Construction method for medium and large rotational penetration pile
The present invention relates to a construction method for a medium-large size Geum-saeng-su rotation intrusion pile. The method is suitable for a medium-large size pile of which the diameter of a pile body is no less than 100 mm and the diameter of a spiral wing is no less than 250 mm, a rotation intrusion pile and upper and lower extension piles are quickly and substantially combined without onsite welding to reduce time for construction, rotation intrusion is led to be terminated when the bottom of the rotation intrusion pile reaches a design depth and a torque value applied to a rotation chuck reaches a design torque value, and rotation intrusion is led to be terminated when the torque value applied to the rotation chuck exceeds the torsional strength of the rotation intrusion pile and an intrusion amount per rotation is less than the thickness of the spiral wing in a state in which the bottom of the rotation intrusion pile does not reach the design depth, thereby preventing the damage and deformation of the pile caused by excessive intrusion.
본 발명은 중대형 금생수 회전관입 말뚝 시공 방법에 관한 것으로, 말뚝 본체의 직경이 100mm 이상이고 나선형 날개의 직경이 250mm 이상인 중대형 말뚝에 적합하며, 회전관입말뚝과 하부 연장말뚝 및 상부 연장말뚝의 결합이 현장 용접 없이 신속하고 견고하게 이루어지게 하여 시공 시간을 단축할 수 있고, 회전관입말뚝의 하단이 설계깊이에 이르고 회전척에 걸리는 토크 값이 설계 토크 값에 이르면 회전관입이 종료되도록 하며, 회전관입말뚝의 하단이 설계깊이에 이르지 않은 상태에서 회전척에 걸리는 토크 값이 말뚝의 비틀림 강도를 초과할 정도로 크고 1회전 당 관입량이 나선형 날개의 두께 미만으로 되면 회전관입이 종료되도록 하여 과도한 관입으로 인한 말뚝의 변형과 파손을 방지할 수 있도록 한 것이다.
Construction method for medium and large rotational penetration pile
The present invention relates to a construction method for a medium-large size Geum-saeng-su rotation intrusion pile. The method is suitable for a medium-large size pile of which the diameter of a pile body is no less than 100 mm and the diameter of a spiral wing is no less than 250 mm, a rotation intrusion pile and upper and lower extension piles are quickly and substantially combined without onsite welding to reduce time for construction, rotation intrusion is led to be terminated when the bottom of the rotation intrusion pile reaches a design depth and a torque value applied to a rotation chuck reaches a design torque value, and rotation intrusion is led to be terminated when the torque value applied to the rotation chuck exceeds the torsional strength of the rotation intrusion pile and an intrusion amount per rotation is less than the thickness of the spiral wing in a state in which the bottom of the rotation intrusion pile does not reach the design depth, thereby preventing the damage and deformation of the pile caused by excessive intrusion.
본 발명은 중대형 금생수 회전관입 말뚝 시공 방법에 관한 것으로, 말뚝 본체의 직경이 100mm 이상이고 나선형 날개의 직경이 250mm 이상인 중대형 말뚝에 적합하며, 회전관입말뚝과 하부 연장말뚝 및 상부 연장말뚝의 결합이 현장 용접 없이 신속하고 견고하게 이루어지게 하여 시공 시간을 단축할 수 있고, 회전관입말뚝의 하단이 설계깊이에 이르고 회전척에 걸리는 토크 값이 설계 토크 값에 이르면 회전관입이 종료되도록 하며, 회전관입말뚝의 하단이 설계깊이에 이르지 않은 상태에서 회전척에 걸리는 토크 값이 말뚝의 비틀림 강도를 초과할 정도로 크고 1회전 당 관입량이 나선형 날개의 두께 미만으로 되면 회전관입이 종료되도록 하여 과도한 관입으로 인한 말뚝의 변형과 파손을 방지할 수 있도록 한 것이다.
Construction method for medium and large rotational penetration pile
중대형 금생수 회전관입 말뚝 시공 방법
YOO MIN SANG (Autor:in) / SEO HAN SOO (Autor:in) / KIM SUN HOUNG (Autor:in)
24.03.2021
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Rotational penetration pile unit rotational penetration pile and construction method thereof
Europäisches Patentamt | 2017
|Medium-large rotational penetration joint assembly and construction method using the same
Europäisches Patentamt | 2024
|