Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
HYBRID CABLE PEDESTRIAN SUSPENSION BRIDGE AND CONTRUCTION METHOD THEREOF
The present invention relates to a hybrid cable pedestrian bridge and a construction method thereof. The hybrid cable pedestrian bridge includes: a main tower installed between one abutment and the other abutment; a main cable connected from the one abutment to the other abutment via the main tower; and a plurality of girder segments including a segment foothold, and a segment frame supporting the segment foothold, and consecutively disposed from the one abutment to the main tower to be supported by the main cable, thereby forming a walkway with the segment footholds consecutively arranged, wherein a cable girder includes a suspension support section in which the girder segments are supported through a hanger cable, and a direct support section in which a first accepting part formed on an extension member is penetrated by the main cable to be directly supported by the main cable. Therefore, the hybrid cable pedestrian bridge is capable of guaranteeing walking convenience for the elderly by reducing the height of the main tower as well as the length of a sag and keeping gradual the inclination of an end (Ae) of a bridge walkway; preventing the spoilage of beauty by eliminating the need for a main tower stood on both abutments; reducing manufacturing costs and time; and creating a sophisticated appearance.
본 발명은 하이브리드 케이블 보도 교량 및 그 시공 방법에 관한 것으로, 일측 교대와 타측 교대의 사이에 설치된 주탑과; 상기 일측 교대로부터 주탑을 경유하여 상기 타측 교대로 연결되는 주케이블과; 세그먼트 발판과, 상기 세그먼트 발판을 지지하는 세그먼트 프레임을 구비하고, 상기 주케이블에 의해 지지되도록 상기 일측 교대로부터 상기 주탑까지 연속 배치되어, 상기 세그먼트 발판이 연속 배열되어 보행로를 형성하는 다수의 거더 세그먼트를; 포함하여 구성되되, 케이블 거더는, 행어 케이블을 매개로 상기 거더 세그먼트가 지지되는 현수 지지 구간과; 연장 부재에 형성된 제1수용부를 상기 주케이블이 관통하여 주케이블에 의해 직접 지지되는 직접 지지 구간을; 포함하여 구획되어, 주탑의 높이를 낮추고 새그 길이를 함께 낮추어 교량 보행로의 단부(Ae) 경사도를 완만하게 유지하여 노약자의 보행 편리성을 보장할 수 있고, 양측 교대에 주탑을 세우지 않아 미관을 해치지 않으며, 시공 비용과 기간을 낮추고, 세련된 미관을 구현하는 하이브리드 케이블 보도 교량 및 그 시공 방법을 제공한다.
HYBRID CABLE PEDESTRIAN SUSPENSION BRIDGE AND CONTRUCTION METHOD THEREOF
The present invention relates to a hybrid cable pedestrian bridge and a construction method thereof. The hybrid cable pedestrian bridge includes: a main tower installed between one abutment and the other abutment; a main cable connected from the one abutment to the other abutment via the main tower; and a plurality of girder segments including a segment foothold, and a segment frame supporting the segment foothold, and consecutively disposed from the one abutment to the main tower to be supported by the main cable, thereby forming a walkway with the segment footholds consecutively arranged, wherein a cable girder includes a suspension support section in which the girder segments are supported through a hanger cable, and a direct support section in which a first accepting part formed on an extension member is penetrated by the main cable to be directly supported by the main cable. Therefore, the hybrid cable pedestrian bridge is capable of guaranteeing walking convenience for the elderly by reducing the height of the main tower as well as the length of a sag and keeping gradual the inclination of an end (Ae) of a bridge walkway; preventing the spoilage of beauty by eliminating the need for a main tower stood on both abutments; reducing manufacturing costs and time; and creating a sophisticated appearance.
본 발명은 하이브리드 케이블 보도 교량 및 그 시공 방법에 관한 것으로, 일측 교대와 타측 교대의 사이에 설치된 주탑과; 상기 일측 교대로부터 주탑을 경유하여 상기 타측 교대로 연결되는 주케이블과; 세그먼트 발판과, 상기 세그먼트 발판을 지지하는 세그먼트 프레임을 구비하고, 상기 주케이블에 의해 지지되도록 상기 일측 교대로부터 상기 주탑까지 연속 배치되어, 상기 세그먼트 발판이 연속 배열되어 보행로를 형성하는 다수의 거더 세그먼트를; 포함하여 구성되되, 케이블 거더는, 행어 케이블을 매개로 상기 거더 세그먼트가 지지되는 현수 지지 구간과; 연장 부재에 형성된 제1수용부를 상기 주케이블이 관통하여 주케이블에 의해 직접 지지되는 직접 지지 구간을; 포함하여 구획되어, 주탑의 높이를 낮추고 새그 길이를 함께 낮추어 교량 보행로의 단부(Ae) 경사도를 완만하게 유지하여 노약자의 보행 편리성을 보장할 수 있고, 양측 교대에 주탑을 세우지 않아 미관을 해치지 않으며, 시공 비용과 기간을 낮추고, 세련된 미관을 구현하는 하이브리드 케이블 보도 교량 및 그 시공 방법을 제공한다.
HYBRID CABLE PEDESTRIAN SUSPENSION BRIDGE AND CONTRUCTION METHOD THEREOF
하이브리드 케이블 보도교 및 그 시공 방법
SHIN SANG HUN (Autor:in)
13.06.2023
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
HYBRID CABLE PEDESTRIAN SUSPENSION BRIDGE AND CONTRUCTION METHOD THEREOF
Europäisches Patentamt | 2024
|CABLE PEDESTRIAN SUSPENSION BRIDGE AND CONTRUCTION METHOD THEREOF
Europäisches Patentamt | 2021
|CABLE PEDESTRIAN BRIDGE AND CONTRUCTION METHOD THEREOF
Europäisches Patentamt | 2024
|Cable saddle component for pedestrian suspension bridge
Europäisches Patentamt | 2023
|