The present invention relates to a structure constructing method using the ground bearing capacity, which saves the number of piles using the ground bearing capacity to be economically superior by supporting a preceding load due to a lower floor part by means of the ground bearing capacity through the concrete foundation, and supporting a trailing load due to an upper floor part by means of the bearing force of the supporting pile supporting the concrete foundation when constructing a new structure. The present invention comprises the steps of: (a) constructing the support pile for allowing a head part thereof to protrude over the ground by embedding the support pile in the ground on which the structure is to be constructed; (b) constructing the concrete foundation over the ground so that the head part of the support pile is embedded therein, while the upper end is closed with an earth pressing plate, and the lower end is opened so that the head part of the support pile is inserted into the lower part, and a cap member installed at the upper end of the support pile is provided for allowing the upper end of the support pile to be spaced apart from the earth pressing plate so that a vertical relative displacement between the support pile and the concrete foundation is allowed within a preset value; (c) inducing ground subsidence by pre-constructing the lower floor part of the structure on the upper part of the concrete foundation and applying the preceding load (P_1) due to the lower floor part to the concrete foundation; and (d) supporting the trailing load (P_2) due to the upper floor part by means of the support pile by constructing the upper floor part, which is a residual structure, on the upper part of the lower floor part in a state in which the relative vertical displacement value between the support pile and the concrete foundation reaches an allowance.
본 발명은 신축 구조물 시공시, 저층부에 의한 선행하중은 콘크리트 기초를 통해 지반 지내력에 의해 지지하고 상층부에 의한 후행하중은 콘크리트 기초를 지지하는 지지파일의 지지력에 의해 지지하여, 지반 지내력 활용으로 파일 본수를 절감하여 경제성이 우수한 지반 지내력을 이용한 구조물 구축 방법에 대한 것이다.본 발명은 (a) 구조물이 신축될 지반의 내부에 지지파일을 근입하여 지지파일의 두부가 지반 상부로 돌출되도록 시공하는 단계; (b) 상기 지지파일의 두부가 내부에 매입되도록 상기 지반의 상부에 콘크리트 기초를 시공하되, 상단은 지압플레이트로 폐쇄되고, 하단은 개방되어 지지파일의 두부가 하부에 삽입되는 것으로 지지파일의 상단과 지압플레이트의 사이가 이격되도록 지지파일 상단에 설치되는 캡부재가 구비되어 지지파일과 콘크리트 기초의 수직 방향 상대 변위가 사전 설정된 값 이내로 허용되도록 하는 단계; (c) 상기 콘크리트 기초의 상부에 구조물의 저층부를 선시공하여 저층부에 의한 선행하중(P1)을 콘크리트 기초에 가함으로써 지반 침하를 유도하는 단계; 및 (d) 상기 지지파일과 콘크리트 기초가 허용 수직 상대 변위 값에 도달한 상태에서 저층부의 상부에 잔여 구조물인 상층부를 시공하여 상층부에 의한 후행하중(P2)을 지지파일에 의해 지지시키는 단계; 로 구성된다.
Construction method of structure using ground bearing capacity
The present invention relates to a structure constructing method using the ground bearing capacity, which saves the number of piles using the ground bearing capacity to be economically superior by supporting a preceding load due to a lower floor part by means of the ground bearing capacity through the concrete foundation, and supporting a trailing load due to an upper floor part by means of the bearing force of the supporting pile supporting the concrete foundation when constructing a new structure. The present invention comprises the steps of: (a) constructing the support pile for allowing a head part thereof to protrude over the ground by embedding the support pile in the ground on which the structure is to be constructed; (b) constructing the concrete foundation over the ground so that the head part of the support pile is embedded therein, while the upper end is closed with an earth pressing plate, and the lower end is opened so that the head part of the support pile is inserted into the lower part, and a cap member installed at the upper end of the support pile is provided for allowing the upper end of the support pile to be spaced apart from the earth pressing plate so that a vertical relative displacement between the support pile and the concrete foundation is allowed within a preset value; (c) inducing ground subsidence by pre-constructing the lower floor part of the structure on the upper part of the concrete foundation and applying the preceding load (P_1) due to the lower floor part to the concrete foundation; and (d) supporting the trailing load (P_2) due to the upper floor part by means of the support pile by constructing the upper floor part, which is a residual structure, on the upper part of the lower floor part in a state in which the relative vertical displacement value between the support pile and the concrete foundation reaches an allowance.
본 발명은 신축 구조물 시공시, 저층부에 의한 선행하중은 콘크리트 기초를 통해 지반 지내력에 의해 지지하고 상층부에 의한 후행하중은 콘크리트 기초를 지지하는 지지파일의 지지력에 의해 지지하여, 지반 지내력 활용으로 파일 본수를 절감하여 경제성이 우수한 지반 지내력을 이용한 구조물 구축 방법에 대한 것이다.본 발명은 (a) 구조물이 신축될 지반의 내부에 지지파일을 근입하여 지지파일의 두부가 지반 상부로 돌출되도록 시공하는 단계; (b) 상기 지지파일의 두부가 내부에 매입되도록 상기 지반의 상부에 콘크리트 기초를 시공하되, 상단은 지압플레이트로 폐쇄되고, 하단은 개방되어 지지파일의 두부가 하부에 삽입되는 것으로 지지파일의 상단과 지압플레이트의 사이가 이격되도록 지지파일 상단에 설치되는 캡부재가 구비되어 지지파일과 콘크리트 기초의 수직 방향 상대 변위가 사전 설정된 값 이내로 허용되도록 하는 단계; (c) 상기 콘크리트 기초의 상부에 구조물의 저층부를 선시공하여 저층부에 의한 선행하중(P1)을 콘크리트 기초에 가함으로써 지반 침하를 유도하는 단계; 및 (d) 상기 지지파일과 콘크리트 기초가 허용 수직 상대 변위 값에 도달한 상태에서 저층부의 상부에 잔여 구조물인 상층부를 시공하여 상층부에 의한 후행하중(P2)을 지지파일에 의해 지지시키는 단계; 로 구성된다.
Construction method of structure using ground bearing capacity
지반 지내력을 이용한 구조물 구축 방법
KIM SANG WOO (Autor:in) / KIM SEUNG EUN (Autor:in)
10.02.2021
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Springer Verlag | 2020
|High-bearing-capacity pavement structure and paving construction method
Europäisches Patentamt | 2022
|Dynamic construction method for structure for improving foundation bearing capacity
Europäisches Patentamt | 2015
|Bearing capacity analysis of reinforced ground
British Library Conference Proceedings | 1996
|Improvement of soft ground bearing capacity using synthetic meshes
Elsevier | 1985
|