BEARING FOR TRUSS GIRDER AND BRIDGE CONSTRUCTION METHOD THEREOF
A steel pipe truss girder support device (A) of the present invention, which is installed at the upper portion of a bridge pier (10) to support a truss girder of a steel pipe (110), comprises: a lower front socket (510); a lower rear socket (520) which is spaced rearward from the lower front socket (510); an upper front socket (530) which is spaced upward from the lower front socket (510); and an upper rear socket (540) which is spaced rearward from the upper front socket (530). Here, the lower front socket (510) and the upper front socket (530), and the lower rear socket (520) and the upper rear socket (540) are coupled while maintaining an interval by a standing connecting member (550). The lower front socket (510) and the lower rear socket (520), and the upper front socket (530) and the upper rear socket (540) are coupled while maintaining an interval by a front and rear connecting member (560). The steel pipe (110) is individually fit-coupled to one side and the other side of the lower front socket (510), the lower rear socket (520), the upper front socket (530) and the upper rear socket (540). In particular, the steel pipe (110) is individually and laterally fit-coupled to one side and the other side of the lower front socket (510), the lower rear socket (520), the upper front socket (530) and the upper rear socket (540) as in Figure 2. Therefore, after the steel pipe truss girder support device (A) is installed, the steel pipe (110) can be easily installed to shorten a construction period.
교각(10) 상부에 설치되어 강관(110) 트러스 거더를 지지하는 본원발명의 강관 트러스 거더 받침장치(A)는 하측전방소켓(510); 하측전방소켓(510)의 후방으로 이격되어 형성된 하측후방소켓(520); 하측전방소켓(510)의 상측으로 이격되어 형성된 상측전방소켓(530); 상측전방소켓(530)의 후방으로 이격되어 형성된 상측후방소켓(540);을 포함하되, 하측전방소켓(510)과 상측전방소켓(530) 및 하측후방소켓(520)과 상측후방소켓(540)은 기립연결부재(550)에 의해 간격이 유지된 상태로 결합되고, 하측전방소켓(510)과 하측후방소켓(520) 및 상측전방소켓(530)과 상측후방소켓(540)은 전후방연결부재(560)에 의해 간격이 유지된 상태로 결합되며, 하측전방소켓(510), 하측후방소켓(520), 상측전방소켓(530), 상측후방소켓(540)에는 일측과 타측으로 강관(110)이 각각 끼움결합된다. 이 경우, 강관(110)은 도 2와 같이 측방에서 하측전방소켓(510), 하측후방소켓(520), 상측전방소켓(530), 상측후방소켓(540)의 일측과 타측에 각각 끼움결합된다. 따라서 강관 트러스 거더 받침장치(A) 설치 이후에는 강관(110)의 설치가 용이하여 시공시간을 단축할 수 있다.
BEARING FOR TRUSS GIRDER AND BRIDGE CONSTRUCTION METHOD THEREOF
A steel pipe truss girder support device (A) of the present invention, which is installed at the upper portion of a bridge pier (10) to support a truss girder of a steel pipe (110), comprises: a lower front socket (510); a lower rear socket (520) which is spaced rearward from the lower front socket (510); an upper front socket (530) which is spaced upward from the lower front socket (510); and an upper rear socket (540) which is spaced rearward from the upper front socket (530). Here, the lower front socket (510) and the upper front socket (530), and the lower rear socket (520) and the upper rear socket (540) are coupled while maintaining an interval by a standing connecting member (550). The lower front socket (510) and the lower rear socket (520), and the upper front socket (530) and the upper rear socket (540) are coupled while maintaining an interval by a front and rear connecting member (560). The steel pipe (110) is individually fit-coupled to one side and the other side of the lower front socket (510), the lower rear socket (520), the upper front socket (530) and the upper rear socket (540). In particular, the steel pipe (110) is individually and laterally fit-coupled to one side and the other side of the lower front socket (510), the lower rear socket (520), the upper front socket (530) and the upper rear socket (540) as in Figure 2. Therefore, after the steel pipe truss girder support device (A) is installed, the steel pipe (110) can be easily installed to shorten a construction period.
교각(10) 상부에 설치되어 강관(110) 트러스 거더를 지지하는 본원발명의 강관 트러스 거더 받침장치(A)는 하측전방소켓(510); 하측전방소켓(510)의 후방으로 이격되어 형성된 하측후방소켓(520); 하측전방소켓(510)의 상측으로 이격되어 형성된 상측전방소켓(530); 상측전방소켓(530)의 후방으로 이격되어 형성된 상측후방소켓(540);을 포함하되, 하측전방소켓(510)과 상측전방소켓(530) 및 하측후방소켓(520)과 상측후방소켓(540)은 기립연결부재(550)에 의해 간격이 유지된 상태로 결합되고, 하측전방소켓(510)과 하측후방소켓(520) 및 상측전방소켓(530)과 상측후방소켓(540)은 전후방연결부재(560)에 의해 간격이 유지된 상태로 결합되며, 하측전방소켓(510), 하측후방소켓(520), 상측전방소켓(530), 상측후방소켓(540)에는 일측과 타측으로 강관(110)이 각각 끼움결합된다. 이 경우, 강관(110)은 도 2와 같이 측방에서 하측전방소켓(510), 하측후방소켓(520), 상측전방소켓(530), 상측후방소켓(540)의 일측과 타측에 각각 끼움결합된다. 따라서 강관 트러스 거더 받침장치(A) 설치 이후에는 강관(110)의 설치가 용이하여 시공시간을 단축할 수 있다.
BEARING FOR TRUSS GIRDER AND BRIDGE CONSTRUCTION METHOD THEREOF
강관 트러스 거더 받침장치 및 이를 이용한 교량 시공방법
KIM MIN JOONG (Autor:in)
04.06.2020
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
I-shaped truss girder, truss girder bridge and construction method
Europäisches Patentamt | 2020
|Steel truss girder construction method, steel truss girder and bridge structure
Europäisches Patentamt | 2024
|Steel truss girder bridge floor and steel truss girder bridge
Europäisches Patentamt | 2022
|Construction method of steel truss girder arch bridge
Europäisches Patentamt | 2023
|