Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
EARTH PRESSURE SEPERATION TYPE INTEGRAL ABUTMENT BRIDGE AND CONSTRUCTION METHOD THEREOF
The present invention relates to an integrated abutment bridge and a construction method thereof. The integrated abutment bridge includes: multiple exposure piles installed into the ground of a bridge starting point and a bridge ending point; pile connection blocks including multiple girder insertion grooves on the top and multiple pile insertion holes on the underside wherein each end of the exposure piles are inserted; multiple girders placed on the pile connection blocks to allow the ends to be inserted into the girder insertion grooves of the pile connection blocks; and an upper slab formed on the top surfaces of the pile connection blocks and the girders. The present invention is capable of shortening a construction period of a bridge and enables simple construction of the bridge. In addition, the present invention is capable of simplifying a configuration of an abutment of the bridge, thereby facilitating the maintenance of the bridge.
본 발명은 교대 일체형 교량 및 그 시공방법에 관한 것으로, 본 발명은 교량의 시점부 지반과 종점부 지반에 각각 설치된 복수 개의 노출형 말뚝들; 상부에 복수 개의 거더삽입홈들이 구비되며, 하면에 복수 개의 말뚝삽입홀들이 구비되어 상기 말뚝삽입홀들에 각각 상기 노출형 말뚝들의 각 단부가 삽입되는 말뚝연결블록; 상기 말뚝연결블록의 거더삽입홈들에 단부가 각각 삽입되도록 상기 말뚝연결블록에 거치되는 복수 개의 거더들; 상기 말뚝연결블록의 상면과 상기 거더들의 상면에 구비되는 상부 슬래브;를 포함한다. 본 발명에 따르면 교량의 시공 시간을 짧게 하고 시공이 간단하다. 또한 교량의 교대 부분의 구성을 간단하게 하여 교량의 유지보수가 수월하게 된다.
EARTH PRESSURE SEPERATION TYPE INTEGRAL ABUTMENT BRIDGE AND CONSTRUCTION METHOD THEREOF
The present invention relates to an integrated abutment bridge and a construction method thereof. The integrated abutment bridge includes: multiple exposure piles installed into the ground of a bridge starting point and a bridge ending point; pile connection blocks including multiple girder insertion grooves on the top and multiple pile insertion holes on the underside wherein each end of the exposure piles are inserted; multiple girders placed on the pile connection blocks to allow the ends to be inserted into the girder insertion grooves of the pile connection blocks; and an upper slab formed on the top surfaces of the pile connection blocks and the girders. The present invention is capable of shortening a construction period of a bridge and enables simple construction of the bridge. In addition, the present invention is capable of simplifying a configuration of an abutment of the bridge, thereby facilitating the maintenance of the bridge.
본 발명은 교대 일체형 교량 및 그 시공방법에 관한 것으로, 본 발명은 교량의 시점부 지반과 종점부 지반에 각각 설치된 복수 개의 노출형 말뚝들; 상부에 복수 개의 거더삽입홈들이 구비되며, 하면에 복수 개의 말뚝삽입홀들이 구비되어 상기 말뚝삽입홀들에 각각 상기 노출형 말뚝들의 각 단부가 삽입되는 말뚝연결블록; 상기 말뚝연결블록의 거더삽입홈들에 단부가 각각 삽입되도록 상기 말뚝연결블록에 거치되는 복수 개의 거더들; 상기 말뚝연결블록의 상면과 상기 거더들의 상면에 구비되는 상부 슬래브;를 포함한다. 본 발명에 따르면 교량의 시공 시간을 짧게 하고 시공이 간단하다. 또한 교량의 교대 부분의 구성을 간단하게 하여 교량의 유지보수가 수월하게 된다.
EARTH PRESSURE SEPERATION TYPE INTEGRAL ABUTMENT BRIDGE AND CONSTRUCTION METHOD THEREOF
토압 분리형 일체식 교량 및 그 시공방법
KIM TAE SU (Autor:in) / NAM MOON SEOK (Autor:in) / KIM HONG JONG (Autor:in) / PARK YOUNG HO (Autor:in)
31.12.2015
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
EARTH PRESSURE SEPERATION TYPE INTEGRAL ABUTMENT BRIDGE AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2016
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Integral Abutment Bridge Design and Construction
NTIS | 1987
|