수직 배치한 후 플랫타이를 매개로 벽체 거푸집을 플랫타이 거치대에 지지시켜 벽체 거푸집을 설치하는 단계와; (g) 벽체 거푸집과 흙막이 벽체의 사이에 철근 배근과 콘크리트를 타설하여 벽체를 시공하는 단계와; (h) 해당 타설구간에 위치하는 스트러트와 띠장을 제거해가면서 지하 높이까지 상기 (e),(f),(g)단계를 상방으로 순차적으로 반복하여 지하 구조물의 영구벽체를 구축하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
PHC Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
The present invention provides a method of constructing an earth retaining and permanent wall using a pre-stressed high-strength concrete (PHC) pile and a steel pile together such that a concrete placing works for stable performance when constructing a wall. According to a preferred embodiment of the present invention, the method of constructing the earth retaining and permanent wall using the PHC pile and the steel pile together comprises: (a) a step of repeatedly embedding at least two PHC piles and one steel pile into each perforated hole in a perforated arrangement direction after perforating the hole in the ground and cutting and arranging each head part of the piles; (b) a step of performing grouting with a waterproof material (18) to install the waterproof material on a retaining wall; (c) a step of placing front end connection materials, which are also used as a furring strip supporter having each furring strip installed in a corresponding position per predetermined height, and connecting a strut to a corresponding furring strip; (d) a step of constructing a bottom slab by placing concrete on a bottom surface of an excavated part to have a predetermined thickness; (e) a step of holding a flat tie holder by each of an upper and lower front end connection materials as a furring strip supporter to horizontally be installed to vertically be arranged; (f) a step of installing a mold for a wall; (g) a step of installing a wall; (h) a step of repeating steps (e), (f), and (g) sequentially in an upper direction to construct a permanent wall of an underground structure.
본 발명은 경제적인 영구 벽체의 시공이 가능하고, 강관 파일과 콘크리트 벽체와의 합성력을 높이고, 별도의 띠장브라켓의 설치가 불필요하며, 벽체의 시공시 안정된 콘크리트의 타설 시공이 가능하도록 한 PHC 파일과 강관 파일을 혼용한 흙막이 겸 영구벽체의 시공 방법을 제공한다. 본 발명의 적절한 실시 형태에 따르면, (a) 흙막이 벽체가 형성될 위치에 일정 깊이로 지반에 천공을 실시한 후 각 천공홀에 2개 이상의 PHC 파일과 1개의 강관 파일을 천공 배열 방향을 따라 반복하여가면서 근입시켜 놓고 각 두부를 절단 정리하는 단계와; (b) PHC 파일과 강관 파일이 연접되어 있는 배면에서부터 전면까지 차수재(18)로 그라우팅을 실시하여 흙막이 벽체에 차수를 시공하는 단계와; (c) 터파기의 목표 깊이 도달까지 PHC 파일과 강관 파일의 전면에서 단계 굴착을 하방으로 반복 실시하면서 각 굴착 단계마다 강관 파일에 일정 간격을 두고 띠장받침겸용 전단연결재를 설치하면서, 설정된 높이의 위치마다 띠장을 해당 위치에 설치된 띠장받침겸용 전단연결재에 거치시켜 놓고 스트러트를 해당 띠장에 연결시켜 놓는 단계와; (d) 터파기의 바닥면에 일정한 두께로 콘크리트를 타설하여 바닥 슬래브를 시공하는 단계와; (e) 플랫타이 거치대를 상,하측의 띠장받침겸용 전단연결재에 각기 거치하여 상하로 나란하게 수평적으로 설치하는 단계와; (f) 흙막이 벽체로부터 일정 간격을 두고 벽체 거푸집을 바닥 슬래브에서 수직 배치한 후 플랫타이를 매개로 벽체 거푸집을 플랫타이 거치대에 지지시켜 벽체 거푸집을 설치하는 단계와; (g) 벽체 거푸집과 흙막이 벽체의 사이에 철근 배근과 콘크리트를 타설하여 벽체를 시공하는 단계와; (h) 해당 타설구간에 위치하는 스트러트와 띠장을 제거해가면서 지하 높이까지 상기 (e),(f),(g)단계를 상방으로 순차적으로 반복하여 지하 구조물의 영구벽체를 구축하는 단계;를 포함하여 시공되는 것을 특징으로 한다.
PHC Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
PHC 파일과 강관 파일을 혼용한 흙막이 겸 영구벽체의 시공 방법
JANG DONG WOON (Autor:in) / KIM UI YONG (Autor:in)
02.11.2017
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
PHC Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
Europäisches Patentamt | 2017
|PHC Construction method of permanent wall with retaining wall combined PHC pile
Europäisches Patentamt | 2020
|Row pile retaining wall with permanent retaining structure and construction method
Europäisches Patentamt | 2021
|Combined pile joist retaining wall and construction method
Europäisches Patentamt | 2022
|Grouting soil retaining steel plate for steel pipe pile retaining wall
Europäisches Patentamt | 2022
|