Rock Excavation Method in Tunnel
The present invention relates to a rock excavation method in a tunnel for tunnel construction. An object of the present invention is to reduce a construction time by dividing a tunnel into several sections for construction, and dividing into an upper portion and a lower portion for construction while dividing the lower portion into left and right sections to perform construction in an alternative manner. To this end, the present invention comprises: a first step of excavating and removing the upper portion of the tunnel rock; and a second step of excavating and removing the lower portion of the tunnel rock, wherein the second step is implemented after implementing the first step, and the second step is performed at a distance (D) back from the first step not to interfere operation of the first step while the first step is being processed.
본 발명은 터널 공사를 위하여 터널 암반을 굴착하는 방법에 관한 것으로서, 터널을 여러 구간으로 나누어 시공하고, 상반부와 하반부를 구분하여 시공함과 동시에, 하반부를 좌우로 분할하여 교대로 시공할 수 있도록 하여 공사기간을 단축하는 데 그 목적이 있다. 이를 위하여 본 발명은, 터널 암반의 상반부를 굴착하여 제거하는 제1단계와; 터널 암반의 하반부를 굴착하여 제거하는 제2단계;를 구분하여 시공하고, 상기 제1단계를 수행한 후 제2단계를 수행하되, 상기 제2단계는 상기 제1단계의 작업에 지장을 주지 않는 거리(D)의 후방에서 상기 제1단계와 병행하여 진행하는 것을 특징으로 한다.
Rock Excavation Method in Tunnel
The present invention relates to a rock excavation method in a tunnel for tunnel construction. An object of the present invention is to reduce a construction time by dividing a tunnel into several sections for construction, and dividing into an upper portion and a lower portion for construction while dividing the lower portion into left and right sections to perform construction in an alternative manner. To this end, the present invention comprises: a first step of excavating and removing the upper portion of the tunnel rock; and a second step of excavating and removing the lower portion of the tunnel rock, wherein the second step is implemented after implementing the first step, and the second step is performed at a distance (D) back from the first step not to interfere operation of the first step while the first step is being processed.
본 발명은 터널 공사를 위하여 터널 암반을 굴착하는 방법에 관한 것으로서, 터널을 여러 구간으로 나누어 시공하고, 상반부와 하반부를 구분하여 시공함과 동시에, 하반부를 좌우로 분할하여 교대로 시공할 수 있도록 하여 공사기간을 단축하는 데 그 목적이 있다. 이를 위하여 본 발명은, 터널 암반의 상반부를 굴착하여 제거하는 제1단계와; 터널 암반의 하반부를 굴착하여 제거하는 제2단계;를 구분하여 시공하고, 상기 제1단계를 수행한 후 제2단계를 수행하되, 상기 제2단계는 상기 제1단계의 작업에 지장을 주지 않는 거리(D)의 후방에서 상기 제1단계와 병행하여 진행하는 것을 특징으로 한다.
Rock Excavation Method in Tunnel
터널 암반 굴착방법
SON JAE HO (Autor:in) / CHOI KYU DON (Autor:in) / CHO KYUNG OCK (Autor:in) / CHOI JUNG OK (Autor:in)
08.02.2018
Patent
Elektronische Ressource
Koreanisch
Rock excavation for a waterworks tunnel
Engineering Index Backfile | 1927
|Underwater rock plug pilot tunnel excavation construction method
Europäisches Patentamt | 2023
|A private sewer tunnel in rock excavation
Engineering Index Backfile | 1908
UDEC Modeling on rock tunnel excavation and supports
British Library Conference Proceedings | 2001
|Choice of rock excavation method for tramway tunnel in Zurich