Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE WALL
The present invention relates to a method for constructing a wall body of an underground structure, and more specifically, to a method for constructing a wall body of an underground structure which can construct a wall body of an underground structure, such as an underpass, by continuously installing a plurality of panels under the ground. The method for constructing a wall body of an underground structure is a method for constructing a wall body of an underground structure by continuously installing a plurality of panels having a first panel and a second panel under the ground, and includes the steps of: forming guide members on the ground surface to be spaced apart from each other; forming an insertion hole downwardly between the spaced guide members; installing a start reference pile having a first gradient measuring sensor into the insertion hole in order to measure verticality; adjusting verticality of the start reference pile using the first gradient measuring sensor; inserting the first panel into the insertion hole by combining the first panel with the start reference pile; inserting the second panel into the insertion hole by connecting the second panel to the first panel; connecting the plurality of second panels with each other and combining the second panel with an end reference pile to be inserted into the insertion hole; and pouring concrete into the insertion hole to fix the first panel and the second panel inserted into the insertion hole under the ground.
본 발명은 지하구조물 벽체의 시공방법에 관한 것으로서, 특히 다수개의 패널을 지중에 연속으로 설치하여 지하차도 등의 지하구조물 벽체를 시공하는 지하구조물 벽체의 시공방법에 관한 것이다. 본 발명의 지하구조물 벽체의 시공방법은, 제1패널과 제2패널로 이루어진 다수개의 패널을 지중에 연속으로 설치하여 지하구조물의 벽체를 시공하는 방법에 있어서, 지면에 상호 이격된 안내부재를 형성하는 단계와; 상호 이격되어 있는 상기 안내부재 사이에 하방향으로 근입공을 형성하는 단계와; 상기 근입공에 수직도를 측정하는 제1경사측정센서가 장착된 스타트기준파일을 설치하는 단계와; 상기 제1경사측정센서를 이용하여 상기 스타트기준파일의 수직도를 조절하는 단계와; 상기 제1패널을 상기 스타트기준파일에 결합시켜 상기 근입공에 삽입하는 단계와; 상기 제2패널을 상기 제1패널에 연결하여 상기 근입공에 삽입하는 단계와; 다수개의 상기 제2패널을 서로 연결하여 설치한 후 마지막 상기 제2패널에 엔드기준파일을 결합시켜 상기 근입공에 삽입하는 단계와; 상기 근입공에 콘크리트를 타설하여 상기 근입공에 삽입되어 있는 상기 제1패널 및 제2패널을 지중에 고정시키는 단계;를 포함하여 이루어진 것을 특징으로 한다.
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE WALL
The present invention relates to a method for constructing a wall body of an underground structure, and more specifically, to a method for constructing a wall body of an underground structure which can construct a wall body of an underground structure, such as an underpass, by continuously installing a plurality of panels under the ground. The method for constructing a wall body of an underground structure is a method for constructing a wall body of an underground structure by continuously installing a plurality of panels having a first panel and a second panel under the ground, and includes the steps of: forming guide members on the ground surface to be spaced apart from each other; forming an insertion hole downwardly between the spaced guide members; installing a start reference pile having a first gradient measuring sensor into the insertion hole in order to measure verticality; adjusting verticality of the start reference pile using the first gradient measuring sensor; inserting the first panel into the insertion hole by combining the first panel with the start reference pile; inserting the second panel into the insertion hole by connecting the second panel to the first panel; connecting the plurality of second panels with each other and combining the second panel with an end reference pile to be inserted into the insertion hole; and pouring concrete into the insertion hole to fix the first panel and the second panel inserted into the insertion hole under the ground.
본 발명은 지하구조물 벽체의 시공방법에 관한 것으로서, 특히 다수개의 패널을 지중에 연속으로 설치하여 지하차도 등의 지하구조물 벽체를 시공하는 지하구조물 벽체의 시공방법에 관한 것이다. 본 발명의 지하구조물 벽체의 시공방법은, 제1패널과 제2패널로 이루어진 다수개의 패널을 지중에 연속으로 설치하여 지하구조물의 벽체를 시공하는 방법에 있어서, 지면에 상호 이격된 안내부재를 형성하는 단계와; 상호 이격되어 있는 상기 안내부재 사이에 하방향으로 근입공을 형성하는 단계와; 상기 근입공에 수직도를 측정하는 제1경사측정센서가 장착된 스타트기준파일을 설치하는 단계와; 상기 제1경사측정센서를 이용하여 상기 스타트기준파일의 수직도를 조절하는 단계와; 상기 제1패널을 상기 스타트기준파일에 결합시켜 상기 근입공에 삽입하는 단계와; 상기 제2패널을 상기 제1패널에 연결하여 상기 근입공에 삽입하는 단계와; 다수개의 상기 제2패널을 서로 연결하여 설치한 후 마지막 상기 제2패널에 엔드기준파일을 결합시켜 상기 근입공에 삽입하는 단계와; 상기 근입공에 콘크리트를 타설하여 상기 근입공에 삽입되어 있는 상기 제1패널 및 제2패널을 지중에 고정시키는 단계;를 포함하여 이루어진 것을 특징으로 한다.
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE WALL
지하구조물 벽체의 시공방법
YOON HAK SU (Autor:in)
26.03.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE WALL AND UNDERGROUND STRUCTURE
Europäisches Patentamt | 2018
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|