CONSTRUCTING METHOD AND APPARATUS FOR PRE-TENSION MICRO PILE
The present invention relates to a construction method and an apparatus for pre-tensioning a micropile and, more specifically, to a construction method and an apparatus for pre-tensioning a micropile which can maximize tensile force by filling/hardening grouting after tensioning a pile, namely a steel bar installed on the ground. The construction method for pre-tensioning a micropile comprises: a step of forming a bore hole on the ground; a step of inserting a steel bar with an expansion member mounted on a lower portion thereof into the bore hole; a step where the expansion member infiltrates into an inner wall of the bore hole to be fixed while deploying outwards; a step of holding and tensioning an upper portion of the steel bar and then fixing the upper portion of the steel bar; and a step of filling grouting in the bore hole. The steel bar is tensioned before the grouting is filled, and the grouting is filled in the bore hole to be hardened while the steel bar is tensioned.
본 발명은 마이크로파일의 선(先)인장 시공방법 및 선(先)인장 장치에 관한 것으로서, 특히 지면에 설치된 파일 즉 강봉을 먼저 인장시킨 후 그라우팅재를 충진/경화시켜 인장력을 극대화할 수 있는 마이크로파일의 선(先)인장 시공방법 및 선(先)인장 장치에 관한 것이다. 본 발명의 마이크로파일의 선(先)인장 시공방법은, 지면에 천공홀을 형성하는 단계와; 하부에 확장부재가 장착된 강봉을 상기 천공홀에 삽입하는 단계와; 상기 확장부재가 외측방향으로 전개되면서 상기 천공홀의 내벽에 침투되어 고정되도록 하는 단계와; 상기 강봉의 상부를 잡아 인장시킨 후 고정시키는 단계와; 상기 천공홀에 그라우팅재를 충진하는 단계;를 포함하여 이루어지되, 상기 강봉은 상기 그라우팅재의 충진 이전에 인장되고, 상기 강봉이 인장된 상태에서 상기 그라우팅재가 상기 천공홀에 충진되어 경화되는 것을 특징으로 한다.
CONSTRUCTING METHOD AND APPARATUS FOR PRE-TENSION MICRO PILE
The present invention relates to a construction method and an apparatus for pre-tensioning a micropile and, more specifically, to a construction method and an apparatus for pre-tensioning a micropile which can maximize tensile force by filling/hardening grouting after tensioning a pile, namely a steel bar installed on the ground. The construction method for pre-tensioning a micropile comprises: a step of forming a bore hole on the ground; a step of inserting a steel bar with an expansion member mounted on a lower portion thereof into the bore hole; a step where the expansion member infiltrates into an inner wall of the bore hole to be fixed while deploying outwards; a step of holding and tensioning an upper portion of the steel bar and then fixing the upper portion of the steel bar; and a step of filling grouting in the bore hole. The steel bar is tensioned before the grouting is filled, and the grouting is filled in the bore hole to be hardened while the steel bar is tensioned.
본 발명은 마이크로파일의 선(先)인장 시공방법 및 선(先)인장 장치에 관한 것으로서, 특히 지면에 설치된 파일 즉 강봉을 먼저 인장시킨 후 그라우팅재를 충진/경화시켜 인장력을 극대화할 수 있는 마이크로파일의 선(先)인장 시공방법 및 선(先)인장 장치에 관한 것이다. 본 발명의 마이크로파일의 선(先)인장 시공방법은, 지면에 천공홀을 형성하는 단계와; 하부에 확장부재가 장착된 강봉을 상기 천공홀에 삽입하는 단계와; 상기 확장부재가 외측방향으로 전개되면서 상기 천공홀의 내벽에 침투되어 고정되도록 하는 단계와; 상기 강봉의 상부를 잡아 인장시킨 후 고정시키는 단계와; 상기 천공홀에 그라우팅재를 충진하는 단계;를 포함하여 이루어지되, 상기 강봉은 상기 그라우팅재의 충진 이전에 인장되고, 상기 강봉이 인장된 상태에서 상기 그라우팅재가 상기 천공홀에 충진되어 경화되는 것을 특징으로 한다.
CONSTRUCTING METHOD AND APPARATUS FOR PRE-TENSION MICRO PILE
마이크로파일의 선인장 장치
YOON HAK SU (Autor:in)
31.05.2019
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Micro pile assembly and micro pile constructing method using the same