A method of construction for temporary retaining wall and sheating work cup using its method
The present invention relates to a method of construction for a temporary retaining wall and a retaining cup therefor, which are able to, in a construction for a temporary retaining wall, primarily place mortar in an excavation hole, and prevent soil and sand, which is remaining in an auxiliary punching instrument when a casing is taken out from the excavation hole, from falling and being accumulated on the primary mortar layer in the excavation hole. The method of construction for the temporary retaining wall comprises: a first step to form an excavation hole in the ground by using the auxiliary punching instrument, and insert a casing configuring a vertical pipe shape into the excavation hole; a second step to take out the auxiliary punching instrument from the excavation hole with the casing left in the excavation hole; a third step to insert an H-beam into the casing, fill the casing with mortar, and form a first mortar layer; a fourth step to install a retaining cup on a lower side of the auxiliary punching instrument, and take out the casing from the excavation hole; and a fifth step to put mortar on the first mortar layer in the excavation hole, and form a second mortar layer.
본 발명은 가설 흙막이 공사시 굴착공에 몰탈을 1차 타설후, 굴착공에서 케이싱을 인발할 때 천공용 부속 기기에 남아 있던 토사가 낙하되어 굴착공 내부의 1차 몰탈층 위에 쌓이는 것을 사전에 차단 및 방지할 수 있도록 한 가설 흙막이 공법 및 그 공법에 사용되는 흙받이컵에 관한 것으로서, 천공용 부속 기기를 이용해 땅에 굴착공을 형성한 후 수직의 파이프 형태를 이루는 케이싱을 상기 굴착공에 인입시키는 제1 단계와; 상기 케이싱을 굴착공에 남겨둔 상태로 천공용 부속 기기를 굴착공에서 인발하는 제2 단계와; 상기 케이싱 내부에 H빔을 삽입한 후 몰탈을 충진하여 제1 몰탈층을 형성하는 제3 단계와; 상기 천공용 부속 기기의 하부에 흙받이컵을 설치한 후 케이싱을 굴착공에서 인발하는 제4 단계와; 상기 굴착공 내부의 제1 몰탈층 위에 다시 몰탈을 충진하여 제2 몰탈층을 형성하는 제5 단계;로 이루어진 것이다.
A method of construction for temporary retaining wall and sheating work cup using its method
The present invention relates to a method of construction for a temporary retaining wall and a retaining cup therefor, which are able to, in a construction for a temporary retaining wall, primarily place mortar in an excavation hole, and prevent soil and sand, which is remaining in an auxiliary punching instrument when a casing is taken out from the excavation hole, from falling and being accumulated on the primary mortar layer in the excavation hole. The method of construction for the temporary retaining wall comprises: a first step to form an excavation hole in the ground by using the auxiliary punching instrument, and insert a casing configuring a vertical pipe shape into the excavation hole; a second step to take out the auxiliary punching instrument from the excavation hole with the casing left in the excavation hole; a third step to insert an H-beam into the casing, fill the casing with mortar, and form a first mortar layer; a fourth step to install a retaining cup on a lower side of the auxiliary punching instrument, and take out the casing from the excavation hole; and a fifth step to put mortar on the first mortar layer in the excavation hole, and form a second mortar layer.
본 발명은 가설 흙막이 공사시 굴착공에 몰탈을 1차 타설후, 굴착공에서 케이싱을 인발할 때 천공용 부속 기기에 남아 있던 토사가 낙하되어 굴착공 내부의 1차 몰탈층 위에 쌓이는 것을 사전에 차단 및 방지할 수 있도록 한 가설 흙막이 공법 및 그 공법에 사용되는 흙받이컵에 관한 것으로서, 천공용 부속 기기를 이용해 땅에 굴착공을 형성한 후 수직의 파이프 형태를 이루는 케이싱을 상기 굴착공에 인입시키는 제1 단계와; 상기 케이싱을 굴착공에 남겨둔 상태로 천공용 부속 기기를 굴착공에서 인발하는 제2 단계와; 상기 케이싱 내부에 H빔을 삽입한 후 몰탈을 충진하여 제1 몰탈층을 형성하는 제3 단계와; 상기 천공용 부속 기기의 하부에 흙받이컵을 설치한 후 케이싱을 굴착공에서 인발하는 제4 단계와; 상기 굴착공 내부의 제1 몰탈층 위에 다시 몰탈을 충진하여 제2 몰탈층을 형성하는 제5 단계;로 이루어진 것이다.
A method of construction for temporary retaining wall and sheating work cup using its method
가설 흙막이 공법 및 그 공법에 사용되는 흙받이컵
NAMGUNG BOO HAK (Autor:in)
21.06.2021
Patent
Elektronische Ressource
Koreanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Sheating work cup using method of construction for temporary retaining wall
Europäisches Patentamt | 2021