Method for ground drilling and reinforcement construction and device thereof
The present invention provides a method and an apparatus for ground excavation and reinforcement construction, in which the ground excavation and the reinforcement construction can be progressed sequentially and continuously and a relatively large amount of reinforcement materials can be supplied at a time into an excavated hole during the reinforcement construction process. The method for ground excavation and reinforcement construction according to the present invention includes the steps of: combining an excavation rod configured to simultaneously or sequentially supply one or at least two of air, water and mortar to a front device for ground excavation and reinforcement construction; performing the ground excavation through a hammer coupled to one end of the front device based on supply pressure of air or water supplied to the front device through the excavation rod in a state in which a valve module of the front device is opened; stopping the supply of air or water to the front device after completion of the ground excavation and switching the valve module of the front device into a closed state; and filling the excavated hole, in which the mortar is supplied to the front device through the excavation rod while the excavation rod and the front end device gradually escape from the excavated hole, and the mortar supplied to the front device is blocked by the closed valve module, so that the mortar is discharged through a bypass discharge hole formed through a lateral side of the front device, thereby filling the excavated hole.
본 발명은 지반 굴착 및 보강 시공의 과정이 순차적인 동시에 연속적으로 진행될 수 있는 동시에 보강 시공 과정에서 비교적 다량의 보강 재료를 굴착된 구멍 내로 일시에 공급될 수 있게 하는 지반 굴착 및 보강 시공 방법 및 그 장치에 관한 것으로서, 본 발명에 따른 지반 굴착 및 보강 시공 방법은, 지반의 굴착 및 보강 시공을 위한 선단장치에 에어, 물 및 모르타르 중 어느 하나 또는 둘 이상의 동시 내지 순차적 공급을 위한 굴착로드가 결합되는 단계와, 상기 선단장치의 밸브 모듈이 개방된 상태에서 상기 굴착로드를 통해 상기 선단장치에 에어 또는 물이 공급되면서 그 공급 압력을 기반으로 상기 선단장치의 일단에 결합된 해머를 통해 지반 굴착이 이루어지는 단계와, 지반 굴착의 완료 후 상기 선단장치에 대한 에어 또는 물 공급이 중지되고 상기 선단장치의 밸브 모듈이 폐쇄 상태로 전환되는 단계와, 상기 굴착로드 및 선단장치가 굴착된 구멍으로부터 점진적으로 빠져나오면서 상기 굴착로드를 통해 상기 선단장치에 모르타르가 공급되어 상기 선단장치에 공급되는 모르타르는 폐쇄된 상기 밸브 모듈에 막혀 상기 선단장치의 측면에 관통된 우회 배출홀을 통해 배출되면서 굴착된 구멍을 메우는 단계를 포함할 수 있다.
Method for ground drilling and reinforcement construction and device thereof
The present invention provides a method and an apparatus for ground excavation and reinforcement construction, in which the ground excavation and the reinforcement construction can be progressed sequentially and continuously and a relatively large amount of reinforcement materials can be supplied at a time into an excavated hole during the reinforcement construction process. The method for ground excavation and reinforcement construction according to the present invention includes the steps of: combining an excavation rod configured to simultaneously or sequentially supply one or at least two of air, water and mortar to a front device for ground excavation and reinforcement construction; performing the ground excavation through a hammer coupled to one end of the front device based on supply pressure of air or water supplied to the front device through the excavation rod in a state in which a valve module of the front device is opened; stopping the supply of air or water to the front device after completion of the ground excavation and switching the valve module of the front device into a closed state; and filling the excavated hole, in which the mortar is supplied to the front device through the excavation rod while the excavation rod and the front end device gradually escape from the excavated hole, and the mortar supplied to the front device is blocked by the closed valve module, so that the mortar is discharged through a bypass discharge hole formed through a lateral side of the front device, thereby filling the excavated hole.
본 발명은 지반 굴착 및 보강 시공의 과정이 순차적인 동시에 연속적으로 진행될 수 있는 동시에 보강 시공 과정에서 비교적 다량의 보강 재료를 굴착된 구멍 내로 일시에 공급될 수 있게 하는 지반 굴착 및 보강 시공 방법 및 그 장치에 관한 것으로서, 본 발명에 따른 지반 굴착 및 보강 시공 방법은, 지반의 굴착 및 보강 시공을 위한 선단장치에 에어, 물 및 모르타르 중 어느 하나 또는 둘 이상의 동시 내지 순차적 공급을 위한 굴착로드가 결합되는 단계와, 상기 선단장치의 밸브 모듈이 개방된 상태에서 상기 굴착로드를 통해 상기 선단장치에 에어 또는 물이 공급되면서 그 공급 압력을 기반으로 상기 선단장치의 일단에 결합된 해머를 통해 지반 굴착이 이루어지는 단계와, 지반 굴착의 완료 후 상기 선단장치에 대한 에어 또는 물 공급이 중지되고 상기 선단장치의 밸브 모듈이 폐쇄 상태로 전환되는 단계와, 상기 굴착로드 및 선단장치가 굴착된 구멍으로부터 점진적으로 빠져나오면서 상기 굴착로드를 통해 상기 선단장치에 모르타르가 공급되어 상기 선단장치에 공급되는 모르타르는 폐쇄된 상기 밸브 모듈에 막혀 상기 선단장치의 측면에 관통된 우회 배출홀을 통해 배출되면서 굴착된 구멍을 메우는 단계를 포함할 수 있다.
Method for ground drilling and reinforcement construction and device thereof
지반 굴착 및 보강 시공 방법 및 그 장치
WON YONG MUN (Autor:in) / HWANG GYEONG HUI (Autor:in) / WON SEONG JIN (Autor:in)
21.05.2018
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Method for ground drilling and reinforcement construction and device thereof
Europäisches Patentamt | 2018
|Soft ground reinforcement method using ground drilling device and reinforcement device
Europäisches Patentamt | 2019
|Lower Auger with Vibrator and Construction Method of Drilling and Ground Reinforcement Thereof
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2020
|