CFT CFT CONSTRUCTION METHOD FOR COLUMM INTERGRATED CFT PILE AND COLUMM INTERGRATED CFT USED THE SAME
A column-integrated CFT pile construction method is disclosed. The column-integrated CFT pile construction method includes the steps of: excavating to a preset depth using an incasing to form a drilling hole with the incasing inserted, connecting an upper steel column and a lower steel pipe pile vertically, and preparing a column-integrated CFT pile in which the steel pipe pile is filled with concrete; (b) pouring a main surface cementitious filler on the lower end of the drilling hole; (c) inserting the column-integrated CFT pile into the drilling hole so that at least a portion of the steel pipe pile is surrounded by the main surface cementitious filler; and (d) filling the remaining space in the drilling hole with soil and pulling out the incasing. Accordingly, excessive construction can be prevented.
기둥일체형 CFT 파일 시공 방법이 개시되며, 상기 기둥일체형 CFT 파일 시공 방법은, (a) 인케이싱을 이용하여 미리 설정된 깊이까지 굴착되어 상기 인케이싱이 삽입된 상태의 천공홀을 형성하고, 상부의 철골 컬럼과 하부의 강관 파일이 상하로 연결되되 상기 강관 파일 내부가 콘크리트로 채워진 기둥일체형 CFT파일을 준비하는 단계; (b) 상기 천공홀의 하단부에 주면 시멘트질 충진재를 타설하는 단계; (c) 상기 강관 파일의 적어도 일부가 상기 주면 시멘트질 충진재에 의해 둘러싸이도록 상기 천공홀에 상기 기둥일체형 CFT 파일을삽입하는 단계; 및 (d) 상기 천공홀 중 잔여 공간에 대한 흙 속채움을 수행하고 상기 인케이싱을 인발하는 단계를 포함한다.
CFT CFT CONSTRUCTION METHOD FOR COLUMM INTERGRATED CFT PILE AND COLUMM INTERGRATED CFT USED THE SAME
A column-integrated CFT pile construction method is disclosed. The column-integrated CFT pile construction method includes the steps of: excavating to a preset depth using an incasing to form a drilling hole with the incasing inserted, connecting an upper steel column and a lower steel pipe pile vertically, and preparing a column-integrated CFT pile in which the steel pipe pile is filled with concrete; (b) pouring a main surface cementitious filler on the lower end of the drilling hole; (c) inserting the column-integrated CFT pile into the drilling hole so that at least a portion of the steel pipe pile is surrounded by the main surface cementitious filler; and (d) filling the remaining space in the drilling hole with soil and pulling out the incasing. Accordingly, excessive construction can be prevented.
기둥일체형 CFT 파일 시공 방법이 개시되며, 상기 기둥일체형 CFT 파일 시공 방법은, (a) 인케이싱을 이용하여 미리 설정된 깊이까지 굴착되어 상기 인케이싱이 삽입된 상태의 천공홀을 형성하고, 상부의 철골 컬럼과 하부의 강관 파일이 상하로 연결되되 상기 강관 파일 내부가 콘크리트로 채워진 기둥일체형 CFT파일을 준비하는 단계; (b) 상기 천공홀의 하단부에 주면 시멘트질 충진재를 타설하는 단계; (c) 상기 강관 파일의 적어도 일부가 상기 주면 시멘트질 충진재에 의해 둘러싸이도록 상기 천공홀에 상기 기둥일체형 CFT 파일을삽입하는 단계; 및 (d) 상기 천공홀 중 잔여 공간에 대한 흙 속채움을 수행하고 상기 인케이싱을 인발하는 단계를 포함한다.
CFT CFT CONSTRUCTION METHOD FOR COLUMM INTERGRATED CFT PILE AND COLUMM INTERGRATED CFT USED THE SAME
기둥일체형 CFT 파일 시공 방법 및 이에 적용되는 기둥일체형 CFT 파일
CHOI WOONG SIK (Autor:in) / KIM TAE NYOUNG (Autor:in) / JUNG IL RYANG (Autor:in) / KIM JU WOONG (Autor:in) / KO YONG SEOK (Autor:in) / KIM KYEONG HUN (Autor:in) / KIM DAE GWON (Autor:in) / YANG SEUNG JUN (Autor:in) / HEO SOO (Autor:in)